Nuclear Regulatory Commission November 29, 2013 – Federal Register Recent Federal Regulation Documents

NUREG-1482, Revision 2, “Guidelines for Inservice Testing at Nuclear Power Plants, Final Report”
Document Number: 2013-28701
Type: Notice
Date: 2013-11-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued a final report entitled: NUREG-1482, Revision 2, ``Guidelines for Inservice Testing at Nuclear Power Plants,'' and subtitled ``Inservice Testing of Pumps and Valves, and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants.'' In the previous Revisions 0 and 1 of NUREG-1482, the NRC staff provides licensees guidelines and recommendations for developing and implementing programs for the inservice testing of pumps and valves at commercial nuclear power plants. In Revision 2 of NUREG-1482, the NRC staff also includes guidelines and recommendations for developing and implementing programs for the inservice examination and testing of dynamic restraints (snubbers).
License Amendment Application for Vermont Yankee Nuclear Power Station
Document Number: 2013-28700
Type: Notice
Date: 2013-11-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Entergy Nuclear Operations, Inc. (the licensee) to withdraw its application dated May 14, 2013, (ADAMS Accession No. ML13137A158), for a proposed amendment to Facility Operating License No. DPR-28 for the Vermont Yankee Nuclear Power Station, located in Windham County, VT. The proposed amendment would have revised the Technical Specifications (TSs) to reduce reactor pressure associated with the fuel cladding integrity safety limits (SLs).
Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence
Document Number: 2013-28699
Type: Notice
Date: 2013-11-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Amendments to Material Control and Accounting Regulations and Proposed Guidance for Fuel Cycle Facility Material Control and Accounting Plans and Completing the U.S. Nuclear Regulatory Commission Form 327
Document Number: 2013-28698
Type: Proposed Rule
Date: 2013-11-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) plans to hold a public meeting on its proposed rule to amend its regulations for material control and accounting (MC&A) of special nuclear material (SNM) and the proposed guidance documents that discuss acceptable methods that licensees may use to prepare and implement their MC&A plans and how the NRC will review and inspect these plans.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: 2013-28603
Type: Notice
Date: 2013-11-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register notice with a 60-day comment period on this information collection on August 8, 2013 (78 FR 48501). 1. Type of submission, new, revision, or extension: New. 2. The title of the information collection: Suspicious Activity Reporting using the Protected Web Server (PWS). 3. Current OMB approval number: 3150-XXXX. 4. The form number if applicable: Not applicable. 5. How often the collection is required: On occasion. Reporting is done on a voluntary basis, as suspicious incidents occur. 6. Who will be required or asked to report: Nuclear power reactor licensees provide the majority of reports, but other entities that may voluntarily send reports include fuel facilities, independent spent fuel storage installations, decommissioned power reactors, power reactors under construction, research and test reactors, agreement states, non-agreement states, as well as users of byproduct material (e.g. departments of health, medical centers, steel mills, well loggers, and radiographers.) 7. An estimate of the number of annual responses: 339. 8. The estimated number of annual respondents: 50. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 678 hours. 10. Abstract: The NRC licensees voluntarily report information on suspicious incidents on an ad-hoc basis, as these incidents occur. This information is shared with authorized nuclear industry officials and Federal, State, and local government agencies using PWS. Information provided by licensees is considered OFFICIAL USE ONLY and is not made public. The public may examine and have copied for fee publicly available documents, including the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC's home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by December 30, 2013. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Chad Whiteman, Desk Officer, Office of Information and Regulatory Affairs (3150-XXXX), NEOB-10202, Office of Management and Budget, Washington, DC 20503.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: 2013-28602
Type: Notice
