Nuclear Regulatory Commission March 2016 – Federal Register Recent Federal Regulation Documents

Duke Energy Progress; Combined License Application for Shearon Harris Nuclear Power Plants Units 2 and 3
Document Number: 2016-04852
Type: Notice
Date: 2016-03-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to an August 12, 2015, letter from Duke Energy Progress (DEP), which requested an exemption from certain regulatory requirements that requires DEP to submit an update to the Final Safety Analysis Report (FSAR) included in their combined license (COL) application by December 31, 2015. The NRC staff reviewed this request and determined that it is appropriate to grant the exemption, but stipulated that the update to the FSAR must be submitted prior to, or coincident with the resumption of the COL application review or by December 31, 2016, whichever comes first.
Duke Energy Progress; Combined License Applications for Shearon Harris Nuclear Plant Units 2 and 3
Document Number: 2016-04850
Type: Notice
Date: 2016-03-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to an August 12, 2015, letter from Duke Energy Progress (DEP). On May 2, 2013, DEP requested that the NRC suspend review of its combined license (COL) application until further notice. On August 12, 2015, DEP requested an exemption from certain regulatory requirements which, if granted, would allow them to revise their COL application in order to address enhancements to the Emergency Preparedness (EP) rules by December 31, 2016, rather than by December 31, 2013, as the regulations currently require. The NRC staff reviewed this request and determined that it is appropriate to grant the exemption to the EP update requirements until December 31, 2016, but stipulated that the updates to the Final Safety Analysis Report (FSAR) must be submitted prior to requesting the NRC resume its review of the COL application, or by December 31, 2016, whichever comes first.
Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 1, 2 and 3; Independent Spent Fuel Storage Installation
Document Number: 2016-04750
Type: Notice
Date: 2016-03-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption to Exelon Generation Company, LLC (hereafter, EGC or the applicant). EGC is the general licensee operating the Dresden Nuclear Power Station (DNPS) Independent Spent Fuel Storage Installation (ISFSI) located in Morris, Illinois. Specifically, EGC seeks authorization to load and store one DNPS Unit 1 thoria rod canister containing 18 DNPS Unit 1 thoria rods in a Holtec International, Inc., multi-purpose canister (MPC)-68M. Thoria rods are not approved for storage in the MPC-68M per Certificate of Compliance (CoC) No. 1014, Amendment 8, Rev. 1 \1\ Appendix B, ``Approved Contents and Design Features.'' EGC plans to load and store Holtec HI-STORM 100 spent fuel casks utilizing Amendment 8, Rev. 1 to CoC No. 1014 in the 2016 DNPS spent fuel loading campaign (SFLC).
Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Addition of Instruments to Design Reliability Assurance Program (D-RAP)
Document Number: 2016-04754
Type: Notice
Date: 2016-03-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 43 to Combined Licenses (COLs), NPF-91 and NPF- 92. The COLs were issued to Southern Nuclear Operating Company, Inc., (SNC), Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton, Georgia (together ``the licensee''); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information requested in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
In The Matter of Duke Energy Corporation, Crystal River Nuclear Generating Station, Independent Spent Fuel Storage Installation: Order Modifying License (Effective Immediately)
Document Number: 2016-04749
Type: Notice
Date: 2016-03-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued a general license to the Duke Energy Corporation (Duke), authorizing the operation of the Crystal River Nuclear Generating Plant Independent Spent Fuel Storage Installation (ISFSI), in accordance with its regulations. The Order is being issued to Duke to impose additional security requirements because Duke has identified near term plans to store spent fuel in an ISFSI under the general license provisions of the NRC's regulations. The Order was issued February 24, 2016, and became effective immediately.
Operator Licensing Examination Standards for Power Reactors
Document Number: 2016-04748
Type: Notice
Date: 2016-03-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On February 5, 2016, the U.S. Nuclear Regulatory Commission (NRC) solicited comments on draft NUREG, NUREG-1021, Revision 11, ``Operator Licensing Examination Standards for Power Reactors.'' The public comment period was originally scheduled to close on March 21, 2016. The NRC has decided to extend the public comment period to allow more time for members of the public to develop and submit their comments.
Vogtle Electric Generating Plant, Units 3 and 4
Document Number: 2016-04620
Type: Notice
Date: 2016-03-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Combined Licenses (NPF-91 and NPF-92), issued to Southern Nuclear Operating Company, Inc. (SNC), Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton, Georgia (together ``the licensees''), for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia.
Approval of American Society of Mechanical Engineers' Code Cases
Document Number: 2016-04355
Type: Proposed Rule
Date: 2016-03-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its regulations to incorporate by reference proposed revisions of three regulatory guides (RGs) which would approve new, revised, and reaffirmed Code Cases published by the American Society of Mechanical Engineers (ASME). This proposed action would allow nuclear power plant licensees, and applicants for construction permits, operating licenses, combined licenses, standard design certifications, standard design approvals and manufacturing licenses, to use the Code Cases listed in these draft RGs as alternatives to engineering standards for the construction, inservice inspection, and inservice testing of nuclear power plant components. These engineering standards are set forth in ASME Boiler and Pressure Vessel Codes and ASME Operations and Maintenance Codes, which are currently incorporated by reference into the NRC's regulations. The NRC is requesting comments on this proposed rule and on the draft versions of the three RGs proposed to be incorporated by reference. The NRC is also making available a related draft RG that lists Code Cases that the NRC has not approved for use. This draft RG will not be incorporated by reference into the NRC's regulations.
Clarification of Compensatory Measure Requirements for Physical Protection Program Deficiencies
Document Number: 2016-04347
Type: Notice
Date: 2016-03-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is seeking public comment on a draft regulatory issue summary (RIS) entitled, RIS 2016- XX, ``Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment, or Components.'' The NRC intends to issue this RIS to remind licensees of the requirement to implement compensatory measures, supported by a site-specific analysis, to ensure that licensees maintain, at all times, the capability to detect, assess, interdict, and neutralize threats as identified in NRC regulations. Compensatory measures must be implemented for degraded or inoperable security systems, equipment, or components, and for protective strategy deficiencies identified during performance evaluation exercises and drills.
Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Document Number: 2016-04346
Type: Notice
Date: 2016-03-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued from February 2, 2016, to February 12, 2016. The last biweekly notice was published on February 16, 2016.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.