McNally/Kiewit Shoreline Storage Tunnel Joint Venture; Application for Permanent Variance and Interim Order; Grant of Interim Order; Request for Comments, 58379-58389 [2022-20782]
Download as PDF
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
DEPARTMENT OF LABOR
Occupational Safety and Health
Administration
[Docket No. OSHA–2022–0007]
McNally/Kiewit Shoreline Storage
Tunnel Joint Venture; Application for
Permanent Variance and Interim Order;
Grant of Interim Order; Request for
Comments
Occupational Safety and Health
Administration (OSHA), Labor.
ACTION: Notice.
AGENCY:
In this notice, OSHA
announces the application of McNally/
Kiewit Shoreline Storage Tunnel (SST)
Joint Venture for a permanent variance
and interim order from provisions of
OSHA standards that regulate work in
compressed air environments and
presents the agency’s preliminary
finding on McNally/Kiewit’s application
and announces the granting of an
interim order. OSHA invites the public
to submit comments on the variance
application to assist the agency in
determining whether to grant the
applicant a permanent variance based
on the conditions specified in this
application.
DATES: Submit comments, information,
documents in response to this notice,
and request for a hearing on or before
October 26, 2022. The interim order
described in this notice will become
effective on September 26, 2022, and
shall remain in effect until the
completion of the SST project for
Cleveland, Ohio or the interim order is
modified or revoked.
ADDRESSES:
Electronically: You may submit
comments and attachments
electronically at: https://
www.regulations.gov, which is the
Federal eRulemaking Portal. Follow the
instructions online for submitting
comments.
Facsimile: If your comments,
including attachments, are not longer
than 10 pages, you may fax them to the
OSHA Docket Office at (202) 693–1648.
Mail, hand delivery, express mail,
messenger, or courier service: When
using this method, you must submit a
copy of your comments and attachments
to the OSHA Docket Office, Docket No.
OSHA–2022–0007, Occupational Safety
and Health Administration, U.S.
Department of Labor, Room N–3653,
200 Constitution Avenue NW,
Washington, DC 20210. Deliveries
(hand, express mail, messenger, and
courier service) are accepted during the
Docket Office’s normal business hours,
10:00 a.m. to 3:00 p.m., ET.
SUMMARY:
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
Instructions: All submissions must
include the agency name and OSHA
docket number (OSHA–2022–0007). All
comments, including any personal
information you provide, are placed in
the public docket without change, and
may be made available online at https://
www.regulations.gov.
Docket: To read or download
comments or other material in the
docket, go to https://www.regulations.gov
or the OSHA Docket Office at the above
address. All documents in the docket
(including this Federal Register notice)
are listed in the https://
www.regulations.gov index; however,
some information (e.g., copyrighted
material) is not publicly available to
read or download through the website.
All submissions, including copyrighted
material, are available for inspection at
the OSHA Docket Office. You may also
contact Kevin Robinson, Director Office
of Technical Programs and Coordination
Activities (OTPCA) at the below
address.
FOR FURTHER INFORMATION CONTACT:
Information regarding this notice is
available from the following sources:
Press inquiries: Contact Mr. Frank
Meilinger, Director, OSHA Office of
Communications, U.S. Department of
Labor; telephone: (202) 693–1999;
email: meilinger.francis2@dol.gov.
General and technical information:
Contact Mr. Kevin Robinson, Director,
Office of Technical Programs and
Coordination Activities, Directorate of
Technical Support and Emergency
Management, Occupational Safety and
Health Administration, U.S. Department
of Labor; telephone: (202) 693–2110;
email: robinson.kevin@dol.gov.
Copies of this Federal Register notice.
Electronic copies of this Federal
Register notice are available at https://
www.regulations.gov. This Federal
Register notice, as well as news releases
and other relevant information, also are
available at OSHA’s web page at https://
www.osha.gov.
Hearing requests. According to 29
CFR 1905.15, hearing requests must
include: (1) a short and plain statement
detailing how the proposed Variance
would affect the requesting party; (2) a
specification of any statement or
representation in the Variance
application that the commenter denies,
and a concise summary of the evidence
offered in support of each denial; and
(3) any views or arguments on any issue
of fact or law presented in the variance
application.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
58379
I. Notice of Application
OSHA’s standards in subpart S of 29
CFR part 1926 govern underground
construction, caissons, cofferdams, and
compressed air. On November 12, 2021,
McNally/Kiewit SST Joint Venture
(‘‘McNally’’ or ‘‘the applicant’’), 800
Westpoint Parkway, Suite 1130,
Westlake, Ohio 44145, submitted under
Section 6(d) of the Occupational Safety
and Health Act of 1970 (OSH Act; 29
U.S.C. 655) and 29 CFR 1905.11
(variances and other relief under section
6(d)) an application for a permanent
variance from several provisions of the
OSHA standard that regulates work in
compressed air, 1926.803 of 1926
Subpart S—Underground Construction,
Caissons, Cofferdams, and Compressed
Air, and an interim order allowing it to
proceed while OSHA considers the
request for a permanent variance
(OSHA–2022–0007–0001). This notice
addresses McNally’s application for a
permanent variance and interim order
for construction of the SST Project in
Cleveland, Ohio, only and is not
applicable to future McNally or
McNally-related joint venture tunneling
projects.
Specifically, this notice addresses
McNally’s application for a permanent
variance and interim order from the
provisions of the standard that: (1)
prohibit compressed-air worker
exposure to pressures exceeding 50
pounds per square inch (p.s.i.) except in
an emergency (29 CFR 1926.803(e)(5)); 1
(2) require the use of the decompression
values specified in decompression
tables in Appendix A of the
compressed-air standard for
construction (29 CFR 1926.803(f)(1));
and (3) require the use of automated
operational controls and a special
decompression chamber (29 CFR
1926.803(g)(1)(iii) and .803(g)(1)(xvii),
respectively).
OSHA has previously approved
nearly identical provisions when
granting several other very similar
variances, as discussed in more detail in
Section II. OSHA preliminarily
concludes that the proposed variance is
appropriate, grants an interim order
temporarily allowing the proposed
activity, and seeks comment on the
proposed variance.
1 The decompression tables in Appendix A of
subpart S express the maximum working pressures
as pounds per square inch gauge (p.s.i.g.), with a
maximum working pressure of 50 p.s.i.g. Therefore,
throughout this notice, OSHA expresses the 50 p.s.i.
value specified by 29 CFR 1926.803(e)(5) as 50
p.s.i.g., consistent with the terminology in
Appendix A, Table 1 of subpart S.
E:\FR\FM\26SEN1.SGM
26SEN1
58380
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
Background
The applicant is a contractor that
works on complex underground tunnel
projects using innovations in tunnelexcavation methods. The applicant’s
workers engage in the construction of
tunnels using advanced shielded
mechanical excavation techniques in
conjunction with an earth pressure
balanced micro-tunnel boring machine
(TBM). Using shielded mechanical
excavation techniques, in conjunction
with precast concrete tunnel liners and
backfill grout, TBMs provide methods to
achieve the face pressures required to
maintain a stabilized tunnel face
through various geologies, and isolate
that pressure to the forward section (the
working chamber) of the TBM.
McNally asserts that generally it bores
tunnels using an TBM at levels below
the water table through soft soils
consisting of clay, silt, and sand. TBMs
are capable of maintaining pressure at
the tunnel face, and stabilizing existing
geological conditions, through the
controlled use of a mechanically driven
cutter head, bulkheads within the
shield, ground-treatment foam, and a
screw conveyor that moves excavated
material from the working chamber. The
forward-most portion of the TBM is the
working chamber, and this chamber is
the only pressurized segment of the
TBM. Within the shield, the working
chamber consists of two sections: the
forward working chamber and the
staging chamber. The forward working
chamber is immediately behind the
cutter head and tunnel face. The staging
chamber is behind the forward working
chamber and between the man-lock
door, and the entry door to the forward
working chamber.
The TBM has twin man-locks located
between the pressurized working
chamber and the non-pressurized
portion of the machine. Each man-lock
has two compartments. This
configuration allows workers to access
the man-locks for compression and
decompression, and medical personnel
to access the man-locks if required in an
emergency.
McNally’s variance application
indicated that the maximum pressure to
which it is likely to expose workers
during project interventions for the SST
Project is 55 p.s.i. Therefore, to work
effectively, McNally must perform
hyperbaric interventions in compressed
air at pressures 10 percent higher than
the maximum pressure specified by the
existing OSHA standard, 29 CFR
1926.803(e)(5), which states: ‘‘No
employee shall be subjected to pressure
exceeding 50 p.s.i.g. except in
emergency’’ (see footnote 1).
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
McNally employs specially trained
personnel for the construction of the
tunnel. To keep the machinery working
effectively, McNally asserts that these
workers must periodically enter the
excavation working chamber of the TBM
to perform hyperbaric interventions
during which workers would be
exposed to air pressures up to 55 p.s.i.,
which exceeds the maximum pressure
specified by the existing OSHA standard
at 29 CFR 1926.803(e)(5). These
interventions consist of conducting
inspections or maintenance work on the
cutter-head structure and cutting tools
of the TBM, such as changing
replaceable cutting tools and disposable
wear bars, and, in rare cases, repairing
structural damage to the cutter head.
These interventions are the only time
that workers are exposed to compressed
air. Interventions in the working
chamber (the pressurized portion of the
TBM) take place only after halting
tunnel excavation and preparing the
machine and crew for an intervention.
