Nuclear Regulatory Commission April 25, 2018 – Federal Register Recent Federal Regulation Documents

Mitigation Strategies for Beyond-Design-Basis External Events
Document Number: 2018-08601
Type: Notice
Date: 2018-04-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing the final Revision 2 to Japan Lessons-Learned Division Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.'' This ISG provides guidance and clarification to assist nuclear power reactor licensees with the identification of measures needed to comply with requirements to mitigate challenges to key safety functions. These requirements are contained in Order EA-12-049, ``Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.''
Florida Power & Light Company; Turkey Point Units 6 and 7
Document Number: 2018-08594
Type: Notice
Date: 2018-04-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued Combined License (COL) Nos. NPF-104 and NPF-105 to Florida Power & Light Company (FPL) for Turkey Point Units 6 and 7. In addition, the NRC has prepared a Summary Record of Decision (ROD) that supports the NRC's decision to issue the above-named COLs.
Florida Power & Light Company; Turkey Point Units 6 and 7
Document Number: 2018-08593
Type: Notice
Date: 2018-04-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing a notice of intent to enter into a modified indemnity agreement with Florida Power & Light Company (FPL) to operate Turkey Point Units 6 and 7. The NRC is publishing notice of its intent to enter into an indemnity agreement which contains provisions different from the general form found in the NRC's regulations. A modification to the general form is necessary to accommodate the unique timing provisions of a combined license (COL).