Nuclear Regulatory Commission September 29, 2015 – Federal Register Recent Federal Regulation Documents

Duke Energy Carolinas, LLC; Oconee Nuclear Station Units 1, 2, and 3; Independent Spent Fuel Storage Installation
Document Number: 2015-24655
Type: Notice
Date: 2015-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a request submitted by Duke Energy Carolinas, LLC., on August 28, 2014, from meeting Technical Specification (TS) 1.2.4a of Attachment A of CoC No. 1004, which limits the leak rate of the inner seal weld to 1.0 X 10-7 reference cubic centimeters per second (ref cc/s) at the highest DSC limiting pressure, for five (5) dry shielded canisters (DSCs) at the Oconee Nuclear Station, Independent Spent Fuel Storage Installation (ISFSI).
Design of Structures, Components, Equipment, and Systems
Document Number: 2015-24654
Type: Notice
Date: 2015-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on the following sections in Chapter 3, ``Design of Structures, Components, Equipment, and Systems Reactor Coolant System and Connected Systems'' of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 3.9.2, ``Dynamic Testing and Analysis of Systems, Structures, and Components,'' Section 3.9.4, ``Control Rod Drive Systems,'' Section 3.9.5, ``Reactor Pressure Vessel Internals,'' and Section 3.9.6, ``Functional Design, Qualification, and Inservice Testing Programs for Pumps, Valves, and Dynamic Restraints.''
Perry Nuclear Power Plant, Unit 1; Consideration of Approval of Transfer of License and Conforming Amendment; Correction
Document Number: 2015-24646
Type: Notice
Date: 2015-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is correcting a notice that was published in the Federal Register (FR) on September 16, 2015, regarding FirstEnergy Nuclear Operating Company's June 30, 2015, application for a direct transfer of the leased interests in NPF-58 for Perry Nuclear Power Plant, Unit 1, from the current holder, the Ohio Edison Company, to FirstEnergy Nuclear Generation, LLC. This action is necessary to correct the number of days for the deadline for submitting a petition for intervention identified in Attachment 1, ``General Target Schedule for Processing and Resolving Requests for Access to Sensitive Unclassified Non-Safeguards Information in this Proceeding,'' of the September 16, 2015, notice.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Document Number: 2015-24472
Type: Notice
Date: 2015-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued from September 1 to September 14, 2015. The last biweekly notice was published on September 15, 2015.