During interventions, workers enter
the working chamber through one of the
twin man-locks that open into the
staging chamber. To reach the forward
part of the working chamber, workers
pass through a door in a bulkhead that
separates the staging chamber from the
forward working chamber. The manlocks and the working chamber are
designed to accommodate three people,
which is the maximum crew size
allowed under the proposed variance.
When the required decompression times
are greater than work times, the twin
man-locks allow for crew rotation.
During crew rotation, one crew can be
compressing or decompressing while
the second crew is working. Therefore,
the working crew always has an
unoccupied man-lock at its disposal.
McNally asserts that these
innovations in tunnel excavation have
greatly reduced worker exposure to
hazards of pressurized air work because
they have eliminated the need to
pressurize the entire tunnel for the
project and would thereby reduce the
number of workers exposed, as well as
the total duration of exposure, to
hyperbaric pressure during tunnel
construction. These advances in
technology substantially modified the
methods used by the construction
industry to excavate subaqueous tunnels
compared to caisson work.
In addition to the reduced exposures
resulting from the innovations in
tunnel-excavation methods, McNally
asserts that innovations in hyperbaric
medicine and technology improve the
safety of decompression from
hyperbaric exposures. These
procedures, however, would deviate
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
from the decompression process that
OSHA requires for construction in 29
CFR 1926.803(e)(5) and (f)(1) and the
decompression tables in Appendix A of
29 CFR 1926, subpart S. Nevertheless,
according to McNally, their use of
decompression protocols incorporating
oxygen is more efficient, effective, and
safer for tunnel workers than
compliance with the decompression
tables specified by the existing OSHA
standard.
McNally therefore believes its workers
will be at least as safe under its
proposed alternatives as they would be
under OSHA’s standard because of the
reduction in number of workers and
duration of hyperbaric exposures, a
better application of hyperbaric
medicine, and the development of a
project-specific Hyperbaric Operations
Manual (HOM), (OSHA–2022–0007–
0002) that requires specialized medical
support and hyperbaric supervision to
provide assistance to a team of specially
trained man-lock attendants; and
hyperbaric or compressed-air workers
(CAWs).
Based on an initial review of
McNally’s application for a permanent
variance and interim order for the
construction of the SST Project in
Cleveland, Ohio, OSHA has
preliminarily determined that McNally
has proposed an alternative that would
provide a workplace at least as safe and
healthful as that provided by the
standard.
II. The Variance Application
Pursuant to the requirements of
OSHA’s variance regulations (29 CFR
1905.11), the applicant has certified that
it notified its workers 2 of the variance
application and request for interim
order by posting, at prominent locations
where it normally posts workplace
notices, a summary of the application
and information specifying where the
workers can examine a copy of the
application. In addition, the applicant
informed its workers and their
representatives of their rights to petition
the Assistant Secretary of Labor for
Occupational Safety and Health for a
hearing on the variance application.
A. OSHA History of Approval of Nearly
Identical Variance Requests
OSHA has previously approved
several nearly identical variances
involving the same types of tunneling
equipment used for similar projects.
OSHA notes that it granted five
subaqueous tunnel construction
permanent variances from the same
2 See the definition of ‘‘Affected employee or
worker’’ in section V.D of this Notice.
E:\FR\FM\26SEN1.SGM
26SEN1
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
provisions of OSHA’s compressed-air
standard (29 CFR 1926.803(e)(5),(f)(1),
(g)(1)(iii), and (g)(1)(xvii)) that are the
subject of the present application: (1)
Impregilo, Healy, Parsons, Joint Venture
(IHP JV) for the completion of the
Anacostia River Tunnel in Washington,
DC (80 FR 50652 (August 20, 2015)); (2)
Traylor JV for the completion of the
Blue Plains Tunnel in Washington, DC
(80 FR 16440, March 27, 2015)); (3)
Tully/OHL USA Joint Venture for the
completion of the New York Economic
Development Corporation’s New York
Siphon Tunnel project (79 FR 29809,
May 23, 2014)); and (4) SaliniImpregilo/Healy Joint Venture for the
completion of the Northeast Boundary
Tunnel in Washington, DC (85 FR
27767, May 11, 2020). OSHA has also
granted interim orders to two
applicants, Ballard Marine for the
Suffolk County Outfall Tunnel project
in West Babylon, New York (86 FR
5253, January 19, 2021) and Traylor
Shea Joint Venture for the Alexandria
RiverRenew Tunnel Project in
Alexandria, Virginia and Washington,
DC (87 FR 54536, September 6, 2022).
The proposed alternate conditions in
this notice are nearly identical to the
alternate conditions of the previous
permanent variances. OSHA is not
aware of any injuries or other safety
issues that arose from work performed
under these conditions in accordance
with the previous variances.
B. Variance From Paragraph (e)(5) of 29
CFR 1926.803, Prohibition of Exposure
to Pressure Greater Than 50 p.s.i.g. (See
Footnote 1)
The applicant states that it may
perform hyperbaric interventions at
pressures up to 55 p.s.i.g. in the working
chamber of the TBM; this pressure
exceeds the pressure limit of 50 p.s.i.
specified for nonemergency purposes by
29 CFR 1926.803(e)(5). The TBM has
twin man-locks, with each man-lock
having two compartments. This
configuration allows workers to access
the man-locks for compression and
decompression, and medical personnel
to access the man-locks if required in an
emergency.
TBMs are capable of maintaining
pressure at the tunnel face, and
stabilizing existing geological
conditions, through the controlled use
of a mechanically driven cutter head,
bulkheads within the shield, groundtreatment foam, and a screw conveyor
that moves excavated material from the
working chamber. As noted earlier, the
forward-most portion of the TBM is the
working chamber, and this chamber is
the only pressurized segment of the
TBM. Within the shield, the working
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
chamber consists of two sections: the
staging chamber and the forward
working chamber. The staging chamber
is the section of the working chamber
between the man-lock door and the
entry door to the forward working
chamber. The forward working chamber
is immediately behind the cutter head
and tunnel face.
McNally will pressurize the working
chamber to the level required to
maintain a stable tunnel face. Pressure
in the staging chamber ranges from
atmospheric (no increased pressure) to a
maximum pressure equal to the pressure
in the working chamber. The applicant
asserts that they may have to perform
interventions at pressures up to 55 p.s.i.
During interventions, workers enter
the working chamber through one of the
twin man-locks that open into the
staging chamber. To reach the forward
part of the working chamber, workers
pass through a door in a bulkhead that
separates the staging chamber from the
forward working chamber. The
maximum crew size allowed in the
forward working chamber is three. At
certain hyperbaric pressures (i.e., when
decompression times are greater than
work times), the twin man-locks allow
for crew rotation. During crew rotation,
one crew can be compressing or
decompressing while the second crew is
working. Therefore, the working crew
always has an unoccupied man-lock at
its disposal.
Further, the applicant asserts that it
has developed a project-specific HOM
(OSHA–2022–0007–0002) that describes
in detail the hyperbaric procedures, the
required medical examination used
during the tunnel-construction project,
the standard operating procedures and
the emergency and contingency
procedures. The procedures include
using experienced and knowledgeable
man-lock attendants who have the
training and experience necessary to
recognize and treat decompression
illnesses and injuries. The attendants
are under the direct supervision of the
hyperbaric supervisor and attending
physician. In addition, procedures
include medical screening and review of
prospective compressed-air workers
(CAWs). The purpose of this screening
procedure is to vet prospective CAWs
with medical conditions (e.g., deep vein
thrombosis, poor vascular circulation,
and muscle cramping) that could be
aggravated by sitting in a cramped space
(e.g., a man-lock) for extended periods,
or by exposure to elevated pressures and
compressed gas mixtures. A
transportable recompression chamber
(shuttle) is available to extract workers
from the hyperbaric working chamber
for emergency evacuation and medical
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
58381
treatment; the shuttle attaches to the
topside medical lock, which is a large
recompression chamber. The applicant
believes that the procedures included in
the HOM provide safe work conditions
when interventions are necessary,
including interventions above 50 p.s.i.g.
OSHA comprehensively reviewed the
project-specific HOM and determined
that the safety and health instructions
and measures it specifies are
appropriate, conform with the
conditions in the variance, and
adequately protect the safety and health
of the CAWs.
C. Variance From Paragraph (f)(1) of 29
CFR 1926.803, Requirement To Use
OSHA Decompression Tables
OSHA’s compressed-air standard for
construction requires decompression in
accordance with the decompression
tables in Appendix A of 29 CFR 1926,
subpart S (see 29 CFR 1926.803(f)(1)).
As an alternative to the OSHA
decompression tables, the applicant
proposes to use newer decompression
schedules (the 1992 French
Decompression Tables) that rely on
staged decompression and supplement
breathing air used during
decompression with air or oxygen (as
appropriate).3 The applicant asserts
decompression protocols using the 1992
French Decompression Tables for air or
oxygen as specified by the SST Projectspecific HOM are safer for tunnel
workers than the decompression
protocols specified in Appendix A of 29
CFR 1926, subpart S. Accordingly, the
applicant would commit to following
the decompression procedures
described in that HOM, which would
require it to follow the 1992 French
Decompression Tables to decompress
compressed-air worker (CAWs) after
they exit the hyperbaric conditions in
the working chamber.
