Information Collection: NRC Form 7, Application for NRC Export/Import License, Amendment, Renewal or Consent Request(s)
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ``NRC Form 7, Application for NRC Export/Import License, Amendment, Renewal or Consent Request(s).''
FirstEnergy Nuclear Operating Company (FENOC) and FirstEnergy Nuclear Generation, LLC, Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit No. 1, Perry Nuclear Power Plant, Unit No. 1
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a July 19, 2017 request from FirstEnergy Nuclear Operating Company (FENOC) and FirstEnergy Nuclear Generation, LLC (collectively, the licensee), as supplemented by letters dated March 16, 2018, and May 2, 2018. The exemption is from the NRC definition for a physical barrier regarding the construction standards for the fence bracket angle. The exemption allows the licensee to apply a fence topper bracket angle of zero degrees (or vertical) at specific locations on the protected area fence at each facility, in lieu of the 30 to 45 degree fence bracket angle required by Commission regulations. All other construction standards contained in the Commission regulations for a physical barrier fence topper remain applicable.
Disposition of Information Related to the Time Period That Safety-Related Structures, Systems, or Components Are Installed
The U.S. Nuclear Regulatory Commission (NRC) is withdrawing draft regulatory issue summary, ``Disposition of Information Related to the Time Period that Safety-Related Structures, Systems or Components are Installed,'' which was published for public comment in the Federal Register on May 17, 2016. This document is being withdrawn because public interactions to date between NRC staff and industry have adequately communicated the issues identified by the staff to the industry. The NRC will continue to follow up on these issues via the reactor oversight process.
Guidance About Administrative Licensing Procedures
The U.S. Nuclear Regulatory Commission (NRC) is revising its guidance about administrative licensing procedures and agency policies for reviewing nuclear materials licensing requests. The NRC is requesting public comment on draft NUREG-1556, Volume 20, ``Consolidated Guidance About Materials Licenses: Guidance About Administrative Licensing Procedures.'' The document has been updated from the original version to include information on updated regulatory requirements, safety culture, security of radioactive materials, protection of sensitive information, and changes in regulatory policies and practices. This document is intended for use by the NRC staff when reviewing NRC materials licensing requests.