Nuclear Regulatory Commission September 8, 2023 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos. 3 and 4
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is issuing for public comment draft environmental impact statement (EIS) NUREG-1437, Supplement 5a, Second Renewal, ``Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment.'' Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point) is located in Homestead, Florida, approximately 25 miles south-southwest of Miami. Possible alternatives to the proposed action of subsequent license renewal for Turkey Point include the no-action alternative and reasonable replacement power alternatives. A new notice of opportunity to request a hearing and petition for leave to intervenelimited to contentions based on new information in the draft EISis also being issued.
Northern States Power Company; Prairie Island Independent Spent Fuel Storage Installation
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has received a license amendment application from Northern States Power Company (NSPM) for an amendment to Materials License No. SNM-2506 for the Prairie Island Independent Spent Fuel Storage Installation (PI ISFSI) located in Welch, Minnesota. The amendment request seeks to revise the technical specifications (TS) for the PI ISFSI. NSPM proposes to allow use of a Code alternative as an option to the requirements of the 2004 Edition through 2006 Addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, Section III, Division 1, Subsection NB, Paragraph NB-5130, by revising the TS to add the Code alternative to TS section 4.4, table 4.4-1, TN-40HT ASME Code Exceptions.
Increased Enrichment of Conventional and Accident Tolerant Fuel Designs for Light-Water Reactors
The U.S. Nuclear Regulatory Commission (NRC) is requesting comments on a regulatory basis to support a rulemaking to amend the NRC's regulations related to the use of conventional and accident tolerant light-water reactor fuel designs. The NRC's goal is to establish effective and efficient licensing of applications using fuels enriched to greater than 5.0 and less than 20.0 weight percent uranium- 235. The NRC will hold a public meeting to promote a full understanding of the planned rulemaking and facilitate public comment on the regulatory basis.
Draft Regulatory Guide: Guidance for a Technology-Inclusive Content-of-Application Methodology To Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors
The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on Appendix B and conforming changes to other parts of its draft Regulatory Guide (DG), DG-1404, Revision 1 ``Guidance for a Technology-Inclusive Content-of-Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors.'' On May 25, 2023, the NRC published Revision 0 to DG-1404 requesting public comment, and on June 28, 2023, the NRC extended the public comment period to August 10, 2023. Since then, and consistent with item 1 in Appendix A to DG-1404, Revision 0, the NRC completed its development of Appendix B and revised DG-1404 (i.e., Revision 1) to include this appendix and made conforming changes to other parts of the document. Appendix B provides additional guidance for the scope, level of detail, elements, and plant representation for a probabilistic risk assessment (PRA) supporting a Licensing Modernization Project (LMP)-based construction permit application.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.