Depending on the maximum working
pressure and exposure times, the 1992
French Decompression Tables provide
for air decompression with or without
oxygen. McNally asserts that oxygen
decompression has many benefits,
including (1) keeping the partial
pressure of nitrogen in the lungs as low
as possible; (2) keeping external
pressure as low as possible to reduce the
formation of bubbles in the blood; (3)
removing nitrogen from the lungs and
3 In 1992, the French Ministry of Labour replaced
the 1974 French Decompression Tables with the
1992 French Decompression Tables, which differ
from OSHA’s decompression tables in Appendix A
by using: (1) staged decompression as opposed to
continuous (linear) decompression; (2)
decompression tables based on air or both air and
pure oxygen; and (3) emergency tables when
unexpected exposure times occur (up to 30 minutes
above the maximum allowed working time).
E:\FR\FM\26SEN1.SGM
26SEN1
58382
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
arterial blood and increasing the rate of
nitrogen elimination; (4) improving the
quality of breathing during
decompression stops so that workers are
less tired and to prevent bone necrosis;
(5) reducing decompression time by
about 33 percent as compared to air
decompression; and (6) reducing
inflammation.
In addition, the project-specific HOM
requires a physician certified in
hyperbaric medicine to manage the
medical condition of CAWs during
hyperbaric exposures and
decompression. A trained and
experienced man-lock attendant is also
required to be present during hyperbaric
exposures and decompression. This
man-lock attendant is to operate the
hyperbaric system to ensure compliance
with the specified decompression table.
A hyperbaric supervisor (competent
person), who is trained in hyperbaric
operations, procedures, and safety,
directly oversees all hyperbaric
interventions, and ensures that staff
follow the procedures delineated in the
HOM or by the attending physician.
D. Variance From Paragraph (g)(1)(iii) of
29 CFR 1926.803, Automatically
Regulated Continuous Decompression
McNally is applying for a permanent
variance from the OSHA standard at 29
CFR 1926.803(g)(1)(iii), which requires
automatic controls to regulate
decompression. As noted above, the
applicant is committed to conducting
the staged decompression according to
the 1992 French Decompression Tables
under the direct control of the trained
man-lock attendant and under the
oversight of the hyperbaric supervisor.
Breathing air under hyperbaric
conditions increases the amount of
nitrogen gas dissolved in a CAW’s
tissues. The greater the hyperbaric
pressure under these conditions and the
more time spent under the increased
pressure, the greater the amount of
nitrogen gas dissolved in the tissues.
When the pressure decreases during
decompression, tissues release the
dissolved nitrogen gas into the blood
system, which then carries the nitrogen
gas to the lungs for elimination through
exhalation. Releasing hyperbaric
pressure too rapidly during
decompression can increase the size of
the bubbles formed by nitrogen gas in
the blood system, resulting in
decompression illness (DCI), commonly
referred to as ‘‘the bends.’’ This
description of the etiology of DCI is
consistent with current scientific theory
and research on the issue (see footnote
12 in this notice discussing a 1985
NIOSH report on DCI).
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
The 1992 French Decompression
Tables proposed for use by the applicant
provide for stops during worker
decompression (i.e., staged
decompression) to control the release of
nitrogen gas from tissues into the blood
system. Studies show that staged
decompression, in combination with
other features of the 1992 French
Decompression Tables such as the use
of oxygen, result in a lower incidence of
DCI than the use of automatically
regulated continuous decompression.4
In addition, the applicant asserts that
staged decompression administered in
accordance with its HOM is at least as
effective as an automatic controller in
regulating the decompression process
because the HOM includes a hyperbaric
supervisor (a competent person
experienced and trained in hyperbaric
operations, procedures, and safety) who
directly supervises all hyperbaric
interventions and ensures that the manlock attendant, who is a competent
person in the manual control of
hyperbaric systems, follows the
schedule specified in the
decompression tables, including stops.
E. Variance From Paragraph (g)(1)(xvii)
of 29 CFR 1926.803, Requirement of
Special Decompression Chamber
The OSHA compressed-air standard
for construction requires employers to
use a special decompression chamber of
sufficient size to accommodate all
CAWs being decompressed at the end of
the shift when total decompression time
exceeds 75 minutes (see 29 CFR
1926.803(g)(1)(xvii)). Use of the special
decompression chamber enables CAWs
4 See, e.g., Dr. Eric Kindwall, EP (1997),
Compressed air tunneling and caisson work
decompression procedures: development, problems,
and solutions. Undersea and Hyperbaric Medicine,
24(4), pp. 337–345. This article reported 60 treated
cases of DCI among 4,168 exposures between 19
and 31 p.s.i.g. over a 51-week contract period, for
a DCI incidence of 1.44 percent for the
decompression tables specified by the OSHA
standard. Dr. Kindwall notes that the use of
automatically regulated continuous decompression
in the Washington State safety standards for
compressed-air work (from which OSHA derived its
decompression tables) was at the insistence of
contractors and the union, and against the advice
of the expert who calculated the decompression
table and recommended using staged
decompression. Dr. Kindwall then states,
‘‘Continuous decompression is inefficient and
wasteful. For example, if the last stage from 4
p.s.i.g. . . . to the surface took 1h, at least half the
time is spent at pressures less than 2 p.s.i.g. . . .,
which provides less and less meaningful bubble
suppression. . . .’’ In addition, Dr. Kindwall
addresses the continuous-decompression protocol
in the OSHA compressed-air standard for
construction, noting that ‘‘[a]side from the tables for
saturation diving to deep depths, no other widely
used or officially approved diving decompression
tables use straight line, continuous decompressions
at varying rates. Stage decompression is usually the
rule, since it is simpler to control.’’
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
to move about and flex their joints to
prevent neuromuscular problems during
decompression.
Space limitations in the TBM do not
allow for the installation and use of an
additional special decompression lock
or chamber. The applicant proposes that
it be permitted to rely on the man-locks
and staging chamber in lieu of adding a
separate, special decompression
chamber. Because only a few workers
out of the entire crew are exposed to
hyperbaric pressure, the man-locks
(which, as noted earlier, connect
directly to the working chamber) and
the staging chamber are of sufficient size
to accommodate all of the exposed
workers during decompression. The
applicant uses the existing man-locks,
each of which adequately
accommodates a three-member crew for
this purpose when decompression lasts
up to 75 minutes. When decompression
exceeds 75 minutes, crews can open the
door connecting the two compartments
in each man-lock (during
decompression stops) or exit the manlock and move into the staging chamber
where additional space is available. The
applicant asserts that this alternative
arrangement is as effective as a special
decompression chamber in that it has
sufficient space for all the CAWs at the
end of a shift and enables the CAWs to
move about and flex their joints to
prevent neuromuscular problems.
III. Agency Preliminary Determinations
After reviewing the proposed
alternatives, OSHA has preliminarily
determined that the applicant’s
proposed alternatives on the whole,
subject to the conditions in the request
and imposed by this interim order,
provide measures that are as safe and
healthful as those required by the cited
OSHA standards addressed in section II
of this document.
In addition, OSHA has preliminarily
determined that each of the following
alternatives are at least as effective as
the specified OSHA requirements:
A. 29 CFR 1926.803(e)(5)
McNally has developed, and proposed
to implement, effective alternative
measures to the prohibition of using
compressed air under hyperbaric
conditions exceeding 50 p.s.i. The
proposed alternative measures include
use of engineering and administrative
controls of the hazards associated with
work performed in compressed-air
conditions exceeding 50 p.s.i. while
engage in the construction of a
subaqueous tunnel using advance
shielded mechanical-excavation
techniques in conjunction with the
TBM. Prior to conducting interventions
E:\FR\FM\26SEN1.SGM
26SEN1
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
in the TBM’s pressurized working
chamber, McNally halts tunnel
excavation and prepares the machine
and crew to conduct the interventions.
Interventions involve inspection,
maintenance, or repair of the
mechanical-excavation components
located in the working chamber.
B. 29 CFR 1926.803(f)(1)
McNally has proposed to implement,
equally effective alternative measures to
the requirement in 29 CFR
1926.803(f)(1) for compliance with
OSHA’s decompression tables. The
HOM specifies the procedures and
personnel qualifications for performing
work safely during the compression and
decompression phases of interventions.
The HOM also specifies the
decompression tables the applicant
proposes to use (the 1992 French
Decompression Tables). Depending on
the maximum working pressure and
exposure times during the interventions,
the tables provide for decompression
using air, pure oxygen, or a combination
of air and oxygen. The decompression
tables also include delays or stops for
various time intervals at different
pressure levels during the transition to
atmospheric pressure (i.e., staged
decompression). In all cases, a
physician certified in hyperbaric
medicine will manage the medical
condition of CAWs during
decompression. In addition, a trained
and experienced man-lock attendant,
experienced in recognizing
decompression sickness or illnesses and
injuries, will be present. Of key
importance, a hyperbaric supervisor
(competent person), trained in
hyperbaric operations, procedures, and
safety, will directly supervise all
hyperbaric operations to ensure
compliance with the procedures
delineated in the project-specific HOM
or by the attending physician.
As it did when granting the five
previous tunneling permanent variances
to IHP JV, Traylor JV, Tully JV SaliniImpregilo Joint Venture, and Ballard,
OSHA conducted a review of the
scientific literature and concluded that
the alternative decompression method
(i.e., the 1992 French Decompression
Tables) McNally proposed would be at
least as safe as the decompression tables
specified by OSHA when applied by
trained medical personnel under the
conditions that would be imposed by
the proposed variance.
Some of the literature even indicates
that it may be safer, concluding that
decompression performed in accordance
with these tables resulted in a lower
occurrence of DCI than decompression
conducted in accordance with the
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
decompression tables specified by the
standard. For example, H. L. Anderson
studied the occurrence of DCI at
maximum hyperbaric pressures ranging
from 4 p.s.i.g. to 43 p.s.i.g. during
construction of the Great Belt Tunnel in
Denmark (1992–1996).5 This project
used the 1992 French Decompression
Tables to decompress the workers
during part of the construction.
