Sunshine Act Meetings
Document Number: 2019-22552
Type: Notice
Date: 2019-10-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Independent Spent Fuel Storage Installation; Connecticut Yankee Atomic Power Company
Document Number: 2019-22406
Type: Notice
Date: 2019-10-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption, in response to an April 24, 2019 request from Connecticut Yankee Atomic Power Company (CYAPCO or licensee), from NRC's requirement to comply with the terms, conditions, and specifications in Amendment No. 8 of the NAC International, Inc. (NAC)Multi-Purpose Canister (MPC) System Certificate of Compliance (CoC) No. 1025, Appendix A ``Technical Specifications for NAC-MPC System,'' Technical Specifications (TS) A.5.1 ``Training Program'' at the Haddam Neck Plant (HNP) independent spent fuel storage installation (ISFSI). Specifically, the exemption would relieve the licensee from the requirement to develop training modules under its Systems Approach to Training (SAT) that includes comprehensive instructions for the operation and maintenance of the ISFSI, except for the NAC-MPC System.
SHINE Medical Technologies, LLC
Document Number: 2019-22396
Type: Notice
Date: 2019-10-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) staff accepts and dockets an application submitted by SHINE Medical Technologies, LLC (SHINE), dated July 17, 2019, filed pursuant to the Atomic Energy Act of 1954, as amended, and the NRC's regulations, for an operating license for the SHINE Medical Isotope Production Facility.
Southern Nuclear Operating Company Inc.; Vogtle Electric Generating Plant Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria
Document Number: 2019-22383
Type: Notice
Date: 2019-10-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that specified inspections, tests, and analyses have been successfully completed, and that specified acceptance criteria are met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.