Nuclear Regulatory Commission March 24, 2011 – Federal Register Recent Federal Regulation Documents

Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2011-6964
Type: Notice
Date: 2011-03-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Design Information QuestionnaireIAEAN71 and associated Forms N-72, N-73, N-74, N-75, N-91, N-92, N-93, N-94. 2. Current OMB approval number: 3150-0056. 3. How often the collection is required: Annually. 4. Who is required or asked to report: Licensees of facilities on the U.S. eligible list who have been notified in writing by the NRC to submit the form. 5. The number of annual respondents: 1.3. 6. The number of hours needed annually to complete the requirement or request: 300 reporting hours. 7. Abstract: In order for the United States to fulfill its responsibilities as a participant in the U.S./International Atomic Energy Agency (IAEA) Safeguards Agreement, the NRC must collect information from licensees about their installations and provide it to the IAEA. Licensees of facilities that appear on the U.S. eligible list and have been notified in writing by the NRC are required to complete and submit a Design Information Questionnaire, IAEA Form N-71 (and the appropriate associated IAEA Form) or Form N-91, to provide information concerning their installation for use of the IAEA. Submit, by May 23, 2011, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied, for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. OMB clearance requests are available at the NRC worldwide Web site: https://www.nrc.gov/public- involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2011-0035. You may submit your comments by any of the following methods. Electronic comments: Go to https:// www.regulations.gov and search for Docket No. NRC-2011-0360. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6258, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Southern Nuclear Operating Company; Notice of Availability of Application for a Combined License
Document Number: 2011-6844
Type: Notice
Date: 2011-03-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
ESBWR Design Certification
Document Number: 2011-6839
Type: Proposed Rule
Date: 2011-03-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or Commission) proposes to amend its regulations to certify the Economic Simplified Boiling-Water Reactor (ESBWR) standard plant design. This action is necessary so that applicants or licensees intending to construct and operate an ESBWR design may do so by referencing this design certification rule (DCR). The applicant for certification of the ESBWR design is GE-Hitachi Nuclear Energy (GEH). The public is invited to submit comments on this proposed DCR, the generic design control document (DCD) that would be incorporated by reference into the DCR, and the environmental assessment (EA) for the ESBWR design.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.