Nuclear Regulatory Commission June 12, 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Initial Test Programs for Water-Cooled Nuclear Power Plants
The U.S. Nuclear Regulatory Commission (NRC) is issuing a revision to Regulatory Guide (RG), 1.68, ``Initial Test Programs for Water-Cooled Nuclear Power Plants.'' This guide describes the general scope and depth that the staff of the NRC considers acceptable for Initial Test Programs (ITPs) for light water cooled nuclear power plants.
Agency Information Collection Activities: Proposed Collection; Comment Request
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: 10 CFR Part 11, Criteria and Procedures for Determining Eligibility for Access to or Control Over Special Nuclear Material. 2. Current OMB approval number: 3150-0062. 3. How often the collection is required: On occasion. 4. Who is required or asked to report: Employees (including applicants for employment), contractors, and consultants of NRC licensees and contractors whose activities involve access to, or control over, special nuclear material at either fixed sites or for transportation activities. 5. The number of annual respondents: 2. 6. The number of hours needed annually to complete the requirement or request: 82. 7. Abstract: The NRC regulations in Part 11 of Title 10 of the Code of Federal Regulations (10 CFR), establish requirements for access to special nuclear material, and the criteria and procedures for resolving questions concerning the eligibility of individuals to receive special nuclear material access authorization. Submit, by August 12, 2013, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2013-0112. You may submit your comments by any of the following methods: Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2013-0112. Mail comments to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.