Nuclear Regulatory Commission March 21, 2006 – Federal Register Recent Federal Regulation Documents

Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: E6-4086
Type: Notice
Date: 2006-03-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is preparing a submittal to OMB for review of continued approval of information collections under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 590, Application/Permit for Use of the Two White Flint North (TWFN) Auditorium. 2. Current OMB approval number: 3150-0181. 3. How often the collection is required: Each time public use of the auditorium is requested. 4. Who is required or asked to report: Members of the public requesting use of the NRC Auditorium. 5. The number of annual respondents: 5. 6. The number of hours needed annually to complete the requirement or request: 1.25 hours (15 minutes per request). 7. Abstract: In accordance with the Public Buildings Act of 1959, an agreement was reached between the Maryland-National Capital Park and Planning Commission (MPPC), the General Services Administration (GSA), and the Nuclear Regulatory Commission that the NRC auditorium will be made available for public use. Public users of the auditorium will be required to complete NRC Form 590, Application/Permit for Use of Two White Flint North (TWFN) Auditorium. The information is needed to allow for administrative and security review and scheduling, and to make a determination that there are no anticipated problems with the requester prior to utilization of the facility. Submit, by May 22, 2006, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC world wide web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions about the information collection requirements may be directed to the NRC Clearance Officer, Brenda Jo. Shelton (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-7233, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
Advisory Committee on Reactor Safeguards; Subcommittee Meeting on Planning and Procedures; Notice of Meeting
Document Number: E6-4084
Type: Notice
Date: 2006-03-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
List of Approved Spent Fuel Storage Casks: VSC-24 Revision 6
Document Number: E6-4083
Type: Proposed Rule
Date: 2006-03-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) is proposing to amend its regulations revising the BNG Fuel Solutions Corporation VSC-24 cask system listing within the ``List of Approved Spent Fuel Storage Casks'' to include Amendment No. 6 to the Certificate of Compliance. Amendment No. 6 would modify the present cask system design to revise the Technical Specification (TS) requirements related to periodic monitoring during storage operation. Specifically, the amendment would eliminate TS 1.3.4 that requires daily temperature measurement of the cask. The daily temperature measurement is not required because the daily visual inspection of the cask inlet and outlet vent screens, required by TS 1.3.1, provides the capability to determine when corrective action needs to be taken to maintain safe storage conditions under the requirements that govern general design criteria for spent fuel storage casks. This is because the visual inspection would determine if the cask inlets and outlets were blocked (the focus of the thermal analysis submitted by the CoC holder). The amendment would also revise TS 1.2.3 to correspond with TS 1.3.1 by revising the method of thermal performance evaluation to allow for daily temperature surveillance after the cask has reached thermal equilibrium. In addition, the amendment would update editorial changes associated with the company name change from BNFL Fuel Solutions Corporation to BNG Fuel Solutions Corporation.
Sunshine Act Meetings
Document Number: 06-2777
Type: Notice
Date: 2006-03-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
List of Approved Spent Fuel Storage Casks: VSC-24 Revision 6
Document Number: 06-2715
Type: Rule
Date: 2006-03-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) is amending its regulations revising the BNG Fuel Solutions Corporation VSC-24 cask system listing within the ``List of Approved Spent Fuel Storage Casks'' to include Amendment No. 6 to Certificate of Compliance Number 1007. Amendment No. 6 will modify the present cask system design to revise the Technical Specification (TS) requirements related to periodic monitoring during storage operation under a general license. Specifically, the amendment will eliminate TS 1.3.4 that requires daily temperature measurement of the cask. The daily temperature measurement is not required because the daily visual inspection of the cask inlet and outlet vent screens, required by TS 1.3.1, provides the capability to determine when corrective action needs to be taken to maintain safe storage conditions under the requirements that govern general design criteria for spent fuel storage casks. This is because the visual inspection would determine if the cask inlets and outlets were blocked (the focus of the thermal analysis submitted by the CoC holder). The amendment will also revise TS 1.2.3 to correspond with TS 1.3.1 by revising the method of thermal performance evaluation to allow for daily temperature surveillance after the cask has reached thermal equilibrium. In addition, the amendment updates editorial changes associated with the company name change from BNFL Fuel Solutions Corporation to BNG Fuel Solutions Corporation.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.