Southern Nuclear Operating Company Inc.; Vogtle Electric Generating Plant Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria, 55183-55184 [2019-22383]
Download as PDF
Federal Register / Vol. 84, No. 199 / Tuesday, October 15, 2019 / Notices
tone phone to participate in this
meeting. Any interested person may dial
the toll-free access number 1–888–324–
9238 or toll access number 1–517–308–
9132, and then the numeric participant
passcode: 3403297, to participate in this
meeting by telephone for both days. The
WebEx link is https://nasaenterprise.
webex.com , the meeting number is 909
467 766, and the password is
Exploration@2019 (case sensitive) for
both days.
The agenda for the meeting includes
the following topics:
—Human Exploration and Operations
Overview
—Low Earth Orbit Commercialization
—Commercial Crew
—Launch Services Program
—Exploration Systems Development
—Advanced Exploration Systems (Deep
Space Exploration)
khammond on DSKJM1Z7X2PROD with NOTICES
Attendees will be requested to sign a
register and to comply with NASA
Kennedy Space Center security
requirements, including the
presentation of a valid picture ID to
NASA Security before access to NASA
Kennedy Space Center. To attend the
meeting in person, attendees that are
U.S. citizens and Permanent Residents
(green card holders) are requested to
provide full name and citizenship status
no less than 3 working days prior to the
meeting. Foreign nationals attending
this meeting will be required to provide
a copy of their passport and visa in
addition to providing the following
information no less than 15 days prior
to the meeting: Full name; gender; date/
place of birth; citizenship; passport
information (number, country,
telephone); visa information (number,
type, expiration date); employer/
affiliation information (name of
institution, address, country,
telephone); title/position of attendee.
Information should be sent to Dr. Bette
Siegel via email at bette.siegel@
nasa.gov. It is imperative that the
meeting be held on these dates to
accommodate the scheduling priorities
of the key participants.
Patricia Rausch,
Advisory Committee Management Officer,
National Aeronautics and Space
Administration.
[FR Doc. 2019–22336 Filed 10–11–19; 8:45 am]
BILLING CODE 7510–13–P
VerDate Sep<11>2014
16:25 Oct 11, 2019
Jkt 250001
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
[Notice: (19–066)]
NASA Advisory Council; Meeting.
National Aeronautics and
Space Administration.
ACTION: Notice of meeting.
AGENCY:
In accordance with the
Federal Advisory Committee Act, as
amended, the National Aeronautics and
Space Administration (NASA)
announces a meeting of the NASA
Advisory Council (NAC).
DATES: Thursday, October 31, 2019,
10:30 a.m.–5:00 p.m.; and Friday,
November 1, 2019, 8:30 a.m.–12:00
noon, Eastern Time.
ADDRESSES: NASA Kennedy Space
Center, Headquarters Building,
Conference Room 7212, Kennedy Space
Center, Florida 32899.
FOR FURTHER INFORMATION CONTACT: Ms.
Marcia Joseph, NAC Administrative
Officer, NASA Headquarters,
Washington, DC 20546, (202) 358–4717
or marcia.joseph@nasa.gov.
SUPPLEMENTARY INFORMATION: This
meeting will be open to the public up
to the capacity of the meeting room.
This meeting is also available
telephonically and by WebEx. You must
use a touch-tone phone to participate in
this meeting. Any interested person may
dial the toll-free number 1–888–324–
3866 or toll number 1–517–308–9316
and then the numeric passcode
5441938, followed by the # sign, on both
days. NOTE: If dialing in, please ‘‘mute’’
your phone. To join via WebEx, the link
is https://nasaenterprise.webex.com/.
The meeting number on October 31 is
903 420 221 and the meeting password
is NAC31oct19! (case sensitive); the
meeting number on November 1 is 902
236 617 and the meeting password is
NAC1nov19! (case sensitive).
The agenda for the meeting will
include reports from the following:
— Aeronautics Committee
— Human Exploration and Operations
Committee
— Regulatory and Policy Committee
— Science Committee
— STEM Engagement Committee
— Technology, Innovation and
Engineering Committee
Attendees will be requested to sign a
register and to comply with NASA
Kennedy Space Center security
requirements, including the
presentation of a valid picture ID to
NASA Security before access to NASA
Kennedy Space Center. To attend the
meeting in person, attendees that are
SUMMARY:
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
55183
U.S. citizens and Permanent Residents
(green card holders) are requested to
provide full name and citizenship status
no less than 3 working days prior to the
meeting. Foreign nationals attending
this meeting will be required to provide
a copy of their passport and visa in
addition to providing the following
information no less than 15 days prior
to the meeting: Full name; gender; date/
place of birth; citizenship; passport
information (number, country,
telephone); visa information (number,
type, expiration date); employer/
affiliation information (name of
institution, address, country,
telephone); title/position of attendee.
