Nuclear Regulatory Commission October 12, 2006 – Federal Register Recent Federal Regulation Documents

``Demonstrating the Feasibility and Reliability of Operator Manual Actions in Response to Fire, Draft Report for Comment''
Document Number: E6-16872
Type: Notice
Date: 2006-10-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) is announcing the availability of and is seeking comments on NUREG-1852, ``Demonstrating the Feasibility and Reliability of Operator Manual Actions in Response to Fire, Draft Report For Comment.''
Abnormal Occurrence Reports: Implementation of Section 208 of the Energy Reorganization Act of 1974; Revised Policy Statement
Document Number: E6-16871
Type: Notice
Date: 2006-10-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This policy statement presents the revised abnormal occurrence (AO) criteria the Commission uses for selecting AO's for the annual report to Congress as required by Section 208 of the Energy Reorganization Act of 1974 (Pub. L. 93-438). Section 208 of the act defines an AO as an unscheduled incident or event which the U.S. Nuclear Regulatory Commission (NRC) determines to be significant from the standpoint of public health or safety. The AO criteria have been amended to ensure that the criteria are consistent with the NRC's Strategic Plan for Fiscal Year (FY) 2004-2009 and the NRC rulemaking on Title 10, Part 35, of the Code of Federal Regulations (10 CFR Part 35), ``Medical Use of Byproduct Material.'' Additionally, risk-informed criteria based on the NRC Accident Sequence Precursor (ASP) Program and Reactor Oversight Process (ROP) have been added for selecting abnormal occurrences at commercial nuclear power plants for the report to Congress. The ASP program assesses the risk significance of issues and events. The ROP is a risk-informed, tiered approach to ensuring the safety of nuclear power plants. The ROP is a process for collecting information about licensee performance, assessing the safety significance of the information, taking appropriate actions, and ensuring that licensees correct deficiencies. Some sections of the AO criteria have been restructured. The restructuring accommodates the changes in the criteria and minimizes duplication.
Advisory Committee On Nuclear Waste; Procedures for Meetings
Document Number: E6-16870
Type: Notice
Date: 2006-10-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.