Nuclear Regulatory Commission May 6, 2011 – Federal Register Recent Federal Regulation Documents

Nextera Energy Seabrook, LLC; Notice of Withdrawal of Application for Amendment to Facility Operating License
Document Number: 2011-11114
Type: Notice
Date: 2011-05-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Petition for Rulemaking Submitted by Thomas Popik
Document Number: 2011-11112
Type: Proposed Rule
Date: 2011-05-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is publishing for public comment a notice of receipt for a petition for rulemaking (PRM), dated March 14, 2011, which was filed with the NRC by Thomas Popik. The petition was docketed by the NRC on March 15, 2011, and has been assigned Docket No. PRM-50-96. The petition requests that the NRC amend its regulations regarding the domestic licensing of special nuclear material to require production and utilization facilities licensed by the NRC to assure long-term cooling and unattended water makeup of spent fuel pools.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2011-11110
Type: Notice
Date: 2011-05-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Notice of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (GDP) (NRC Enforcement Policy). 2. Current OMB approval number: 3150-0136. 3. How often the collection is required: On occasion. 4. Who is required or asked to report: Nuclear power reactor licensees and gaseous diffusion plant certificate holders. 5. The number of annual respondents: Approximately 11. 6. The number of hours needed annually to complete the requirement or request: 1,705. 7. Abstract: The NRC's Enforcement Policy addresses circumstances in which the NRC may exercise enforcement discretion. A specific type of enforcement discretion is designated as a NOED and relates to circumstances which may arise where a nuclear power plant licensee's compliance with a Technical Specification Limiting Condition for Operation or other license conditions would involve: (1) An unnecessary plant shutdown; (2) performance of testing, inspection, or system realignment that is inappropriate for the specific plant conditions; or (3) unnecessary delays in plant startup without a corresponding health and safety benefit. Similarly, for a gaseous diffusion plant, circumstances may arise where compliance with a Technical Safety Requirement or other condition would unnecessarily require a total plant shutdown, or, compliance would unnecessarily place the plant in a condition where safety, safeguards, or security features were degraded or inoperable. A licensee or certificate holder seeking the issuance of a NOED, must document the safety basis for the request, including: An evaluation of the safety significance and potential consequences of the proposed request, a description of proposed compensatory measures, a justification for the duration of the request, the basis for the licensee's or certificate holder's conclusion that the request does not have a potential adverse impact on the public health and safety, that there will be no adverse consequences to the environment, and any other information the NRC staff deems necessary before the NRC staff makes a decision whether to exercise discretion. In addition, the NRC's Enforcement Policy includes a provision allowing licensees to voluntarily adopt fire protection requirements contained in the National Fire Protection Association Standard 805, ``Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition'' (NFPA 805). Licensees who wish to implement the risk-informed process in NFPA 805 must submit a letter of intent (LOI) to the NRC. Licensees who wish to withdraw from the NFPA 805 risk-informed process must submit a letter of retraction. Submit, by July 5, 2011, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied, for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC Web site: https://www.nrc.gov/public-involve/ doc-omment/omb/. The document will be available on the NRC Web site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2011-0053. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2011-0053. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2011-11109
Type: Notice
Date: 2011-05-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 536, ``Operator Licensing Examination Data.'' 2. Current OMB approval number: 3150-0131. 3. How often the collection is required: Annually. 4. Who is required or asked to report: All holders of operating licenses for nuclear power reactors under the provision of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, ``Domestic Licensing of Production and Utilization Facilities,'' except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel, and all holders of or applicants for a limited work authorization, early site permits, or combined license issued under 10 CFR Part 52, ``Licenses, Certifications and Approval for Nuclear Power Plants.'' 5. The number of annual respondents: 110. 6. The number of hours needed annually to complete the requirement or request: 110. 7. Abstract: The NRC is requesting renewal of its clearance to annually request all commercial power reactor licensees and applicants for an operating license to voluntarily send to the NRC: (1) Their projected number of candidates for initial operator licensing examinations; (2) the estimated dates of the examinations; (3) if the examinations will be facility developed or NRC developed; and (4) the estimated number of individuals that will participate in the Generic Fundamentals Examination (GFE) for that calendar year. Except for the GFE, this information is used to plan budgets and resources in regard to operator examination scheduling in order to meet the needs of the nuclear power industry. Submit, by July 5, 2011, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied, for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC Web site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2011-0092. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2011-0092. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-6258, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Draft Regulatory Guide: Reissuance and Availability
Document Number: 2011-11108
Type: Notice
Date: 2011-05-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On November 2, 2009 (74 FR 56672), the U.S. Nuclear Regulatory Commission (NRC) published a notice of issuance and availability of Draft Regulatory Guide (DG)1217, ``Protection Against Turbine Missiles.'' The guide is being reissued to allow further public review and comment following additional changes to the document.
