Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: E9-2618
Type: Notice
Date: 2009-02-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Application for NRC Export/Import License, Amendment, or Renewal. 2. Current OMB approval number: 3150-0027. 3. How often the collection is required: On occasion; for each separate export, import, amendment, or renewal license application, and for exports of incidental radioactive material using existing general licenses. 4. Who is required or asked to report: Any person in the U.S. who wishes to export or import (a) nuclear material and equipment or byproduct material subject to the requirements of a specific license; (b) amend a license; (c) renew a license, and (d) for notification of incidental radioactive material exports that are contaminants of shipments of more than 100 kilograms of non-waste material using existing NRC general licenses. 5. The number of annual respondents: 170. 6. The number of hours needed annually to complete the requirement or request: 484. 7. Abstract: Persons in the U.S. wishing to export or import nuclear material or equipment, or byproduct material requiring a specific authorization, amend or renew a license, or wishing to use existing NRC general licenses for the export of incidental radioactive material over 100 kilograms must file an NRC Form 7 application. The NRC Form 7 application will be reviewed by the NRC and by the Executive Branch, and if applicable statutory, regulatory, and policy considerations are satisfied, the NRC will issue an export, import, amendment or renewal license. Submit, by April 10, 2009, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2008-0563. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2008-0563. Mail comments to NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6445, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Final Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the State of Texas
Document Number: E9-2617
Type: Notice
Date: 2009-02-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: E9-2616
Type: Notice
Date: 2009-02-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Billing Instructions for NRC Cost Type Contracts. 2. Current OMB approval number: 3150-0109. 3. How often the collection is required: Monthly and on occasion. 4. Who is required or asked to report: NRC Contractors. 5. The number of annual respondents: 64. 6. The number of hours needed annually to complete the requirement or request: 1,202 hours. 7. Abstract: In administering its contracts, the NRC Division of Contracts provides billing instructions for its contractors to follow in preparing invoices. These instructions stipulate the level of detail in which supporting data must be submitted for NRC review. The review of this information ensures that all payments made by NRC for valid and reasonable costs are in accordance with the contract terms and conditions. Submit, by April 10, 2009, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2008-0040. You may submit your comments by any of the following methods. Electronic comments: Go to https://www.regulations.gov and search for Docket No. NRC-2008-0040. Mail comments to NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Gregory Trussell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301- 415-6874, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV.
Exelon Generation Company, LLC, and PSEG Nuclear, LLC; Environmental Assessment and Finding of No Significant Impact; Correction NRC-2009-0033
Document Number: E9-2546
Type: Notice
Date: 2009-02-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This document corrects a notice appearing in the Federal Register on January 29, 2009 (74 FR 5191), that notified the public of the Environmental Assessment and Finding of No Significant Impact for issuance of an Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix R, Section III.G, ``Fire Protection of Safe Shutdown Capability,'' for the use of operator manual actions in lieu of the requirements specified in Section III.G.2 as requested by Exelon Generation Company, LLC for operation of Peach Bottom Atomic Power Station, Units 2 and 3 located in York and Lancaster Counties, Pennsylvania. This action is necessary to correct the Licensee's name as stated in the subject heading of the original notice.
Proposed Standard Review Plan Section 9.5.1.2 on Risk-Informed, Performance-Based Fire Protection Program
Document Number: E9-2456
Type: Notice
Date: 2009-02-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is requesting public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 9.5.1.2 on staff guidance on Risk-Informed (RI), Performance-Based (PB) Fire Protection Program (FPP) for Operating Nuclear Power Plants (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090050052). This guidance is being issued as an alternate to the existing guidance currently provided under Standard Review Plan (SRP) section 9.5.1. This is stand alone guidance and is provided for the benefit of licensees of existing plants who choose to adopt RI/PB FPP that meets the requirements of National Fire Protection Association (NFPA) Standard 805. The NRC staff issues notices to facilitate timely implementation of the current staff guidance and to facilitate activities associated with the review of amendment applications for transitioning to RI/PB FPPs. The NRC staff will also incorporate the approved SRP section 9.5.1.2 into the next revisions of RG 1.205 and any related guidance documents. This proposed guidance is applicable only to currently operating nuclear reactor licensees. Because of the introduction of the now proposed SRP section 9.5.1.2, the current SRP section 9.5.1 will be renumbered to read 9.5.1.1. This SRP is not endorsing NFPA 805, since that standard is already a part of the 10 CFR 50.48(c) rule. In addition, this SRP does not directly endorse the guidance document issued by the industry (NEI 04-02, ``Guidance for Implementing a Risk- Informed, Performance-Based Fire Protection Program under 10 CFR 50.48(c),'' Rev. 2) for plants transitioning to an NFPA 805 FPP. RG 1.205 provides the staff's positions with respect to NEI 04-02.
List of Approved Spent Fuel Storage Casks: MAGNASTOR Addition, Confirmation of Effective Date
Document Number: E9-2370
Type: Rule
Date: 2009-02-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) is confirming the effective date of February 4, 2009, for the direct final rule that was published in the Federal Register on November 21, 2008. This direct final rule amended the NRC's regulations to add the NAC International Inc. MAGNASTOR cask system to the list of approved spent fuel storage casks in 10 CFR 72.214.
Sunshine Federal Register Notice
Document Number: E9-2320
Type: Notice
Date: 2009-02-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice of Meeting
Document Number: E9-2221
Type: Notice
Date: 2009-02-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on US-APWR; Notice of Meeting
Document Number: E9-2180
Type: Notice
Date: 2009-02-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notification of Impending Waiver Termination
Document Number: E9-2179
Type: Rule
Date: 2009-02-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Section 651(e) of the Energy Policy Act of 2005 (EPAct) authorized the U.S. Nuclear Regulatory Commission (Commission or NRC) to issue a time-limited waiver (70 FR 51581; August 31, 2005) to allow continued use and possession of naturally-occurring and accelerator- produced radioactive materials (NARM) while the Commission developed a regulatory framework for regulation of the new byproduct material. The Commission has begun terminating the time-limited waiver in phases in accordance to the provisions of the ``Plan for the Transition of Regulatory Authority Resulting from the Expanded Definition of Byproduct Material'' (transition plan) issued by the Commission on October 19, 2007 (72 FR 59157). The first phase of waiver terminations occurred on November 30, 2007 (72 FR 68043), and the second phase occurred on September 30, 2008 (73 FR 14376). This document provides advance notification that on August 7, 2009, the Commission will terminate the time-limited waivers for all remaining non-Agreement States and Canadian licenses that are under NRC jurisdiction. Alaska, Connecticut, Hawaii, Michigan, New Jersey, and Virginia. As provided in the transition plan, for existing NRC licensees, NARM use amendments are required within 6 months from the date of waiver termination. For NARM users in non-Agreement States and Canadian licensees without a NRC license, the license applications are required within 12 months from the date waiver termination.