Nuclear Regulatory Commission February 21, 2020 – Federal Register Recent Federal Regulation Documents

671st Meeting of the Advisory Committee on Reactor Safeguards (ACRS)
Document Number: 2020-03517
Type: Notice
Date: 2020-02-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Station, Units 1 and 2
Document Number: 2020-03470
Type: Notice
Date: 2020-02-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On December 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) received the Post-Shutdown Decommissioning Activities Report (PSDAR) for the Diablo Canyon Nuclear Power Plant (Diablo Canyon), Units 1 and 2. The PSDAR, which includes the Cost Summary from the Site-Specific Decommissioning Cost Estimate (DCE), provides an overview of the Pacific Gas and Electric Company (PG&E, the licensee) planned decommissioning activities, schedule, projected costs, and environmental impacts for Diablo Canyon, Units 1 and 2. The NRC will hold a public meeting to discuss the PSDAR and receive comments.
Pre-Earthquake Planning, Shutdown, and Restart of a Nuclear Power Plant Following an Earthquake
Document Number: 2020-03439
Type: Notice
Date: 2020-02-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 1.166, ``Pre-Earthquake Planning, Shutdown, and Restart of a Nuclear Power Plant Following an Earthquake.'' This revision of RG 1.166 merges two related RGs, that is, RG 1.166 and RG 1.167, ``Restart of a Nuclear Power Plant Shut Down by a Seismic Event.'' The guides were merged because they are similar in nature and contain overlapping guidance. RG 1.167 is being withdrawn concurrently because it is no longer needed.
Restart of a Nuclear Power Plant Shut Down by an Earthquake
Document Number: 2020-03436
Type: Notice
Date: 2020-02-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is withdrawing regulatory guide (RG), RG 1.167 ``Restart of a Nuclear Power Plant Shut Down by an Earthquake.'' The guide is being withdrawn because its guidance has been incorporated into a related guide, namely RG 1.166 ``Pre-Earthquake Planning, Shutdown, and Restart of a Nuclear Power Plant Following an Earthquake.''
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.