Nuclear Regulatory Commission December 30, 2016 – Federal Register Recent Federal Regulation Documents
Results 1 - 5 of 5
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Tier 1 Editorial and Consistency Changes
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 56 to Combined Licenses (COL) NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Consolidation of Uninterruptible Power Supply System Spare Battery Terminal Boxes
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 54 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Update To Incorporate FOIA Improvement Act of 2016 Requirements
The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations to reflect changes to the Freedom of Information Act (FOIA). The FOIA Improvement Act of 2016 requires the NRC to amend its FOIA regulations to update procedures for requesting information from the NRC and procedures that the NRC must follow in responding to FOIA requests.
Increase in the Maximum Amount of Primary Nuclear Liability Insurance
The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations to increase the required amount \1\ of primary nuclear liability insurance from $375 million to $450 million for each nuclear reactor that is licensed to operate, is designed for the production of electrical energy, and has a rated capacity of 100,000 electrical kilowatts or more. This change conforms to the provision in the Price- Anderson Amendments Act of 1988 (Pub. L. 100-408) (Price-Anderson Act) that the amount of primary financial protection required of licensees by the NRC shall be the maximum amount available at reasonable cost and on reasonable terms from private sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.