Anderson observed 6 DCI cases out of
7,220 decompression events, and
reported that switching to the 1992
French Decompression tables reduced
the DCI incidence to 0.08 percent
compared to a previous incidence rate
of 0.14 percent. The DCI incidence in
the study by H. L. Andersen is
substantially less than the DCI
incidence reported for the
decompression tables specified in
Appendix A.
OSHA found no studies in which the
DCI incidence reported for the 1992
French Decompression Tables were
higher than the DCI incidence reported
for the OSHA decompression tables.6
OSHA’s experience with the five
previous tunneling permanent
variances, which all incorporated nearly
identical decompression plans and did
not result in safety issues, also provide
evidence that the alternative procedure
as a whole is at least as effective for this
type of tunneling project as compliance
with OSHA’s decompression tables. The
experience of State Plans 7 that either
granted variances (Nevada, Oregon and
Washington) 8 or promulgated a new
standard (California) 9 for hyperbaric
exposures occurring during similar
subaqueous tunnel-construction work,
provide additional evidence of the
5 Anderson HL (2002). Decompression sickness
during construction of the Great Belt tunnel,
Denmark. Undersea and Hyperbaric Medicine,
29(3), pp. 172–188.
6 Le Pe
´ chon JC, Barre P, Baud JP, Ollivier F
(September 1996). Compressed air work—French
Tables 1992—operational results. JCLP Hyperbarie
Paris, Centre Medical Subaquatique Interentreprise,
Marseille: Communication a l’EUBS, pp. 1–5 (see
Ex. OSHA–2012–0036–0005).
7 Under Section 18 of the OSH Act, Congress
expressly provides that States and U.S. territories
may adopt, with Federal approval, a plan for the
development and enforcement of occupational
safety and health standards. OSHA refers to such
States and territories as ‘‘State Plan States’’
Occupational safety and health standards
developed by State Plan States must be at least as
effective in providing safe and healthful
employment and places of employment as the
Federal standards (29 U.S.C. 667).
8 These state variances are available in the docket
for the 2015 Traylor JV variance: Exs. OSHA–2012–
0035–0006 (Nevada), OSHA–2012–0035–0005
(Oregon), and OSHA–2012–0035–0004
(Washington).
9 See California Code of Regulations, Title 8,
Subchapter 7, Group 26, Article 154, available at
https://www.dir.ca.gov/title8/sb7g26a154.html.
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
58383
effectiveness of this alternative
procedure.
C. 29 CFR 1926.803(g)(1)(iii)
McNally developed, and proposed to
implement, an equally effective
alternative to 29 CFR 1926.803(g)(1)(iii),
which requires the use of automatic
controllers that continuously decrease
pressure to achieve decompression in
accordance with the tables specified by
the standard. The applicant’s alternative
includes using the 1992 French
Decompression Tables for guiding
staged decompression to achieve lower
occurrences of DCI, using a trained and
competent attendant for implementing
appropriate hyperbaric entry and exit
procedures, and providing a competent
hyperbaric supervisor and attending
physician certified in hyperbaric
medicine to oversee all hyperbaric
operations.
In reaching this preliminary
conclusion, OSHA again notes the
experience of previous nearly identical
tunneling variances, the experiences of
State Plan States, and a review of the
literature and other information noted
earlier.
D. 29 CFR 1926.803(g)(1)(xvii)
McNally developed, and proposed to
implement, an effective alternative to
the use of the special decompression
chamber required by 29 CFR
1926.803(g)(1)(xvii). The TBM’s manlock and working chamber appear to
satisfy all of the conditions of the
special decompression chamber,
including that they provide sufficient
space for the maximum crew of three
CAWs to stand up and move around,
and safely accommodate decompression
times up to 360 minutes. Therefore,
again noting OSHA’s previous
experience with nearly identical
tunneling variances including the same
alternative, OSHA preliminarily
determined that the TBM’s man-lock
and working chamber function as
effectively as the special decompression
chamber required by the standard.
Pursuant to section 6(d) of the
Occupational Safety and Health Act of
1970 (29 U.S.C. 655), and based on the
record discussed above, the agency
preliminarily finds that when the
employer complies with the conditions
of the previously granted interim order,
or the conditions of the proposed
variance, the working conditions of the
employer’s workers would be at least as
safe and healthful as if the employer
complied with the working conditions
specified by paragraphs (e)(5), (f)(1),
(g)(1)(iii), and (g)(1)(xvii) of 29 CFR
1926.803.
E:\FR\FM\26SEN1.SGM
26SEN1
58384
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
IV. Grant of Interim Order, Proposal for
Permanent Variance, and Request for
Comment
OSHA hereby announces the
preliminary decision to grant an interim
order allowing McNally’s CAWs to
perform interventions in hyperbaric
conditions not exceeding 55 p.s.i.g.
during the SST Project, subject to the
conditions that follow in this document.
This interim order will remain in effect
until completion of the SST Project or
until the agency modifies or revokes the
interim order or makes a decision on
McNally’s application for a permanent
variance. During the period starting
with the publication of this notice until
completion of the SST Project, or until
the agency modifies or revokes the
interim order or makes a decision on its
application for a permanent variance,
the applicant is required to comply fully
with the conditions of the interim order
as an alternative to complying with the
following requirements of 29 CFR
1926.803 (hereafter, ‘‘the standard’’)
that:
1. Prohibit Exposure to Pressure
Greater than 50 p.s.i. (29 CFR
1926.803(e)(5));
2. Require the use of decompression
values specified by the decompression
tables in Appendix A of the
compressed-air standard (29 CFR
1926.803(f)(1));
3. Require the use of automated
operational controls (29 CFR
1926.803(g)(1)(iii)); and
4. Require the use of a special
decompression chamber (29 CFR
1926.803(g)(1)(xvii)).
In order to avail itself of the interim
order, McNally must: (1) comply with
the conditions listed in the interim
order for the period starting with the
grant of the interim order and ending
with McNally’s completion of the SST
Project (or until the agency modifies or
revokes the interim order or makes a
decision on its application for a
permanent variance); (2) comply fully
with all other applicable provisions of
29 CFR part 1926; and (3) provide a
copy of this Federal Register notice to
all employees affected by the proposed
conditions, including the affected
employees of other employers, using the
same means it used to inform these
employees of its application for a
permanent variance.
OSHA is also proposing that the same
requirements (see above section III,
parts A through D) would apply to a
permanent variance if OSHA ultimately
issues one for this project. OSHA
requests comment on those conditions
as well as OSHA’s preliminary
determination that the specified
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
alternatives and conditions would
provide a workplace as safe and
healthful as those required by the
standard from which a variance is
sought. After reviewing comments,
OSHA will publish in the Federal
Register the agency’s final decision
approving or rejecting the request for a
permanent variance.
V. Description of the Specified
Conditions of the Interim Order and the
Application for a Permanent Variance
This section describes the alternative
means of compliance with 29 CFR
1926.803(e)(5),(f)(1), (g)(1)(iii), and
(g)(1)(xvii) and provides additional
detail regarding the proposed conditions
that form the basis of McNally’s
application for an interim order and for
a permanent variance. The conditions
are listed in Section VI. For brevity, the
discussion that follows refers only to the
permanent variance, but the same
conditions apply to the interim order.
Proposed Condition A: Scope
The scope of the proposed permanent
variance would limit coverage to the
work situations specified. Clearly
defining the scope of the proposed
permanent variance provides McNally,
McNally’s employees, potential future
applicants, other stakeholders, the
public, and OSHA with necessary
information regarding the work
situations in which the proposed
permanent variance would apply. To
the extent that McNally exceeds the
defined scope of this variance, it would
be required to comply with OSHA’s
standards.
Pursuant to 29 CFR 1905.11, an
employer (or class or group of
employers) 10 may request a permanent
variance for a specific workplace or
workplaces. If OSHA approves a
permanent variance, it would apply
only to the specific employer(s) that
submitted the application and only to
the specific workplace or workplaces
designated as part of the project. In this
instance, if OSHA were to grant a
permanent variance, it would apply to
only the applicant, McNally/Kiewit SST
Joint Venture and only the Shoreline
Storage Tunnel Project. As a result, it is
important to understand that if OSHA
were to grant McNally a permanent
variance, it would not apply to any
other employers, such as other joint
ventures the applicant may undertake in
the future. However, 29 CFR 1905.13
10 A class or group of employers (such as
members of a trade alliance or association) may
apply jointly for a Variance provided an authorized
representative for each employer signs the
application and the application identifies each
employer’s affected facilities.
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
contains provisions for future
modification of permanent variances to
add or include additional employers if
future joint ventures are established.
Proposed Condition B: Duration
The interim order is only intended as
a temporary measure pending OSHA’s
decision on the permanent variance, so
this condition specifies the duration of
the order. If OSHA approves a
permanent variance, it would specify
the duration of the permanent variance
as the remainder of the SST Project.
Proposed Condition C: List of
Abbreviations
Proposed condition C defines a
number of abbreviations used in the
proposed permanent variance. OSHA
believes that defining these
abbreviations serves to clarify and
standardize their usage, thereby
enhancing the applicant’s and its
employees’ understanding of the
conditions specified by the proposed
permanent variance.
