Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: E6-19845
Type: Notice
Date: 2006-11-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is preparing a submittal to OMB for review of continued approval of information collections under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: 10 CFR Part 50, ``Domestic Licensing of Production and Utilization Facilities.'' 2. Current OMB approval number: 3150-0011. 3. How often the collection is required: As necessary in order for NRC to meet its responsibilities to conduct a detailed review of applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or final design approvals, design certifications, research and test facilities, reprocessing plants and other utilization and production facilities, licensed pursuant to the Atomic Energy Act of 1954, as amended (the Act) and to monitor their activities. 4. Who is required or asked to report: Licensees and applicants for nuclear power plants and research and test facilities. 5. The number of annual respondents: 187. 6. The number of hours needed annually to complete the requirement or request: 6,168.6M: 3,141.4M hours reporting (an average of 69 hrs/ response) + 3,027.2M hours recordkeeping (an average of 16.2K hrs/ recordkeeper). 7. Abstract: 10 CFR Part 50 of the NRC's regulations ``Domestic Licensing of Production and Utilization Facilities,'' specifies technical information and data to be provided to the NRC or maintained by applicants and licensees so that the NRC may take determinations necessary to protect the health and safety of the public, in accordance with the Act. The reporting and recordkeeping requirements contained in 10 CFR 50 are mandatory for the affected licensees and applicants. Submit, by January 23, 2007, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F23, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions about the information collection requirements may be directed to the NRC Clearance Officer, Brenda Jo. Shelton, U.S. Nuclear Regulatory Commission, T5-F52, Washington, DC 20555-0001, by telephone at 301-415-7233, or by Internet electronic mail at INFOCOLLECTS@NRC.GOV.
Notice of Availability of the Final License Renewal Interim Staff Guidance-LR-ISG-2006-01: Plant-Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor (BWR) Mark I Steel Containment Drywell Shell
Document Number: E6-19838
Type: Notice
Date: 2006-11-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is issuing its Final License Renewal Interim Staff Guidance LR-ISG-2006-01. This LR-ISG provides interim guidance to applicants for license renewal for a plant with a BWR Mark I steel containment to provide a plant-specific aging management program that addresses the potential loss of material due to corrosion in the inaccessible areas of their Mark I steel containment drywell shell for the period of extended operation. The NRC staff issues LR-ISGs to facilitate timely implementation of the license renewal rule and to review activities associated with a license renewal application. The NRC staff will also incorporate the approved LR-ISG into the next revision of the license renewal guidance documents.