Nuclear Regulatory Commission March 27, 2023 – Federal Register Recent Federal Regulation Documents

Regulatory Guide: Maintenance, Testing, and Replacement of Vented Lead-Acid Storage Batteries for Production and Utilization Facilities l
Document Number: 2023-06285
Type: Rule
Date: 2023-03-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 4 of Regulatory Guide (RG) 1.129, ``Maintenance, Testing, and Replacement of Vented Lead-Acid Storage Batteries for Production and Utilization Facilities.'' This revised guidance provides information to manage vented lead-acid battery degradation such that a battery in service would retain its readiness for supporting design-basis events. It endorses, with certain clarifying regulatory positions, Institute of Electrical and Electronics Engineers (IEEE) Standard (Std.) 450-2020, which provides the recommended maintenance, test schedules, and testing procedures intended to optimize the life and performance of permanently installed vented lead-acid storage batteries used for standby power applications. It also provides guidance to determine when batteries should be replaced.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.