Nuclear Regulatory Commission November 8, 2016 – Federal Register Recent Federal Regulation Documents

Purdue University; Purdue University Research Reactor
Document Number: 2016-26950
Type: Notice
Date: 2016-11-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) issued a renewal of Facility Operating License No. R-87, held by the Purdue University (the licensee) for the continued operation of its Purdue University Research Reactor (PUR-1 or the reactor) for an additional 20 years.
Duke Energy Florida, LLC; Levy Nuclear Plant Units 1 and 2
Document Number: 2016-26946
Type: Notice
Date: 2016-11-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued combined license numbers NPF-99 and NPF-100 to Duke Energy Florida, LLC (DEF) for Levy Nuclear Plant Units 1 and 2 (LNP Units 1 and 2). In addition, the NRC has prepared a Summary Record of Decision (ROD) that supports the NRC's decision to issue combined license numbers NPF-99 and NPF-100.
Statistical Terminology and Notation for Special Nuclear Materials Control and Accountability
Document Number: 2016-26911
Type: Notice
Date: 2016-11-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is withdrawing Regulatory Guide (RG) 5.3, ``Statistical Terminology and Notation for Special Nuclear Materials Control and Accountability,'' that was issued in 1973. This document is being withdrawn in part because regulatory guidance is not needed for common statistical terminology and notation information that is commonly used in the field of statistics. Further, RG 5.3 provided guidance on the term ``limits of error'' as defined in the NRC's regulations. This term is no longer a defined regulatory term and is no longer used by the NRC except in certain transaction reports. Also, RG 5.3 endorsed a 1972 American National Standards Institute (ANSI) standard that was later withdrawn. Therefore, the NRC finds that RG 5.3 is obsolete.
Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Document Number: 2016-26824
Type: Notice
Date: 2016-11-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued, from October 8, 2016, to October 24, 2016. The last biweekly notice was published on October 25, 2016.
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information
Document Number: 2016-26096
Type: Notice
Date: 2016-11-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of four amendment requests. The amendment requests are for Crystal River Unit 3 Nuclear Generating Plant; Diablo Canyon Nuclear Power Plant, Unit Nos. 1 and 2; Vogtle Electric Generating Plant, Units 3 and 4; and Browns Ferry Nuclear Plant, Units 1, 2, and 3. For each amendment request, the NRC proposes to determine that they involve no significant hazards consideration. Because each amendment request contains sensitive unclassified non-safeguards information (SUNSI) and/or safeguards information (SGI), an order imposes procedures to obtain access to SUNSI and SGI for contention preparation.