Nuclear Regulatory Commission March 30, 2017 – Federal Register Recent Federal Regulation Documents

Sunshine Act Meeting Notice
Document Number: 2017-06374
Type: Notice
Date: 2017-03-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Planning and Procedures
Document Number: 2017-06315
Type: Notice
Date: 2017-03-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
NuScale Power, LLC
Document Number: 2017-06309
Type: Notice
Date: 2017-03-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has accepted for docketing an application for a design certification of a Small Modular Reactor (SMR) submitted by NuScale Power, LLC (NuScale).
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Station, Units 3 and 4; Annex and Radwaste Building Changes
Document Number: 2017-06308
Type: Notice
Date: 2017-03-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 73 and 72 to Combined Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information that is requested in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit No. 2
Document Number: 2017-06307
Type: Notice
Date: 2017-03-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Facility Operating License No. DPR-75, issued to PSEG Nuclear LLC (PSEG or the licensee) for operation of the Salem Nuclear Generating Station (Salem), Unit No. 2. The amendment would extend the Salem, Unit No. 2, implementation period for Amendment No. 294 from the spring 2017 refueling outage to prior to restart from the fall 2018 refueling outage. Amendment No. 294, which was issued by the NRC staff on April 28, 2016, revised the Salem, Unit No. 2, Technical Specifications in support of replacement of the source range and intermediate range neutron monitoring systems.
Non-Power Production or Utilization Facility License Renewal
Document Number: 2017-06162
Type: Proposed Rule
Date: 2017-03-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its regulations that govern the license renewal process for non- power reactors, testing facilities, and other production or utilization facilities, licensed under the authority of Section 103, Section 104a, or Section 104c of the Atomic Energy Act of 1954, as amended (AEA), that are not nuclear power reactors. In this proposed rule, the NRC collectively refers to these facilities as non-power production or utilization facilities (NPUFs). The NRC is proposing to: Eliminate license terms for licenses issued under the authority of Sections 104a or 104c of the AEA, other than for testing facilities; define the license renewal process for licenses issued to testing facilities or under the authority of Section 103 of the AEA; require all NPUF licensees to submit final safety analysis report (FSAR) updates to the NRC every 5 years; and provide an accident dose criterion of 1 rem (0.01 Sievert (Sv)) total effective dose equivalent (TEDE) for NPUFs other than testing facilities. The proposed rule also includes other changes, as described in Section III, ``Discussion,'' of this document. The NRC is issuing concurrently draft Regulatory Guide (DG-2006), ``Preparation of Updated Final Safety Analysis Reports for Non-power Production or Utilization Facilities,'' for review and comment. The NRC anticipates the proposed rule and associated draft implementing guidance would result in reduced burden on both licensees and the NRC, and would create a more responsive and efficient regulatory framework that will continue to protect public health and safety, promote the common defense and security, and protect the environment. During the public comment period, the NRC plans to hold a public meeting to promote a full understanding of the proposed rule and facilitate the public's ability to submit comments on the proposed rule.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.