Nuclear Regulatory Commission April 8, 2005 – Federal Register Recent Federal Regulation Documents

Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: E5-1616
Type: Notice
Date: 2005-04-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is preparing a submittal to OMB for review of continued approval of information collections under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: Notice of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (GDP). 2. Current OMB approval number: 3150-0136. 3. How often the collection is required: On occasion. 4. Who is required or asked to report: Nuclear power reactor licensees and gaseous diffusion plant certificate holders. 5. The number of annual respondents: 11. 6. The number of hours needed annually to complete the requirement or request: 1,991 hours (1810 reporting [121 hours per response] and 181 recordkeeping [16.45 hours per recordkeeper]). 7. Abstract: The NRC's Enforcement Policy addresses circumstances in which the NRC may exercise enforcement discretion. A specific type of enforcement discretion is designated as a Notice of Enforcement Discretion (NOED) and relates to circumstances which may arise where a nuclear power plant licensee's compliance with a Technical Specification Limiting Condition for Operation or with other license conditions would involve an unnecessary plant transient or shutdown, or performance of testing, inspection, or system realignment that is inappropriate for the specific plant conditions, or unnecessary delays in plant startup without a corresponding health and safety benefit. Similarly, for a gaseous diffusion plant, circumstances may arise where compliance with a Technical Safety Requirement or other condition would unnecessarily call for a total plant shutdown, or, notwithstanding that a safety, safeguards or security feature was degraded or inoperable, compliance would unnecessarily place the plant in a transient or condition where those features could be required. A licensee or certificate holder seeking the issuance of an NOED must provide a written justification, in accordance with guidance provided in NRC Inspection Manual, Part 9900, which documents the safety basis for the request and provides whatever other information the NRC staff deems necessary to decide whether or not to exercise discretion. Submit, by June 7, 2005, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions about the information collection requirements may be directed to the NRC Clearance Officer, Brenda Jo. Shelton (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at (301) 415-7233, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.