Nuclear Regulatory Commission February 9, 2022 – Federal Register Recent Federal Regulation Documents

Kairos Power, LLC
Document Number: 2022-02671
Type: Notice
Date: 2022-02-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is providing notice that an uncontested hearing will be held on the Kairos Power, LLC (Kairos) construction permit application that proposes the construction of a test reactor, identified as Hermes, in Oak Ridge, Tennessee, at a time and place to be set in the future by the Commission or designated by the Atomic Safety and Licensing Board. This notice provides the public an opportunity to request a hearing and petition for leave to intervene (i.e., contested hearing) with respect to that application. The NRC staff is currently conducting a detailed technical review of the construction permit application. If the NRC issues a construction permit, the applicant, Kairos, would be authorized to construct its proposed test reactor in accordance with the provisions of the construction permit. Because the application contains sensitive unclassified non-safeguards information (SUNSI), this notice includes an order that imposes procedures to obtain access to SUNSI for contention preparation.
Sunshine Act Meetings
Document Number: 2022-02909
Type: Notice
Date: 2022-02-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.