Nuclear Regulatory Commission October 25, 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
List of Approved Spent Fuel Storage Casks: HI-STORM 100 Revision 4
The Nuclear Regulatory Commission (NRC) is amending its spent fuel storage cask regulations by revising the Holtec International (Holtec) HI-STORM 100 cask system listing within the ``List of Approved Spent Fuel Storage Casks'' to include Amendment No. 4 to Certificate of Compliance (CoC) Number 1014. Amendment No. 4 will include changes to add site-specific options to the CoC to permit use of a modified HI- STORM 100 cask system at the Indian Point Unit 1 (IP1) Independent Spent Fuel Storage Installation (ISFSI). These options include the shortening of the HI-STORM 100S Version B, Multi-Purpose Canister (MPC)-32 and MPC-32F, and the HI-TRAC 100D Canister to accommodate site-specific restrictions. Additional changes address the Technical Specification (TS) definition of transport operations and associated language in the safety analysis report (SAR); the soluble boron requirements for Array/Class 14x14E IP1 fuel; the helium gas backfill requirements for Array/Class 14x14E IP1 fuel; the addition of a fifth damaged fuel container design under the TS definition for damaged fuel container; addition of separate burnup, cooling time, and decay heat limits for Array/Class 14x14 IP1 fuel for loading in an MPC-32 and MPC- 32F; addition of antimony-beryllium secondary sources as approved contents; the loading of all IP1 fuel assemblies in damaged fuel containers; the preclusion of loading of IP1 fuel debris in the MPC-32 or MPC-32F; the reduction of the maximum enrichment for Array/Class 14x14E IP1 fuel from 5.0 to 4.5 weight percent uranium-235; changes to licensing drawings to differentiate the IP1 MPC-32 and MPC-32F from the previously approved MPC-32 and MPC-32F; and other editorial changes, including replacing all references to U.S. Tool and Die with Holtec Manufacturing Division.
List of Approved Spent Fuel Storage Casks: HI-STORM 100 Revision 4
The Nuclear Regulatory Commission (NRC) is proposing to amend its spent fuel storage cask regulations by revising the Holtec International (Holtec) HI-STORM 100 cask system listing within the ``List of Approved Spent Fuel Storage Casks'' to include Amendment No. 4 to Certificate of Compliance (CoC) Number 1014. Amendment No. 4 would modify the CoC by including changes to add site-specific options to the CoC to permit use of a modified HI-STORM 100 cask system at the Indian Point Unit 1 (IP1) Independent Spent Fuel Storage Installation (ISFSI). These options include the shortening of the HI-STORM 100S Version B, Multi-Purpose Canister (MPC)-32 and MPC-32F and the HI-TRAC 100D Canister to accommodate site-specific restrictions. Additional changes address the Technical Specification (TS) definition of transport operations and associated language in the safety analysis report (SAR); the soluble boron requirements for Array/Class 14x14E IP1 fuel; the helium gas backfill requirements for Array/Class 14x14E IP1 fuel; the addition of a fifth damaged fuel container design under the TS definition for damaged fuel container; addition of separate burnup, cooling time, and decay heat limits for Array/Class 14x14 IP1 fuel for loading in an MPC-32 and MPC-32F; addition of antimony-beryllium secondary sources as approved contents; the loading of all IP1 fuel assemblies in damaged fuel containers; the preclusion of loading of IP1 fuel debris in the MPC-32 or MPC-32F; the reduction of the maximum enrichment for Array/Class 14x14E IP1 fuel from 5.0 to 4.5 weight percent uranium-235; changes to licensing drawings to differentiate the IP1 MPC-32 and MPC-32F from the previously approved MPC-32 and MPC-32F; and other editorial changes, including replacing all references to U.S. Tool and Die with Holtec Manufacturing Division.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.