Entergy Operations, Inc.; Biweekly Notice; Notice of Issuance of Amendment to Facility Operating License; Correction
Document Number: 2011-11107
Type: Notice
Date: 2011-05-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This document corrects a notice appearing in the Federal Register on April 5, 2011 (76 FR 18806) that incorrectly excluded the date of a supplement to the amendment request. This action is necessary to correct a missing date on the notice of issuance of amendment.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2011-11011
Type: Notice
Date: 2011-05-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Notice of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (GDP) (NRC Enforcement Policy). 2. Current OMB approval number: 3150-0136. 3. How often the collection is required: On occasion. 4. Who is required or asked to report: Nuclear power reactor licensees and gaseous diffusion plant certificate holders. 5. The number of annual respondents: Approximately 11. 6. The number of hours needed annually to complete the requirement or request: 1,705. 7. Abstract: The NRC's Enforcement Policy addresses circumstances in which the NRC may exercise enforcement discretion. A specific type of enforcement discretion is designated as a NOED and relates to circumstances which may arise where a nuclear power plant licensee's compliance with a Technical Specification Limiting Condition for Operation or other license conditions would involve: (1) An unnecessary plant shutdown; (2) performance of testing, inspection, or system realignment that is inappropriate for the specific plant conditions; or (3) unnecessary delays in plant startup without a corresponding health and safety benefit. Similarly, for a gaseous diffusion plant, circumstances may arise where compliance with a Technical Safety Requirement or other condition would unnecessarily require a total plant shutdown, or, compliance would unnecessarily place the plant in a condition where safety, safeguards, or security features were degraded or inoperable. A licensee or certificate holder seeking the issuance of a NOED, must document the safety basis for the request, including: An evaluation of the safety significance and potential consequences of the proposed request, a description of proposed compensatory measures, a justification for the duration of the request, the basis for the licensee's or certificate holder's conclusion that the request does not have a potential adverse impact on the public health and safety, that there will be no adverse consequences to the environment, and any other information the NRC staff deems necessary before the NRC staff makes a decision whether to exercise discretion. In addition, the NRC's Enforcement Policy includes a provision allowing licensees to voluntarily adopt fire protection requirements contained in the National Fire Protection Association Standard 805, ``Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition'' (NFPA 805). Licensees who wish to implement the risk-informed process in NFPA 805 must submit a letter of intent (LOI) to the NRC. Licensees who wish to withdraw from the NFPA 805 risk-informed process must submit a letter of retraction. Submit, by July 5, 2011, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied, for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC Web site: https://www.nrc.gov/public-involve/ doc-omment/omb/. The document will be available on the NRC Web site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2011-0053. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2011-0053. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-6258, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2011-11010
Type: Notice
Date: 2011-05-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 536, ``Operator Licensing Examination Data.'' 2. Current OMB approval number: 3150-0131. 3. How often the collection is required: Annually. 4. Who is required or asked to report: All holders of operating licenses for nuclear power reactors under the provision of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, ``Domestic Licensing of Production and Utilization Facilities,'' except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel, and all holders of or applicants for a limited work authorization, early site permits, or combined license issued under 10 CFR Part 52, ``Licenses, Certifications and Approval for Nuclear Power Plants.'' 5. The number of annual respondents: 110. 6. The number of hours needed annually to complete the requirement or request: 110. 7. Abstract: The NRC is requesting renewal of its clearance to annually request all commercial power reactor licensees and applicants for an operating license to voluntarily send to the NRC: (1) Their projected number of candidates for initial operator licensing examinations; (2) the estimated dates of the examinations; (3) if the examinations will be facility developed or NRC developed; and (4) the estimated number of individuals that will participate in the Generic Fundamentals Examination (GFE) for that calendar year. Except for the GFE, this information is used to plan budgets and resources in regard to operator examination scheduling in order to meet the needs of the nuclear power industry. Submit, by July 5, 2011, comments that address the following questions 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied, for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC Web site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2011-0092. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2011-0092. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-6258, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.