Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4, Equipment Survivability Assessment
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 139 and 138 to Combined Licenses (COLs), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (collectively SNC); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Virginia Electric and Power Company; Dominion Energy Virginia; Surry Power Station, Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) has received an application for the subsequent renewal of Renewed Facility Operating License Nos. DPR-32 and DPR-37, which authorize Virginia Electric and Power Company (Dominion Energy Virginia or the applicant) to operate Surry Power Station (SPS), Units 1 and 2. The renewed licenses would authorize the applicant to operate SPS for an additional 20 years beyond the period specified in each of the current renewed licenses. The current renewed operating licenses for SPS expire as follows: Unit 1 on May 25, 2032, and Unit 2 on January 29, 2033.
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Exemptions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a June 27, 2018, request from Southern Nuclear Operating Company, Inc., as applicable to Vogtle Electric Generating Plant (VEGP) Units 3 and 4. Specifically, SNC requested an exemption that would modify the requirement for the level 1 and level 2 PRA for VEGP Units 3 and 4 to cover those initiating events and modes for which Regulatory Guide 1.200, Revision 2, endorses standards.