Agencies and Commissions October 19, 2017 – Federal Register Recent Federal Regulation Documents

Sunshine Act Meeting
Document Number: 2017-22794
Type: Notice
Date: 2017-10-19
Agency: Federal Deposit Insurance Corporation, Agencies and Commissions
Privacy Act Regulations; Correction
Document Number: 2017-22697
Type: Rule
Date: 2017-10-19
Agency: National Capital Planning Commission, Agencies and Commissions
The National Capital Planning Commission (NCPC or Commission) is correcting a final rule that appeared in the Federal Register on September 20, 2017. The document issued New Privacy Act Regulations.
National Environmental Policy Act Regulations; Correction
Document Number: 2017-22696
Type: Rule
Date: 2017-10-19
Agency: National Capital Planning Commission, Agencies and Commissions
The National Capital Planning Commission (NCPC or Commission) is correcting a final rule that appeared in the Federal Register on September 29, 2017. The document issued New National Environmental Policy Act Regulations.
Revision of the Guidance Document for Alternative Disposal Requests
Document Number: 2017-22694
Type: Notice
Date: 2017-10-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is requesting comment on the draft revision to its guidance document for alternative disposal requests entitled, ``Guidance for the Reviews of Proposed Disposal Procedures and Transfers of Radioactive Material Under 10 CFR 20.2002 and 10 CFR 40.13(a).''
Presidential Declaration of a Major Disaster for the State of California
Document Number: 2017-22673
Type: Notice
Date: 2017-10-19
Agency: Small Business Administration, Agencies and Commissions
This is a Notice of the Presidential declaration of a major disaster for the State of California (FEMA-4344-DR), dated 10/12/2017. Incident: Wildfires. Incident Period: 10/08/2017 and continuing.
Quality Assurance Program Criteria (Design and Construction)
Document Number: 2017-22670
Type: Notice
Date: 2017-10-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 5 to Regulatory Guide (RG) 1.28, ``Quality Assurance Program Criteria (Design and Construction).'' This regulatory guide (RG 1.28) updates the guidance to endorse, with clarification or exceptions, multiple revisions of the American Society of Mechanical Engineers standard NQA-1 titled ``Quality Assurance Requirements for Nuclear Facility Applications.'' The proposed revision describes methods that the NRC considers acceptable for establishing and implementing a quality assurance (QA) program for the design and construction of nuclear power plants and fuel reprocessing plants.
Advisory Committee for Mathematical and Physical Sciences; Notice of Meeting
Document Number: 2017-22666
Type: Notice
Date: 2017-10-19
Agency: National Science Foundation, Agencies and Commissions
Agency Information Collection Activities: Comment Request
Document Number: 2017-22664
Type: Notice
Date: 2017-10-19
Agency: Export-Import Bank, Agencies and Commissions
The Export-Import Bank of the United States (EXIM), as a part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal Agencies to comment on the proposed information collection, as required by the Paperwork Reduction Act of 1995. This collection of information is necessary to determine eligibility of the export sales for insurance coverage. The Report of Premiums Payable for Financial Institutions Only is used to determine the eligibility of the shipment(s) and to calculate the premium due to Ex-Im Bank for its support of the shipment(s) under its insurance program. Export-Import Bank customers will be able to submit this form on paper or electronically. By neutralizing the effect of export credit support offered by foreign governments and by absorbing credit risks that the private sector will not accept, EXIM enables U.S. exporters to compete fairly in foreign markets on the basis of price and product. Under the Working Capital Guarantee Program, EXIM provides repayment guarantees to lenders on secured, short-term working capital loans made to qualified exporters. The guarantee may be approved for a single loan or a revolving line of credit. In the event that a buyer defaults on a transaction insured by EXIM, the insured exporter or lender may seek payment by the submission of a claim.
Brass Sheet and Strip From France, Germany, Italy, and Japan; Determinations
Document Number: 2017-22653
Type: Notice
Date: 2017-10-19
Agency: International Trade Commission, Agencies and Commissions
Certain Personal Transporters, Components Thereof, and Packaging and Manuals Therefor and Certain Personal Transporters and Components Thereof; Notice of a Commission Determination To Review in Part a Final Initial Determination; Schedule for Filing Written Submissions on Certain Issues Under Review and on Remedy, the Public Interest, and Bonding
Document Number: 2017-22652
Type: Notice
Date: 2017-10-19
Agency: International Trade Commission, Agencies and Commissions
Notice is hereby given that the U.S. International Trade Commission (``the Commission'') has determined to review in part the final initial determination (``ID'') issued by the presiding administrative law judge (``ALJ'') finding in part a violation of section 337 of the Tariff Act of 1930, as amended, in the above- referenced investigation on August 10, 2017. The Commission requests certain briefing from the parties on the issues under review, as indicated in this notice. The Commission also requests briefing from the parties and interested persons on the issues of remedy, the public interest, and bonding.