Date: 2013-11-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register notice with a 60-day comment period on this information collection on August 14, 2013 (78 FR 49551). 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: 10 CFR Part 21, ``Reporting of Defects and Noncompliance.'' 3. Current OMB approval number: 3150-0035. 4. The form number if applicable: Not applicable. 5. How often the collection is required: On occasion. Defects and noncompliance are reportable as they occur. 6. Who will be required or asked to report: Individual directors and responsible officers of firms constructing, owning, operating, or supplying the basic components of any facility or activity licensed under the Atomic Energy Act of 1954, as amended, or the Energy Reorganization Act of 1974, as amended, to report immediately to the NRC the discovery of defects in basic components or failures to comply that could create a substantial safety hazard. 7. An estimate of the number of annual responses: 447 (96 reporting responses + 1 third party disclosure response + 350 recordkeepers). 8. The estimated number of annual respondents: 350. 9. An estimate of the total number of hours needed annually to complete the requirement or request: 34,705 hours (9,420 hours reporting + 25,190 hours recordkeeping + 95 hours third-party disclosure). 10. Abstract: Part 21 of Title 10 of the Code of Federal Regulations, requires each individual, corporation, partnership, commercial grade dedicating entity, or other entity subject to the regulations in this part to adopt appropriate procedures to evaluate deviations and failures to comply to determine whether a defect exists that could result in a substantial safety hazard. Depending upon the outcome of the evaluation, a report of the defect must be submitted to the NRC. Reports submitted under 10 CFR Part 21 are reviewed by the NRC staff to determine whether the reported defects or failures to comply in basic components at the NRC licensed facilities or activities are potentially generic safety problems. These reports have been the basis for the issuance of numerous NRC Generic Communications that have contributed to the improved safety of the nuclear industry. The records required to be maintained in accordance with 10 CFR Part 21 are subject to inspection by the NRC to determine compliance with the subject regulation. The public may examine and have copied for a fee publicly-available documents, including the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC's home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by December 30, 2013. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2013-28601
Type: Notice
Date: 2013-11-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: 10 CFR Part 4 ``Nondiscrimination in Federally Assisted Commission Programs.'' 2. Current OMB approval number: 3150-0053. 3. How often the collection is required: Provisions for this collection are covered in Section 4.331 of Title 10 of the Code of Federal Regulations (10 CFR) Compliance Reviews, which indicates that the NRC may conduct compliance reviews and Pre-Award reviews of recipients or use other similar procedures that will permit it to investigate and correct violations of the act and these regulations. The NRC may conduct these reviews even in absence of a complaint against a recipient. The reviews may be as comprehensive as necessary to determine whether a violation of these regulations has occurred. 4. Who is required or asked to report: Recipients of Federal Financial Assistance provided by the NRC (including Educational Institutions, Other Nonprofit Organizations receiving Federal Assistance, and Agreement States. 5. The number of annual respondents: 200. 6. The number of hours needed annually to complete the requirement or request: 3,600 hours (3,000 hrs for reporting (5 hrs per respondent) and 600 hrs for recordkeeping (3 hrs per recordkeeper)). 7. Abstract: The regulations under 10 CFR Part 4 implement the provisions of Title VI of the Civil Rights Act of 1964, Public Law 88- 352; (78 Stat. 241; 42 U.S.C. 2000a note), Title IV of the Energy Reorganization Act of 1974, Public Law 93-438, (88 stat. 1233; 42 U.S.C. 5801 note), which relate to nondiscrimination with respect to race, color, national origin or sex in any program or activity receiving Federal financial assistance from NRC; Section 504 of the Rehabilitation Act of 1973, as amended, Public Law 93-112 (87 Stat. 355; 29 U.S.C. 701 note), Public Law 95-602 (92 Stat. 2955; 29 U.S.C. 701 note) which relates to nondiscrimination with respect to disability in any program or activity receiving Federal financial assistance; and the Age Discrimination Act of 1975, as amended, Public Law 94-135 (89 Stat. 713; 42 U.S.C. 3001 note), Public Law 95-478 (92 Stat. 1513; 42 U.S.C. 3001 note), which relates to nondiscrimination on the basis of age in any program or activity receiving Federal financial assistance. Submit, by January 28, 2014, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for fee publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC's home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2013-0258. You may submit your comments by any of the following methods: Electronic comments: Go to https:// www.regulations.gov and search for Docket No. NRC-2013-0258. Mail comments to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415- 6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.