Nuclear Regulatory Commission August 16, 2019 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of exemptions in response to a December 13, 2018, request from Pacific Gas and Electric Company (PG&E, the licensee) for Diablo Canyon Nuclear Power Plant (Diablo Canyon), Units 1 and 2. One exemption would allow the licensee to use an amount of funds from the Diablo Canyon Nuclear Decommissioning Trust (NDT) for decommissioning planning above the amount limitations specified in NRC's regulations. Another exemption would allow the licensee to use withdrawals from the NDT to fund planning activities associated with spent fuel management and site restoration. The NRC staff is issuing a final environmental assessment (EA) and final finding of no significant impact (FONSI) associated with the proposed exemptions.
Advanced Power Reactor 1400 (APR1400) Design Certification
The U.S. Nuclear Regulatory Commission (NRC) is confirming the effective date of September 19, 2019, for the direct final rule that was published in the Federal Register on May 22, 2019. This direct final rule amended NRC's regulations to certify the Advanced Power Reactor 1400 standard design so that applicants or licensees intending to construct and operate an Advanced Power Reactor 1400 standard design may do so by referencing the design certification rule.
Standard Review Plan for Spent Fuel Transportation
The U.S. Nuclear Regulatory Commission (NRC) requests public comment on draft NUREG-2216, Revision 0, ``Standard Review Plan for Spent Fuel Transportation''. This Standard Review Plan (SRP) provides guidance to NRC staff for reviewing an application for package approval. NRC approval of a package design typically results in issuance of a certificate of compliance (CoC) or a letter amendment for a transportation package. This draft SRP will replace NUREG-1609, ``Standard Review Plan for Transportation Packages for Radioactive Material'', NUREG-1617, ``Standard Review Plan for Transportation Packages for Spent Nuclear Fuel'', and all Interim Staff Guidance (ISGs) that were used to enhance these NUREGs.
Portland General Electric Company; Eugene Water and Electric Board, and PacifiCorp; Trojan Independent Spent Fuel Storage Installation
The U.S. Nuclear Regulatory Commission (NRC) has issued a renewed license to Portland General Electric (PGE), Eugene Water and Electric Board, and PacifiCorp (together ``licensee'') for Special Nuclear Materials (SNM) License No. SNM-2509 for the receipt, possession, transfer, and storage of spent fuel from the Trojan Nuclear Plant in the Trojan Independent Spent Fuel Storage Installation (ISFSI), located in Columbia County, Oregon. The renewed license authorizes operation of the Trojan ISFSI in accordance with the provisions of the renewed license and its technical specifications. The renewed license expires on March 31, 2059.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.