Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station
Document Number: 2015-05679
Type: Notice
Date: 2015-03-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License No. DPR- 35, issued to Entergy Nuclear Operations, Inc., for operation of the Pilgrim Nuclear Power Station. The proposed amendment would modify the Safety Limit Minimum Critical Power Ratio from >= 1.08 to >= 1.10 for two recirculation loop operation and from >= 1.11 to >= 1.12 for single loop operation.
SHINE Medical Technologies, Inc.; Notice of Hearing, Opportunity To Intervene, Order Imposing Procedures
Document Number: 2015-05672
Type: Notice
Date: 2015-03-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has received a construction permit application from SHINE Medical Technologies, Inc. (SHINE), for approval of a proposed medical radioisotope production facility for the production of molybdenum-99 (Mo-99) at a site located in Janesville, Wisconsin. The NRC is currently conducting a detailed technical review of the construction permit application. If the construction permit application is approved, the applicant would be authorized to construct its proposed medical radioisotope production facility in accordance with the provisions of the construction permit.
Meeting of the Advisory Committee on Reactor Safeguards Subcommittee on Power Uprates
Document Number: 2015-05658
Type: Notice
Date: 2015-03-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Korea Hydro and Nuclear Power Co., Ltd., and Korea Electric Power Corporation
Document Number: 2015-05579
Type: Notice
Date: 2015-03-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has determined that Korea Hydro and Nuclear Power Co., Ltd. (KHNP) and Korea Electric Power Corporation (KEPCO) have submitted information for a standard design certification of the APR1400 Standard Plant Design that is acceptable for docketing. The docket number established is 52-046.
Department of Energy; Yucca Mountain, Nye County, Nevada
Document Number: 2015-05578
Type: Notice
Date: 2015-03-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is informing the public of its intent to prepare a supplement to the U.S. Department of Energy's (DOE's) ``Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada'' (February 2002), and its ``Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High- Level Radioactive Waste at Yucca Mountain, Nye County, Nevada'' (July 2008). The NRC staff determined in September 2008 that it is practicable to adopt, with further supplementation, the DOE's environmental impact statements (EISs). The NRC staff concluded that the EISs did not address adequately all of the repository-related impacts on groundwater or from surface discharges of groundwater.