Proposed Condition D: Definitions
The proposed condition defines a
series of terms, mostly technical terms,
used in the proposed permanent
variance to standardize and clarify their
meaning. OSHA believes that defining
these terms serves to enhance the
applicant’s and its employees’
understanding of the conditions
specified by the proposed permanent
variance.
Proposed Condition E: Safety and
Health Practices
This proposed condition requires the
applicant to develop and submit to
OSHA an HOM specific to the SST
Project at least six months before using
the TBM for tunneling operations. The
applicant must also submit, at least six
months before using the TBM, proof that
the TBM’s hyperbaric chambers have
been designed, fabricated, inspected,
tested, marked, and stamped in
accordance with the requirements of
ASME PVHO–1.2019 (or the most recent
edition of Safety Standards for Pressure
Vessels for Human Occupancy). These
requirements ensure that the applicant
develops hyperbaric safety and health
procedures suitable for the project.
The submission of the HOM to OSHA,
which McNally has already completed,
enables OSHA to determine whether the
safety and health instructions and
measures it specifies are appropriate to
the field conditions of the tunnel
(including expected geological
conditions), conform to the conditions
of the variance; and adequately protect
the safety and health of the CAWs. It
E:\FR\FM\26SEN1.SGM
26SEN1
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
also facilitates OSHA’s ability to ensure
that the applicant is complying with
these instructions and measures. The
requirement for proof of compliance
with ASME PVHO–1.2019 is intended
to ensure that the equipment is
structurally sound and capable of
performing to protect the safety of the
employees exposed to hyperbaric
pressure.
Additionally, the proposed condition
includes a series of related hazard
prevention and control requirements
and methods (e.g., decompression
tables, job hazard analyses (JHA),
operations and inspections checklists,
incident investigation, and recording
and notification to OSHA of recordable
hyperbaric injuries and illnesses)
designed to ensure the continued
effective functioning of the hyperbaric
equipment and operating system.
effects of hyperbaric exposure, thereby
preventing worker injury, illness, and
fatalities.
Paragraph (2)(e) of this proposed
condition requires the applicant to
provide affected workers with
information they can use to contact the
appropriate healthcare professionals if
the workers believe they are developing
hyperbaric-related health effects. This
requirement provides for early
intervention and treatment of DCI and
other health effects resulting from
hyperbaric exposure, thereby reducing
the potential severity of these effects.
Proposed Condition F: Communication
This proposed condition requires the
applicant to develop and implement an
effective system of information sharing
and communication. Effective
information sharing and communication
are intended to ensure that affected
workers receive updated information
regarding any safety-related hazards and
incidents, and corrective actions taken,
prior to the start of each shift. The
proposed condition also requires the
applicant to ensure that reliable means
of emergency communications are
available and maintained for affected
workers and support personnel during
hyperbaric operations. Availability of
such reliable means of communications
would enable affected workers and
support personnel to respond quickly
and effectively to hazardous conditions
or emergencies that may develop during
TBM operations.
Proposed Condition H: Inspections,
Tests, and Accident Prevention
Proposed Condition H requires the
applicant to develop, implement and
operate a program of frequent, and
regular inspections of the TBM’s
hyperbaric equipment and support
systems, and associated work areas.
This condition would help to ensure the
safe operation and physical integrity of
the equipment and work areas necessary
to conduct hyperbaric operations. The
condition would also enhance worker
safety by reducing the risk of
hyperbaric-related emergencies.
Paragraph (3) of this proposed
condition requires the applicant to
document tests, inspections, corrective
actions, and repairs involving the TBM,
and maintain these documents at the
jobsite for the duration of the job. This
requirement would provide the
applicant with information needed to
schedule tests and inspections to ensure
the continued safe operation of the
equipment and systems, and to
determine that the actions taken to
correct defects in hyperbaric equipment
and systems were appropriate, prior to
returning them to service.
Proposed Condition G: Worker
Qualification and Training
This proposed condition requires the
applicant to develop and implement an
effective qualification and training
program for affected workers. The
proposed condition specifies the factors
that an affected worker must know to
perform safely during hyperbaric
operations, including how to enter,
work in, and exit from hyperbaric
conditions under both normal and
emergency conditions. Having welltrained and qualified workers
performing hyperbaric intervention
work is intended to ensure that they
recognize, and respond appropriately to,
hyperbaric safety and health hazards.
These qualification and training
requirements enable affected workers to
cope effectively with emergencies, as
well as the discomfort and physiological
Proposed Condition I: Compression and
Decompression
This proposed condition would
require the applicant to consult with the
designated medical advisor regarding
special compression or decompression
procedures appropriate for any
unacclimated CAW and then implement
the procedures recommended by the
medical consultant. This proposed
provision would ensure that the
applicant consults with the medical
advisor, and involves the medical
advisor in the evaluation, development,
and implementation of compression or
decompression protocols appropriate for
any CAW requiring acclimation to the
hyperbaric conditions encountered
during TBM operations. Accordingly,
CAWs requiring acclimation would
have an opportunity to acclimate prior
to exposure to these hyperbaric
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
58385
conditions. OSHA believes this
condition would prevent or reduce
adverse reactions among CAWs to the
effects of compression or decompression
associated with the intervention work
they perform in the TBM.
Proposed Condition J: Recordkeeping
Under OSHA’s existing recordkeeping
requirements in 29 CFR part 1904
regarding Recording and Reporting
Occupational Injuries and Illnesses,
McNally must maintain a record of any
recordable injury, illness, or fatality (as
defined by 29 CFR part 1904) resulting
from exposure of an employee to
hyperbaric conditions by completing the
OSHA Form 301 Incident Report and
OSHA Form 300 Log of Work Related
Injuries and Illnesses. The applicant did
not seek a variance from this standard
and therefore must comply fully with
those requirements.
Examples of important information to
include on the OSHA Form 301 Injury
and Illness Incident Report (along with
the corresponding question on the form)
are:
Q14
• the task performed;
• the composition of the gas mixture
(e.g., air or oxygen);
• an estimate of the CAW’s workload;
• the maximum working pressure;
• temperature in the work and
decompression environments;
• unusual occurrences, if any, during
the task or decompression
Q15
• time of symptom onset;
• duration between decompression
and onset of symptoms
Q16
• type and duration of symptoms;
• a medical summary of the illness or
injury
Q17
• duration of the hyperbaric
intervention;
• possible contributing factors;
• the number of prior interventions
completed by the injured or ill CAW;
and the pressure to which the CAW was
exposed during those interventions. 11
Proposed Condition J would add
additional reporting responsibilities,
beyond those already required by the
11 See 29 CFR 1904 Recording and Reporting
Occupational Injuries and Illnesses (https://
www.osha.gov/pls/oshaweb/owadisp.show_
document?p_table=STANDARDS&p_id=9631);
recordkeeping forms and instructions (https://
www.osha.gov/recordkeeping/RKform300pkgfillable-enabled.pdf); and OSHA Recordkeeping
Handbook (https://www.osha.gov/recordkeeping/
handbook/).
E:\FR\FM\26SEN1.SGM
26SEN1
58386
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
OSHA standard. The applicant would
be required to maintain records of
specific factors associated with each
hyperbaric intervention. The
information gathered and recorded
under this provision, in concert with the
information provided under proposed
Condition K (using OSHA Form 301
Injury and Illness Incident Report to
investigate and record hyperbaric
recordable injuries as defined by 29 CFR
1904.4, 1904.7, 1904.8–1904.12), would
enable the applicant and OSHA to
assess the effectiveness of the
permanent variance in preventing DCI
and other hyperbaric-related effects.
Proposed Condition K: Notifications
Under the proposed condition, the
applicant is required, within specified
periods of time, to notify OSHA of: (1)
any recordable injury, illness, in-patient
hospitalization, amputation, loss of an
eye, or fatality that occurs as a result of
hyperbaric exposures during TBM
operations; (2) provide OSHA a copy of
the hyperbaric exposures incident
investigation report (using OSHA Form
301 Injury and Illness Incident Report)
of these events within 24 hours of the
incident; (3) include on OSHA Form
301 Injury and Illness Incident Report
information on the hyperbaric
conditions associated with the
recordable injury or illness, the rootcause determination, and preventive
and corrective actions identified and
implemented; (4) provide the
certification that affected workers were
informed of the incident and the results
of the incident investigation; (5) notify
OSHA’s Office of Technical Programs
and Coordination Activities (OTPCA)
and the Cleveland Ohio OSHA Area
Office within 15 working days should
the applicant need to revise the HOM to
accommodate changes in its
compressed-air operations that affect
McNally’s ability to comply with the
conditions of the proposed permanent
variance; and (6) provide OTPCA and
the Cleveland Ohio Area Office, at the
end of the project, with a report
evaluating the effectiveness of the
decompression tables.
It should be noted that the
requirement for completing and
submitting the hyperbaric exposurerelated (recordable) incident
investigation report (OSHA 301 Injury
and Illness Incident Report) is more
restrictive than the current
recordkeeping requirement of
completing OSHA Form 301 Injury and
Illness Incident Report within 7
calendar days of the incident
(1904.29(b)(3)). This modified, more
stringent incident investigation and
reporting requirement is restricted to
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
intervention-related hyperbaric
(recordable) incidents only. Providing
rapid notification to OSHA is essential
because time is a critical element in
OSHA’s ability to determine the
continued effectiveness of the variance
conditions in preventing hyperbaric
incidents, and the applicant’s
identification and implementation of
appropriate corrective and preventive
actions.
