Nuclear Regulatory Commission December 30, 2011 – Federal Register Recent Federal Regulation Documents

General Site Suitability Criteria for Nuclear Power Stations
Document Number: 2011-33577
Type: Proposed Rule
Date: 2011-12-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide DG-4021, ``General Site Suitability Criteria for Nuclear Power Stations.'' This guide describes a method that the NRC staff considers acceptable to implement the site suitability requirements for nuclear power stations.
Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units
Document Number: 2011-33545
Type: Notice
Date: 2011-12-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1274, ``Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Postaccident Engineered-Safety-Feature Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants.'' This guide applies to the design, inspection, and testing of air filtration and iodine adsorption units of engineered-safety-feature (ESF) atmosphere cleanup systems in light-water-cooled nuclear power plants.
AP1000 Design Certification Amendment
Document Number: 2011-33266
Type: Rule
Date: 2011-12-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or Commission) is amending its regulations to certify an amendment to the AP1000 standard plant design. The amendment replaces the combined license (COL) information items and design acceptance criteria (DAC) with specific design information, addresses the effects of the impact of a large commercial aircraft, incorporates design improvements, and increases standardization of the design. This action is necessary so that applicants or licensees intending to construct and operate an AP1000 design may do so by referencing this regulation (AP1000 design certification rule (DCR)), and need not demonstrate in their applications the safety of the certified design as amended. The applicant for this amendment to the AP1000 design is Westinghouse Electric Company, LLC (Westinghouse).