Nuclear Regulatory Commission October 19, 2009 – Federal Register Recent Federal Regulation Documents

Industry Codes and Standards; Amended Requirements; Confirmation of Effective Date
Document Number: E9-25049
Type: Rule
Date: 2009-10-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) is confirming the effective date of October 19, 2009, for the direct final rule that was published in the Federal Register on August 5, 2009. This direct final rule amended the NRC's regulations on governing vessel head inspection requirements. This amendment revised the upper range of the percentage of axial flaws permitted in a specimen set used for the qualification of nondestructive examination systems (procedures, personnel and equipment), which are used in the performance of inservice inspection (ISI) of pressurized water reactor (PWR) upper vessel head penetrations. This amendment was made as a result of the withdrawal of a stakeholder's recommendation necessitated by a typographical error in the original recommendation with respect to the maximum percentage of flaws that should be oriented axially.
Westinghouse Electric Company, LLC; Establishment of Atomic Safety and Licensing Board
Document Number: E9-25041
Type: Notice
Date: 2009-10-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.