Further, these notification
requirements also enable the applicant,
its employees, and OSHA to assess the
effectiveness of the permanent variance
in providing the requisite level of safety
to the applicant’s workers and based on
this assessment, whether to revise or
revoke the conditions of the proposed
permanent variance. Timely notification
permits OSHA to take whatever action
may be necessary and appropriate to
prevent possible further injuries and
illnesses. Providing notification to
employees informs them of the
precautions taken by the applicant to
prevent similar incidents in the future.
Additionally, this proposed condition
requires the applicant to notify OSHA if
it ceases to do business, has a new
address or location for the main office,
or transfers the operations covered by
the proposed permanent variance to a
successor company. In addition, the
condition specifies that the transfer of
the permanent variance to a successor
company must be approved by OSHA.
These requirements allow OSHA to
communicate effectively with the
applicant regarding the status of the
proposed permanent variance, and
expedite the agency’s administration
and enforcement of the permanent
variance. Stipulating that an applicant is
required to have OSHA’s approval to
transfer a variance to a successor
company provides assurance that the
successor company has knowledge of,
and will comply with, the conditions
specified by proposed permanent
variance, thereby ensuring the safety of
workers involved in performing the
operations covered by the proposed
permanent variance.
VI. Specific Conditions of the Interim
Order and the Proposed Permanent
Variance
The following conditions apply to the
interim order OSHA is granting to
McNally/Kiewit SST Joint Venture for
the Shoreline Storage Tunnel Project.
These conditions specify the alternative
means of compliance with the
requirements of paragraphs 29 CFR
1926.803(e)(5), (f)(1), (g)(1)(iii), and
(g)(1)(xvii). In addition, these conditions
are specific to the alternative means of
compliance with the requirements of
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
paragraphs 29 CFR 1926.803 (e)(5),(f)(1),
(g)(1)(iii), and (g)(1)(xvii) that OSHA is
proposing for McNally’s permanent
variance. To simplify the presentation of
the conditions, OSHA generally refers
only to the conditions of the proposed
permanent variance, but the same
conditions apply to the interim order
except where otherwise noted.12
The conditions would apply with
respect to all employees of McNally
exposed to hyperbaric conditions. These
conditions are outlined in this Section:
A. Scope
The interim order applies, and the
permanent variance would apply, only
when McNally stops the tunnel-boring
work, pressurizes the working chamber,
and the CAWs either enter the working
chamber to perform an intervention (i.e.,
inspect, maintain, or repair the
mechanical-excavation components), or
exit the working chamber after
performing interventions.
The interim order and proposed
variance apply only to work:
1. That occurs in conjunction with
construction of the SST Project, a tunnel
constructed using advanced shielded
mechanical-excavation techniques and
involving operation of an TBM;
2. In the TBM’s forward section (the
working chamber) and associated
hyperbaric chambers used to pressurize
and decompress employees entering and
exiting the working chamber; and
3. Performed in compliance with all
applicable provisions of 29 CFR part
1926 except for the requirements
specified by 29 CFR
1926.803(e)(5),(f)(1), (g)(1)(iii), and
(g)(1)(xvii).
B. Duration
The interim order granted to McNally
will remain in effect until OSHA
modifies or revokes this interim order or
grants McNally’s request for a
permanent variance in accordance with
29 CFR 1905.13. The proposed
permanent variance, if granted, would
remain in effect until the completion of
McNally’s Shoreline Storage Tunnel
Project.
C. List of Abbreviations
Abbreviations used throughout this
proposed permanent variance would
include the following:
1. CAW—Compressed-air worker
2. CFR—Code of Federal Regulations
3. DCI—Decompression Illness
12 In these conditions, OSHA is using the future
conditional form of the verb (e.g., ‘‘would’’), which
pertains to the application for a permanent variance
(designated as ‘‘permanent variance’’) but the
conditions are mandatory for purposes of the
interim order.
E:\FR\FM\26SEN1.SGM
26SEN1
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
4. DMT—Diver Medical Technician
5. TBM—Tunnel Boring Machine
6. HOM—Hyperbaric Operations Manual
7. JHA—Job hazard analysis
8. OSHA—Occupational Safety and Health
Administration
9. OTPCA—Office of Technical Programs and
Coordination Activities
D. Definitions
The following definitions would
apply to this proposed permanent
variance. These definitions would
supplement the definitions in McNally’s
project-specific HOM.
1. Affected employee or worker—an
employee or worker who is affected by
the conditions of this proposed
permanent variance, or any one of his or
her authorized representatives. The term
‘‘employee’’ has the meaning defined
and used under the Occupational Safety
and Health Act of 1970 (29 U.S.C. 651
et seq.).
2. Atmospheric pressure—the
pressure of air at sea level, generally
14.7 pounds per square inch absolute
(p.s.i.a)., 1 atmosphere absolute, or 0
p.s.i.g.
3. Compressed-air worker—an
individual who is specially trained and
medically qualified to perform work in
a pressurized environment while
breathing air at pressures not exceeding
50 p.s.i.g.
4. Competent person—an individual
who is capable of identifying existing
and predictable hazards in the
surroundings or working conditions that
are unsanitary, hazardous, or dangerous
to employees, and who has
authorization to take prompt corrective
measures to eliminate them.13
5. Decompression illness—an illness
(also called decompression sickness or
‘‘the bends’’) caused by gas bubbles
appearing in body compartments due to
a reduction in ambient pressure.
Examples of symptoms of
decompression illness include, but are
not limited to: joint pain (also known as
the ‘‘bends’’ for agonizing pain or the
‘‘niggles’’ for slight pain); areas of bone
destruction (termed dysbaric
osteonecrosis); skin disorders (such as
cutis marmorata, which causes a pink
marbling of the skin); spinal cord and
brain disorders (such as stroke,
paralysis, paresthesia, and bladder
dysfunction); cardiopulmonary
disorders, such as shortness of breath;
and arterial gas embolism (gas bubbles
in the arteries that block blood flow).14
13 Adapted
from 29 CFR 1926.32(f).
Appendix 10 of ‘‘A Guide to the Work in
Compressed-Air Regulations 1996,’’ published by
the United Kingdom Health and Safety Executive
available from NIOSH at https://www.cdc.gov/niosh/
docket/archive/pdfs/NIOSH-254/compReg1996.pdf.
14 See
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
Note: Health effects associated with
hyperbaric intervention, but not
considered symptoms of DCI, can
include: barotrauma (direct damage to
air-containing cavities in the body such
as ears, sinuses, and lungs); nitrogen
narcosis (reversible alteration in
consciousness that may occur in
hyperbaric environments and is caused
by the anesthetic effect of certain gases
at high pressure); and oxygen toxicity (a
central nervous system condition
resulting from the harmful effects of
breathing molecular oxygen (O2) at
elevated partial pressures).
6. Diver Medical Technician—
Member of the dive team who is
experienced in first aid.
7. Earth Pressure Balanced Micro
Tunnel Boring Machine—the machinery
used to excavate a tunnel.
8. Hot work—any activity performed
in a hazardous location that may
introduce an ignition source into a
potentially flammable atmosphere.15
9. Hyperbaric—at a higher pressure
than atmospheric pressure.
10. Hyperbaric intervention—a term
that describes the process of stopping
the TBM and preparing and executing
work under hyperbaric pressure in the
working chamber for the purpose of
inspecting, replacing, or repairing
cutting tools and/or the cutterhead
structure.
11. Hyperbaric Operations Manual—a
detailed, project-specific health and
safety plan developed and implemented
by McNally for working in compressed
air during the SST Project.
12. Job hazard analysis—an
evaluation of tasks or operations to
identify potential hazards and to
determine the necessary controls.
13. Man-lock—an enclosed space
capable of pressurization and used for
compressing or decompressing any
employee or material when either is
passing into, or out of, a working
chamber.
14. Pressure—a force acting on a unit
area. Usually expressed as pounds per
square inch (p.s.i.).
15. p.s.i.a.—pounds per square inch
absolute, or absolute pressure, is the
sum of the atmospheric pressure and
gauge pressure. At sea-level,
atmospheric pressure is approximately
14.7 p.s.i.a. Adding 14.7 to a pressure
expressed in units of p.s.i.g. will yield
the absolute pressure, expressed as
p.s.i.a.
16. p.s.i.g.—pounds per square inch
gauge, a common unit of pressure;
pressure expressed as p.s.i.g.
corresponds to pressure relative to
atmospheric pressure. At sea-level,
15 Also
PO 00000
see 29 CFR 1910.146(b).
Frm 00080
Fmt 4703
Sfmt 4703
58387
atmospheric pressure is approximately
14.7 p.s.i.a Subtracting 14.7 from a
pressure expressed in units of p.s.i.a.
yields the gauge pressure, expressed as
p.s.i.g. At sea level the gauge pressure
is 0 psig.
17. Qualified person—an individual
who, by possession of a recognized
degree, certificate, or professional
standing, or who, by extensive
knowledge, training, and experience,
successfully demonstrates an ability to
solve or resolve problems relating to the
subject matter, the work, or the
project.16
18. Working chamber—an enclosed
space in the TBM in which CAWs
perform interventions, and which is
accessible only through a man-lock.
E. Safety and Health Practices
1. McNally would have to adhere to
the project-specific HOM submitted to
OSHA as part of the application (see
OSHA–2022–0007–0002). The HOM
provides the minimum requirements
regarding expected safety and health
hazards (including anticipated
geological conditions) and hyperbaric
exposures during the tunnelconstruction project.
2. McNally would have to
demonstrate that the TBM on the project
is designed, fabricated, inspected,
tested, marked, and stamped in
accordance with the requirements of
ASME PVHO–1.2019 (or most recent
edition of Safety Standards for Pressure
Vessels for Human Occupancy) for the
TBM’s hyperbaric chambers.
