Nuclear Regulatory Commission March 19, 2015 – Federal Register Recent Federal Regulation Documents

List of Approved Spent Fuel Storage Casks: Holtec HI-STORM Flood/Wind System; Certificate of Compliance No. 1032, Amendment No. 1, Revision 1
Document Number: 2015-06367
Type: Rule
Date: 2015-03-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is amending its spent fuel storage regulations by revising the Holtec International, Inc. (Holtec), HI-STORM Flood/Wind (FW) System listing within the ``List of approved spent fuel storage casks'' to add Amendment No. 1, Revision 1, to Certificate of Compliance (CoC) No. 1032. Amendment No. 1, Revision 1, allows these casks to accept 14X14B fuel assemblies with minor changes in the internal diameter of the fuel cladding, diameter of the fuel pellet, and spacing between the fuel pins. The amendment also updates testing requirements for the fabrication of Metamic HT neutron-absorbing structural material.
List of Approved Spent Fuel Storage Casks: Holtec HI-STORM Flood/Wind System; Certificate of Compliance No. 1032, Amendment No. 1, Revision 1
Document Number: 2015-06366
Type: Proposed Rule
Date: 2015-03-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its spent fuel storage regulations by revising the Holtec International, Inc. (Holtec), HI-STORM Flood/Wind (FW) System listing within the ``List of approved spent fuel storage casks'' to add Amendment No. 1, Revision 1, to Certificate of Compliance (CoC) No. 1032. Amendment No. 1, Revision 1, allows these casks to accept 14X14B fuel assemblies with minor changes in the internal diameter of the fuel cladding, diameter of the fuel pellet, and spacing between the fuel pins. The amendment also updates testing requirements for the fabrication of Metamic HT neutron-absorbing structural material.
URENCO USA, Uranium Enrichment Facility
Document Number: 2015-06334
Type: Notice
Date: 2015-03-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering approval of the URENCO USA (UUSA) license amendment request 12-10 (LAR- 12-10) that would authorize capacity expansion of the UUSA enrichment facility near Eunice, New Mexico. In addition the NRC is considering approval of related UUSA license amendment requests that would authorize increases in the mass possession limits for natural, depleted, and enriched uranium; and would authorize use of a modified enrichment process to utilize depleted uranium as the feed material.
Advisory Committee on Reactor Safeguards; Notice of Meeting
Document Number: 2015-06333
Type: Notice
Date: 2015-03-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.