Information should be sent to Ms.
Marcia Joseph via email at
marcia.joseph@nasa.gov. It is
imperative that the meeting be held on
these dates to accommodate the
scheduling priorities of the key
participants.
Patricia Rausch,
Advisory Committee Management Officer,
National Aeronautics and Space
Administration.
[FR Doc. 2019–22337 Filed 10–11–19; 8:45 am]
BILLING CODE 7510–13–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company
Inc.; Vogtle Electric Generating Plant
Units 3 and 4; Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that specified inspections, tests, and
analyses have been successfully
completed, and that specified
acceptance criteria are met for the
Vogtle Electric Generating Plant (VEGP),
Units 3 and 4.
DATES: Determinations of the successful
completion of inspections, tests, and
analyses for VEGP Units 3 and 4 takes
effect on the dates indicated in the NRC
staff’s verification evaluation forms for
the inspections, tests, analyses, and
acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
SUMMARY:
E:\FR\FM\15OCN1.SGM
15OCN1
55184
Federal Register / Vol. 84, No. 199 / Tuesday, October 15, 2019 / Notices
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov/ and search
for Docket ID NRC–2008–0252. Address
questions about NRC docket IDs to Anne
Frost; telephone: 301–287–9232; email:
Anne.Frost@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced in this
document (if that document is available
in ADAMS) is provided the first time
that a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3025; email: Chandu.Patel@
nrc.gov.
SUPPLEMENTARY INFORMATION:
khammond on DSKJM1Z7X2PROD with NOTICES
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC.,
MEAG Power SPVJ, LLC., MEAG Power
SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee)
has submitted ITAAC closure
notifications (ICNs) under § 52.99(c)(1)
of title 10 of the Code of Federal
Regulations (10 CFR), informing the
NRC that the licensee has successfully
performed the required inspections,
tests, and analyses, and that the
acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.08d.v (36), 2.2.03.08c.iii (182),
2.2.03.08c.iv.02 (184), 2.3.03.02
(319), 2.3.05.03a.ii (344),
2.3.05.03c.i (349), 2.3.05.03d.i
(351), 2.3.07.07b.i (402), 2.3.10.02a
(431), 3.3.00.06b (788), 2.2.05.07e
(880), and 2.3.07.07b.vii (881).
VEGP Unit 4 ITAAC
VerDate Sep<11>2014
16:25 Oct 11, 2019
Jkt 250001
2.2.03.08c.v.01 (187), 2.2.03.08d
(200), 2.3.09.03.iii (425), C.2.6.12.01
(671), C.2.6.12.02 (672), C.2.6.12.03
(673), C.2.6.12.04 (674), C.2.6.12.05
(675), and C.2.6.12.06 (676).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure
Notifications
Since the last Federal Register notice
of the NRC staff’s determinations of
successful completion of inspections,
tests, and analyses for VEGP Units 3 and
4, the NRC staff has not made additional
determinations of the successful
completion of inspections, tests, and
analyses based on licensee ITAAC postclosure notifications (IPCNs) submitted
under 10 CFR 52.99(c)(2).
III. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs and IPCNs.
Each ICN presents a narrative
description of how the ITAAC was
completed. The NRC’s ICN review
process involves a determination on
whether, among other things: (1) Each
ICN provides sufficient information,
including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed. The NRC’s review process for
IPCNs is similar to that for ICNs but
focuses on how the licensee addressed
the new material information giving rise
to the IPCN.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
NRC staff receives new information that
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
suggests the NRC staff’s determination
on any of these ITAAC is incorrect, then
the NRC staff will determine whether to
reopen that ITAAC (including
withdrawing the NRC staff’s
determination on that ITAAC). The NRC
staff’s determination will be used to
support a subsequent finding, pursuant
to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria
in the combined license are met. The
ITAAC closure process is not finalized
for these ITAAC until the NRC makes an
affirmative finding under 10 CFR
52.103(g). Any future updates to the
status of these ITAAC will be reflected
on the NRC’s website at https://
www.nrc.gov/reactors/new-reactors/
oversight/itaac.html.