3. McNally would have to implement
the safety and health instructions
included in the manufacturer’s
operations manuals for the TBM, and
the safety and health instructions
provided by the manufacturer for the
operation of decompression equipment.
4. McNally would have to ensure that
there are no exposures to pressures
greater than 55 p.s.i.g.
5. McNally would have to ensure that
air or oxygen is the only breathing gas
in the working chamber.
6. McNally would have to follow the
1992 French Decompression Tables for
air or oxygen decompression as
specified in the HOM; specifically, the
extracted portions of the 1992 French
Decompression tables titled, ‘‘French
Regulation Air Standard Tables.’’
7. McNally would have to equip manlocks used by employees with an air or
oxygen delivery system, as specified by
the HOM, for the project. McNally
would be required not to store in the
tunnel any oxygen or other compressed
16 Adapted
E:\FR\FM\26SEN1.SGM
from 29 CFR 1926.32(m).
26SEN1
58388
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
gases used in conjunction with
hyperbaric work.
8. Workers performing hot work
under hyperbaric conditions would
have to use flame-retardant personal
protective equipment and clothing.
9. In hyperbaric work areas, McNally
would have to maintain an adequate
fire-suppression system approved for
hyperbaric work areas.
10. McNally would have to develop
and implement one or more Job Hazard
Analysis (JHA) for work in the
hyperbaric work areas, and review,
periodically and as necessary (e.g., after
making changes to a planned
intervention that affects its operation),
the contents of the JHAs with affected
employees. The JHAs would have to
include all the job functions that the
risk assessment 17 indicates are essential
to prevent injury or illness.
11. McNally would have to develop a
set of checklists to guide compressed-air
work and ensure that employees follow
the procedures required by the proposed
permanent variance and this interim
order (including all procedures required
by the HOM approved by OSHA for the
project, which this proposed variance
would incorporate by reference). The
checklists would have to include all
steps and equipment functions that the
risk assessment indicates are essential to
prevent injury or illness during
compressed-air work.
McNally would have to ensure that
the safety and health provisions of this
project-specific HOM adequately protect
the workers of all contractors and
subcontractors involved in hyperbaric
operations for the project to which the
HOM applies.
F. Communication
McNally would have to:
1. Prior to beginning a shift,
implement a system that informs
workers exposed to hyperbaric
conditions of any hazardous
occurrences or conditions that might
affect their safety, including hyperbaric
incidents, gas releases, equipment
failures, earth or rock slides, cave-ins,
flooding, fires, or explosions.
2. Provide a power-assisted means of
communication among affected workers
and support personnel in hyperbaric
conditions where unassisted voice
communication is inadequate.
(a) Use an independent power supply
for powered communication systems,
and these systems would have to
operate such that use or disruption of
any one phone or signal location will
17 See ANSI/AIHA Z10–2012, American National
Standard for Occupational Health and Safety
Management Systems, for reference.
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
not disrupt the operation of the system
from any other location.
(b) Test communication systems at the
start of each shift and as necessary
thereafter to ensure proper operation.
G. Worker Qualifications and Training
McNally would have to:
1. Ensure that each affected worker
receives effective training on how to
safely enter, work in, exit from, and
undertake emergency evacuation or
rescue from, hyperbaric conditions, and
document this training.
2. Provide effective instruction on
hyperbaric conditions, before beginning
hyperbaric operations, to each worker
who performs work, or controls the
exposure of others, and document this
instruction. The instruction would need
to include:
(a) The physics and physiology of
hyperbaric work;
(b) Recognition of pressure-related
injuries;
(c) Information on the causes and
recognition of the signs and symptoms
associated with decompression illness,
and other hyperbaric interventionrelated health effects (e.g., barotrauma,
nitrogen narcosis, and oxygen toxicity);
(d) How to avoid discomfort during
compression and decompression;
(e) Information the workers can use to
contact the appropriate healthcare
professionals should the workers have
concerns that they may be experiencing
adverse health effects from hyperbaric
exposure; and
(f) Procedures and requirements
applicable to the employee in the
project-specific HOM.
3. Repeat the instruction specified in
paragraph (G)(2)(b) of this proposed
condition periodically and as necessary
(e.g., after making changes to its
hyperbaric operations).
4. When conducting training for its
hyperbaric workers, make this training
available to OSHA personnel and notify
the OTPCA at OSHA’s National Office
and OSHA’s nearest affected Area Office
before the training takes place.
H. Inspections, Tests, and Accident
Prevention
1. McNally would have to initiate and
maintain a program of frequent and
regular inspections of the TBM’s
hyperbaric equipment and support
systems (such as temperature control,
illumination, ventilation, and fireprevention and fire-suppression
systems), and hyperbaric work areas, as
required under 29 CFR 1926.20(b)(2),
including:
(a) Developing a set of checklists to be
used by a competent person in
conducting weekly inspections of
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
hyperbaric equipment and work areas;
and
(b) Ensuring that a competent person
conducts daily visual checks and
weekly inspections of the TBM.
2. Remove from service any
equipment that constitutes a safety
hazard until it corrects the hazardous
condition and has the correction
approved by a qualified person.
3. McNally would have to maintain
records of all tests and inspections of
the TBM, as well as associated
corrective actions and repairs, at the job
site for the duration of the job.
I. Compression and Decompression
McNally would have to consult with
its attending physician concerning the
need for special compression or
decompression exposures appropriate
for CAWs not acclimated to hyperbaric
exposure.
J. Recordkeeping
In addition to completing OSHA Form
301 Injury and Illness Incident Report
and OSHA Form 300 Log of WorkRelated Injuries and Illnesses, McNally
would have to maintain records of:
1. The date, times (e.g., time
compression started, time spent
compressing, time performing
intervention, time spent
decompressing), and pressure for each
hyperbaric intervention.
2. The names of all supervisors and
DMTs involved for each intervention.
3. The name of each individual
worker exposed to hyperbaric pressure
and the decompression protocols and
results for each worker.
4. The total number of interventions
and the amount of hyperbaric work time
at each pressure.
5. The results of the post-intervention
physical assessment of each CAW for
signs and symptoms of decompression
illness, barotrauma, nitrogen narcosis,
oxygen toxicity or other health effects
associated with work in compressed air
for each hyperbaric intervention.
K. Notifications
1. To assist OSHA in administering
the conditions specified herein,
McNally would have to:
(a) Notify the OTPCA and the
Cleveland, Ohio Area Office of any
recordable injury, illness, or fatality (by
submitting the completed OSHA Form
301 Injuries and Illness Incident
Report) 18 resulting from exposure of an
employee to hyperbaric conditions,
including those that do not require
recompression treatment (e.g., nitrogen
narcosis, oxygen toxicity, barotrauma),
18 See
E:\FR\FM\26SEN1.SGM
footnote 12.
26SEN1
Federal Register / Vol. 87, No. 185 / Monday, September 26, 2022 / Notices
but still meet the recordable injury or
illness criteria of 29 CFR 1904. The
notification would have to be made
within 8 hours of the incident or 8
hours after becoming aware of a
recordable injury, illness, or fatality; a
copy of the incident investigation
(OSHA Form 301 Injuries and Illness
Incident Report) must be submitted to
OSHA within 24 hours of the incident
or 24 hours after becoming aware of a
recordable injury, illness, or fatality. In
addition to the information required by
OSHA Form 301 Injuries and Illness
Incident Report, the incidentinvestigation report would have to
include a root-cause determination, and
the preventive and corrective actions
identified and implemented.
(b) Provide certification to the
Cleveland Ohio Area Office within 15
working days of the incident that
McNally informed affected workers of
the incident and the results of the
incident investigation (including the
root-cause determination and preventive
and corrective actions identified and
implemented).
(c) Notify the OTPCA and the
Cleveland Ohio Area Office within 15
working days and in writing, of any
change in the compressed-air operations
that affects McNally’s ability to comply
with the proposed conditions specified
herein.
(d) Upon completion of the SST
Project, evaluate the effectiveness of the
decompression tables used throughout
the project, and provide a written report
of this evaluation to the OTPCA and the
Cleveland Ohio Area Office.
Note: The evaluation report would
have to contain summaries of: (1) The
number, dates, durations, and pressures
of the hyperbaric interventions
completed; (2) decompression protocols
implemented (including composition of
gas mixtures (air and/or oxygen), and
the results achieved; (3) the total
number of interventions and the number
of hyperbaric incidents (decompression
illnesses and/or health effects associated
with hyperbaric interventions as
recorded on OSHA Form 301 Injuries
and Illness Incident Report and OSHA
Form 300 Log of Work-Related Injuries
and Illnesses, and relevant medical
diagnoses, and treating physicians’
opinions); and (4) root causes of any
hyperbaric incidents, and preventive
and corrective actions identified and
implemented.
(e) To assist OSHA in administering
the proposed conditions specified
herein, inform the OTPCA and the
Cleveland Ohio Area Office as soon as
possible, but no later than seven (7)
days, after it has knowledge that it will:
(i) Cease doing business;
VerDate Sep<11>2014
16:43 Sep 23, 2022
Jkt 256001
(ii) Change the location and address of
the main office for managing the
tunneling operations specified herein;
or
(iii) Transfer the operations specified
herein to a successor company.
(f) Notify all affected employees of
this proposed permanent variance by
the same means required to inform them
of its application for a Variance.
2. OSHA would have to approve the
transfer of the proposed permanent
variance to a successor company
through a new application for a
modified variance.
