Nuclear Regulatory Commission November 15, 2022 – Federal Register Recent Federal Regulation Documents

TMI-2 Solutions, LLC; Establishment of Atomic Safety and Licensing Board
Document Number: 2022-24867
Type: Notice
Date: 2022-11-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Operational Leakage
Document Number: 2022-24750
Type: Rule
Date: 2022-11-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Regulatory Issue Summary (RIS) 2022-02, ``Operational Leakage.'' This RIS clarifies the NRC staff's position on the NRC requirements for evaluation, control, and treatment of operational leakage in systems required to be operable by plant technical specifications (TS). This RIS is intended for all holders of operating licenses and combined licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel. This RIS emphasizes that operational leakage must be addressed in the same manner as leakage detected during an American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, Section XI, pressure test. That is, when operational leakage is found in a system that is within the scope of ASME BPV Code, Section XI, and is required to be operable by plant TS, the component must be evaluated by the licensee for operability. Structural integrity determinations must be conducted in accordance with the applicable provisions of the original construction code, the ASME BPVC, Section XI, or otherwise addressed through authorized methods.
Notice of Intent To Conduct Scoping Process and Prepare Supplement To Draft Environmental Impact Statement Virginia Electric and Power Company North Anna Power, Units 1 and 2
Document Number: 2022-24746
Type: Notice
Date: 2022-11-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has received Environmental Report, Supplement 1, from Virginia Electric and Power Company (Dominion, the applicant), dated September 28, 2022, related to Dominion's application for subsequent license renewal (SLR) of Renewed Facility Operating License Nos. NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2 (North Anna). The NRC staff will prepare a supplement to its draft supplemental environmental impact statement (DSEIS) for North Anna subsequent license renewal, i.e., NUREG-1437, Supplement 7, Second Renewal, ``Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 7, Second Renewal, Regarding Subsequent License Renewal for North Anna Power Station Units 1 and 2, Draft Report'' (August 2021). The subsequent renewed operating licenses would authorize the applicant to operate North Anna for an additional 20 years beyond the period specified in each of the current renewed licenses. The current renewed operating licenses for North Anna Units 1 and 2 expire on April 1, 2038, and August 21, 2040, respectively. The NRC will conduct a limited scoping process to gather information necessary to prepare a supplement to its DSEIS to evaluate the environmental impacts of SLR of the operating licenses for North Anna. The NRC is seeking public comment on the proper scope of the site- specific environmental impact statement (EIS) supplement to be prepared for this action.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.