This notice fulfills the NRC staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS accession
number for each ICN received, the
ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s website at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog3icnsr.pdf.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS accession
number for each ICN and IPCN received,
the ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s website at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog4icnsr.pdf.
Dated at Rockville, Maryland, this 8th day
of October, 2019.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Chief, Construction Inspection Program
Branch, Division of Licensing, Siting, and
Environmental Analysis, Office of New
Reactors.
[FR Doc. 2019–22383 Filed 10–11–19; 8:45 am]
BILLING CODE 7590–01–P
E:\FR\FM\15OCN1.SGM
15OCN1
Agencies
[Federal Register Volume 84, Number 199 (Tuesday, October 15, 2019)]
[Notices]
[Pages 55183-55184]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-22383]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company Inc.; Vogtle Electric
Generating Plant Units 3 and 4; Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that specified inspections, tests, and analyses have been
successfully completed, and that specified acceptance criteria are met
for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: Determinations of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 takes effect on the dates
indicated in the NRC staff's verification evaluation forms for the
inspections, tests, analyses, and acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available
[[Page 55184]]
information related to this document using any of the following
methods:
Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2008-0252. Address
questions about NRC docket IDs to Anne Frost; telephone: 301-287-9232;
email: [email protected]. For technical questions, contact the
individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3025; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee) has submitted ITAAC closure
notifications (ICNs) under Sec. 52.99(c)(1) of title 10 of the Code of
Federal Regulations (10 CFR), informing the NRC that the licensee has
successfully performed the required inspections, tests, and analyses,
and that the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.08d.v (36), 2.2.03.08c.iii (182), 2.2.03.08c.iv.02 (184),
2.3.03.02 (319), 2.3.05.03a.ii (344), 2.3.05.03c.i (349), 2.3.05.03d.i
(351), 2.3.07.07b.i (402), 2.3.10.02a (431), 3.3.00.06b (788),
2.2.05.07e (880), and 2.3.07.07b.vii (881).
VEGP Unit 4 ITAAC
2.2.03.08c.v.01 (187), 2.2.03.08d (200), 2.3.09.03.iii (425),
C.2.6.12.01 (671), C.2.6.12.02 (672), C.2.6.12.03 (673), C.2.6.12.04
(674), C.2.6.12.05 (675), and C.2.6.12.06 (676).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure Notifications
Since the last Federal Register notice of the NRC staff's
determinations of successful completion of inspections, tests, and
analyses for VEGP Units 3 and 4, the NRC staff has not made additional
determinations of the successful completion of inspections, tests, and
analyses based on licensee ITAAC post-closure notifications (IPCNs)
submitted under 10 CFR 52.99(c)(2).
III. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs and IPCNs.
Each ICN presents a narrative description of how the ITAAC was
completed. The NRC's ICN review process involves a determination on
whether, among other things: (1) Each ICN provides sufficient
information, including a summary of the methodology used to perform the
ITAAC, to demonstrate that the inspections, tests, and analyses have
been successfully completed; (2) each ICN provides sufficient
information to demonstrate that the acceptance criteria of the ITAAC
are met; and (3) any NRC inspections for the ITAAC have been completed
and any ITAAC findings associated with that ITAAC have been closed. The
NRC's review process for IPCNs is similar to that for ICNs but focuses
on how the licensee addressed the new material information giving rise
to the IPCN.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the NRC staff receives new information that
suggests the NRC staff's determination on any of these ITAAC is
incorrect, then the NRC staff will determine whether to reopen that
ITAAC (including withdrawing the NRC staff's determination on that
ITAAC). The NRC staff's determination will be used to support a
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria in the combined license are
met. The ITAAC closure process is not finalized for these ITAAC until
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future
updates to the status of these ITAAC will be reflected on the NRC's
website at https://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
This notice fulfills the NRC staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS accession number for each ICN
received, the ADAMS accession number for each VEF, and the ADAMS
accession numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's website at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS accession number for each ICN
and IPCN received, the ADAMS accession number for each VEF, and the
ADAMS accession numbers for the inspection reports associated with
these specific ITAAC, can be found on the NRC's website at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.
Dated at Rockville, Maryland, this 8th day of October, 2019.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Chief, Construction Inspection Program Branch, Division of Licensing,
Siting, and Environmental Analysis, Office of New Reactors.
[FR Doc. 2019-22383 Filed 10-11-19; 8:45 am]