Proposed Collection; Comment Request
Document Number: 2017-22651
Type: Notice
Date: 2017-10-19
Agency: Railroad Retirement Board, Agencies and Commissions
In accordance with the requirement of Section 3506 (c)(2)(A) of the Paperwork Reduction Act of 1995 which provides opportunity for public comment on new or revised data collections, the Railroad Retirement Board (RRB) will publish periodic summaries of proposed data collections. Comments are invited on: (a) Whether the proposed information collection is necessary for the proper performance of the functions of the agency, including whether the information has practical utility; (b) the accuracy of the RRB's estimate of the burden of the collection of the information; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden related to the collection of information on respondents, including the use of automated collection techniques or other forms of information technology. 1. Title and purpose of information collection: RUIA Claims Notification and Verification System; OMB 3220-0171. Section 5(b) of the Railroad Unemployment Insurance Act (RUIA), requires that effective January 1, 1990, when a claim for benefits is filed with the Railroad Retirement Board (RRB), the RRB shall provide notice of the claim to the claimant's base year employer(s) to provide them an opportunity to submit information relevant to the claim before making an initial determination. If the RRB determines to pay benefits to the claimant under the RUIA, the RRB shall notify the base-year employer(s). The purpose of the RUIA Claims Notification and Verification System is to provide two notices, pre-payment Form ID-4K, Prepayment Notice of Employees' Applications and Claims for Benefits Under the Railroad Unemployment Insurance Act, and post-payment Form ID-4E, Notice of RUIA Claim Determination. Prepayment Form ID-4K provides notice to a claimant's base-year employer(s), of each unemployment application and unemployment and sickness claim filed for benefits under the RUIA and provides the employer an opportunity to convey information relevant to the proper adjudication of the claim. The railroad employer can elect to receive Form ID-4K by one of three options: A computer-generated paper notice, by Electronic Data Interchange (EDI), or online via the RRB's Employer Reporting System (ERS). The railroad employer can respond to the ID-4K notice by telephone, manually by mailing a completed ID-4K back to the RRB, or electronically via EDI or ERS. Completion is voluntary. The RRB proposes to replace using EDI with the use of secure File Transfer Protocol (FTP), which is the standard network protocol used for transferring files between a railroad employer and the RRB. The RRB proposes no changes to the other versions of the ID-4K. Once the RRB determines to pay a claim post-payment Form Letter ID- 4E, Notice of RUIA Claim Determination, is used to notify the base-year employer(s). This gives the employer a second opportunity to challenge the claim for benefits. The ID-4E mainframe-generated paper notice, EDI, and Internet versions are transmitted on a daily basis, generally on the same day that the claims are approved for payment. Railroad employers who are mailed Form ID-4E are instructed to write if they want a reconsideration of the RRB's determination to pay. Employers who receive the ID-4E electronically, may file a reconsideration request by completing the ID-4E by either EDI or ERS. Completion is voluntary. The RRB proposes to replace using EDI with the use of secure File Transfer Protocol (FTP). The RRB proposes no changes to the other versions of the ID-4E.
Agency Forms Submitted for OMB Review, Request for Comments
Document Number: 2017-22647
Type: Notice
Date: 2017-10-19
Agency: Railroad Retirement Board, Agencies and Commissions
In accordance with the Paperwork Reduction Act of 1995, the Railroad Retirement Board (RRB) is forwarding an Information Collection Request (ICR) to the Office of Information and Regulatory Affairs (OIRA), Office of Management and Budget (OMB). Our ICR describes the information we seek to collect from the public. Review and approval by OIRA ensures that we impose appropriate paperwork burdens. The RRB invites comments on the proposed collections of information to determine (1) the practical utility of the collections; (2) the accuracy of the estimated burden of the collections; (3) ways to enhance the quality, utility, and clarity of the information that is the subject of collection; and (4) ways to minimize the burden of collections on respondents, including the use of automated collection techniques or other forms of information technology. Comments to the RRB or OIRA must contain the OMB control number of the ICR. For proper consideration of your comments, it is best if the RRB and OIRA receive them within 30 days of the publication date. 1. Title and purpose of information collection: Certification of Termination of Service and Relinquishment of Rights; OMB 3220-0016. Under Section 2(e)(2) of the Railroad Retirement Act (RRA), an age and service annuity, spouse annuity, or divorced spouse annuity cannot be paid unless the Railroad Retirement Board (RRB) has evidence that the applicant has ceased railroad employment and relinquished rights to return to the service of a railroad employer. Under Section 2(f)(6) of the RRA, earnings deductions are required for each month an annuitant works in certain non-railroad employment termed Last Pre-Retirement Non-Railroad Employment. Normally, the employee, spouse, or divorced spouse relinquishes rights and certifies that employment has ended as part of the annuity application process. However, this is not always the case. In limited circumstances, the RRB utilizes Form G-88, Certification of Termination of Service and Relinquishment of Rights, to obtain an applicant's report of termination of employment and relinquishment of rights. One response is required of each respondent. Completion is required to obtain or retain benefits. Previous Requests for Comments: The RRB has already published the initial 60-day notice (82 FR 37133 on August 8, 2017) required by 44 U.S.C. 3506(c)(2). That request elicited no comments.
Proposed Collection; Comment Request
Document Number: 2017-22646
Type: Notice
Date: 2017-10-19
Agency: Securities and Exchange Commission, Agencies and Commissions
Update to Product Lists
Document Number: 2017-22645
Type: Rule
Date: 2017-10-19
Agency: Postal Regulatory Commission, Agencies and Commissions
The Commission is updating the product lists. This action reflects a publication policy adopted by Commission order. The referenced policy assumes periodic updates. The updates are identified in the body of this document. The product lists, which are re-published in its entirety, include these updates.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.