Nuclear Regulatory Commission August 2, 2023 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Proposed Revision to Standard Review Plan Section 15.0, “Introduction-Transient and Accident Analyses”
The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on draft NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 15.0, Revision 4, ``IntroductionTransient and Accident Analyses.'' The NRC seeks comments on the proposed draft section revision of the Standard Review Plan (SRP), concerning the evaluation of the safety of a nuclear power plant that requires analyses of the plant's responses to postulated equipment failures or malfunctions. Such analyses help to determine the limiting conditions for operation, limiting safety system settings, and design specifications for components and systems to protect public health and safety.
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Unit 4; Operation Under a Combined License
The U.S. Nuclear Regulatory Commission (NRC) found pursuant to its regulations that the acceptance criteria in the combined license for Vogtle Electric Generating Plant (VEGP), Unit 4 are met. Because of this action, operation of the facility is allowed in accordance with the terms and conditions of the license.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.