Notice of Issuance of Regulatory Guide
Document Number: E8-22534
Type: Notice
Date: 2008-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice of License Termination CBS Test Reactor Located at Waltz Mill Site, Madison, PA
Document Number: E8-22533
Type: Notice
Date: 2008-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice of Issuance of Regulatory Guide
Document Number: E8-22532
Type: Notice
Date: 2008-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: E8-22531
Type: Notice
Date: 2008-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register Notice with a 60-day comment period on this information collection on June 30, 2008. 1. Type of submission, new, revision, or extension: Revision. 2. The title of the information collection: Voluntary Reporting of Performance Indicators. 3. Current OMB approval number: 3150-0195. 4. The form number if applicable: NA. 5. How often the collection is required: Quarterly. 6. Who will be required or asked to report: Power reactor licensees. 7. An estimate of the number of annual responses: 416. 8. The estimated number of annual respondents: 104. 9. An estimate of the total number of hours needed annually to complete the requirement or request: Approximately 84,500 hours (83,200 reporting hours plus 1,300 recordkeeping hours for 26 recordkeepers). 10. Abstract: As part of a joint industry-NRC initiative, the NRC receives information submitted voluntarily by power reactor licensees regarding selected performance attributes known as performance indicators (PIs). PIs are objective measures of the performance of licensee systems or programs. The NRC's reactor oversight process uses PI information, along with the results of inspections, as the basis for NRC conclusions regarding plant performance and necessary regulatory response. Licensees transmit PIs electronically to reduce burden on themselves and the NRC. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by October 27, 2008. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. Nathan J. Frey, Office of Information and Regulatory Affairs (3150- 0195), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to Nathan_J._Frey@omb.eop.gov or submitted by telephone at (202) 395-7345. The NRC Clearance Officer is Russell Nichols, (301) 415-6874.
Notice of Availability of Memorandum of Understanding Between U.S. Army Corps of Engineers and U.S. Nuclear Regulatory Commission on Environmental Reviews Related to the Issuance of Authorizations To Construct and Operate Nuclear Power Plants
Document Number: E8-22528
Type: Notice
Date: 2008-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On September 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Army Corps of Engineers (Corps) signed a Memorandum of Understanding (MOU) which establishes a framework for early coordination and participation among the agencies. The MOU is an effort to facilitate the timely review of proposed nuclear power plant applications and it establishes a commitment to early agency involvement; proactive participation and informal communication throughout the review process; sharing of information gathered, considered and relied upon by each agency; and, if requested, interagency participation in public hearings. Interagency cooperation under the MOU will facilitate each agency's compliance with its review responsibilities under the National Environmental Policy Act and other related statutes with respect to the authorizations required to construct and operate nuclear power plants licensed by the NRC. It is anticipated that the Corps will act as a cooperating agency in most circumstances; however, the MOU does not preclude different forms of coordination (e.g., Corps participation as a consulting agency).