VII. Authority and Signature
James S. Frederick, Deputy Assistant
Secretary of Labor for Occupational
Safety and Health, 200 Constitution
Avenue NW, Washington, DC 20210,
authorized the preparation of this
notice. Accordingly, the agency is
issuing this notice pursuant to 29 U.S.C.
655(d), Secretary of Labor’s Order No.
8–2020 (85 FR 58393, Sept. 18, 2020),
and 29 CFR 1905.11.
Signed at Washington, DC, on September
16, 2022.
James S. Frederick,
Deputy Assistant Secretary of Labor for
Occupational Safety and Health.
[FR Doc. 2022–20782 Filed 9–23–22; 8:45 am]
BILLING CODE 4510–26–P
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
[Notice: (22–073)]
NASA Astrophysics Advisory
Committee; Meeting
National Aeronautics and
Space Administration.
ACTION: Notice of meeting.
AGENCY:
In accordance with the
Federal Advisory Committee Act, as
amended, the National Aeronautics and
Space Administration (NASA)
announces a meeting of the
Astrophysics Advisory Committee. This
Committee reports to the Director,
Astrophysics Division, Science Mission
Directorate, NASA Headquarters. The
meeting will be held for the purpose of
soliciting, from the scientific
community and other persons, scientific
and technical information relevant to
program planning.
DATES: Monday, October 17, 2022, 9
a.m.–5 p.m., Tuesday, October 18, 2022,
9 a.m.–2 p.m., Eastern Time.
ADDRESSES: Due to current COVID–19
issues affecting NASA Headquarters
occupancy, public attendance will be
virtual only. See dial-in and Webex
SUMMARY:
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
58389
information below under
SUPPLEMENTARY INFORMATION.
Mrs.
KarShelia Kinard, Science Mission
Directorate, NASA Headquarters,
Washington, DC 20546, (202) 358–2355,
or karshelia.kinard@nasa.gov.
SUPPLEMENTARY INFORMATION: As noted
above, this meeting is virtual and will
take place telephonically and via
Webex. Any interested person must use
a touch-tone phone to participate in this
meeting. The Webex connectivity
information for each day is provided
below. For audio, when you join the
Webex event, you may use your
computer or provide your phone
number to receive a call back,
otherwise, call the U.S. toll conference
number listed for each day.
On Monday, October 17, the event
address for attendees is: https://
nasaenterprise.webex.com/
nasaenterprise/j.php?MTID=
mf79f5e8c2ce522a05c560caf505da802,
the meeting number is 2762 536 1104,
and meeting password is Apac1017#.
To join by telephone, the toll numbers
are: 1–415–527–5035 or 1–929–251–
9612. Access code: 2762 536 1104.
On Tuesday, October 18, the event
address for attendees is: https://
nasaenterprise.webex.com/
nasaenterprise/j.php?MTID=
m4de95daff639b0f4a500e61234f9cacf,
the meeting number is 2760 445 9382,
and meeting password is Apac1018#.
To join by telephone, the toll numbers
are: 1–415–527–5035 or 1–929–251–
9612. Access code: 2760 445 9382.
The agenda for the meeting includes
the following topics:
—Astrophysics Division Update
—Updates on Specific Astrophysics
Missions
—Reports from the Program Analysis
Groups
The agenda will be posted on the
Astrophysics Advisory Committee web
page: https://science.nasa.gov/
researchers/nac/science-advisorycommittees/apac.
The public may submit and upvote
comments/questions ahead of the
meeting through the website https://
forms.office.com/g/UYWeGpuawe that
will be opened for input on October 7,
2022.
It is imperative that the meeting be
held on this date to accommodate the
scheduling priorities of the key
participants.
FOR FURTHER INFORMATION CONTACT:
Carol Hamilton,
Acting Advisory Committee Management
Officer, National Aeronautics and Space
Administration.
[FR Doc. 2022–20806 Filed 9–23–22; 8:45 am]
BILLING CODE 7510–13–P
E:\FR\FM\26SEN1.SGM
26SEN1
Agencies
[Federal Register Volume 87, Number 185 (Monday, September 26, 2022)]
[Notices]
[Pages 58379-58389]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-20782]
[[Page 58379]]
-----------------------------------------------------------------------
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
[Docket No. OSHA-2022-0007]
McNally/Kiewit Shoreline Storage Tunnel Joint Venture;
Application for Permanent Variance and Interim Order; Grant of Interim
Order; Request for Comments
AGENCY: Occupational Safety and Health Administration (OSHA), Labor.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In this notice, OSHA announces the application of McNally/
Kiewit Shoreline Storage Tunnel (SST) Joint Venture for a permanent
variance and interim order from provisions of OSHA standards that
regulate work in compressed air environments and presents the agency's
preliminary finding on McNally/Kiewit's application and announces the
granting of an interim order. OSHA invites the public to submit
comments on the variance application to assist the agency in
determining whether to grant the applicant a permanent variance based
on the conditions specified in this application.
DATES: Submit comments, information, documents in response to this
notice, and request for a hearing on or before October 26, 2022. The
interim order described in this notice will become effective on
September 26, 2022, and shall remain in effect until the completion of
the SST project for Cleveland, Ohio or the interim order is modified or
revoked.
ADDRESSES:
Electronically: You may submit comments and attachments
electronically at: https://www.regulations.gov, which is the Federal
eRulemaking Portal. Follow the instructions online for submitting
comments.
Facsimile: If your comments, including attachments, are not longer
than 10 pages, you may fax them to the OSHA Docket Office at (202) 693-
1648.
Mail, hand delivery, express mail, messenger, or courier service:
When using this method, you must submit a copy of your comments and
attachments to the OSHA Docket Office, Docket No. OSHA-2022-0007,
Occupational Safety and Health Administration, U.S. Department of
Labor, Room N-3653, 200 Constitution Avenue NW, Washington, DC 20210.
Deliveries (hand, express mail, messenger, and courier service) are
accepted during the Docket Office's normal business hours, 10:00 a.m.
to 3:00 p.m., ET.
Instructions: All submissions must include the agency name and OSHA
docket number (OSHA-2022-0007). All comments, including any personal
information you provide, are placed in the public docket without
change, and may be made available online at https://www.regulations.gov.
Docket: To read or download comments or other material in the
docket, go to https://www.regulations.gov or the OSHA Docket Office at
the above address. All documents in the docket (including this Federal
Register notice) are listed in the https://www.regulations.gov index;
however, some information (e.g., copyrighted material) is not publicly
available to read or download through the website. All submissions,
including copyrighted material, are available for inspection at the
OSHA Docket Office. You may also contact Kevin Robinson, Director
Office of Technical Programs and Coordination Activities (OTPCA) at the
below address.
FOR FURTHER INFORMATION CONTACT: Information regarding this notice is
available from the following sources:
Press inquiries: Contact Mr. Frank Meilinger, Director, OSHA Office
of Communications, U.S. Department of Labor; telephone: (202) 693-1999;
email: [email protected].
General and technical information: Contact Mr. Kevin Robinson,
Director, Office of Technical Programs and Coordination Activities,
Directorate of Technical Support and Emergency Management, Occupational
Safety and Health Administration, U.S. Department of Labor; telephone:
(202) 693-2110; email: [email protected].
Copies of this Federal Register notice. Electronic copies of this
Federal Register notice are available at https://www.regulations.gov.
This Federal Register notice, as well as news releases and other
relevant information, also are available at OSHA's web page at https://www.osha.gov.
Hearing requests. According to 29 CFR 1905.15, hearing requests
must include: (1) a short and plain statement detailing how the
proposed Variance would affect the requesting party; (2) a
specification of any statement or representation in the Variance
application that the commenter denies, and a concise summary of the
evidence offered in support of each denial; and (3) any views or
arguments on any issue of fact or law presented in the variance
application.
SUPPLEMENTARY INFORMATION:
I. Notice of Application
OSHA's standards in subpart S of 29 CFR part 1926 govern
underground construction, caissons, cofferdams, and compressed air. On
November 12, 2021, McNally/Kiewit SST Joint Venture (``McNally'' or
``the applicant''), 800 Westpoint Parkway, Suite 1130, Westlake, Ohio
44145, submitted under Section 6(d) of the Occupational Safety and
Health Act of 1970 (OSH Act; 29 U.S.C. 655) and 29 CFR 1905.11
(variances and other relief under section 6(d)) an application for a
permanent variance from several provisions of the OSHA standard that
regulates work in compressed air, 1926.803 of 1926 Subpart S--
Underground Construction, Caissons, Cofferdams, and Compressed Air, and
an interim order allowing it to proceed while OSHA considers the
request for a permanent variance (OSHA-2022-0007-0001). This notice
addresses McNally's application for a permanent variance and interim
order for construction of the SST Project in Cleveland, Ohio, only and
is not applicable to future McNally or McNally-related joint venture
tunneling projects.
Specifically, this notice addresses McNally's application for a
permanent variance and interim order from the provisions of the
standard that: (1) prohibit compressed-air worker exposure to pressures
exceeding 50 pounds per square inch (p.s.i.) except in an emergency (29
CFR 1926.803(e)(5)); \1\ (2) require the use of the decompression
values specified in decompression tables in Appendix A of the
compressed-air standard for construction (29 CFR 1926.803(f)(1)); and
(3) require the use of automated operational controls and a special
decompression chamber (29 CFR 1926.803(g)(1)(iii) and .803(g)(1)(xvii),
respectively).
---------------------------------------------------------------------------
\1\ The decompression tables in Appendix A of subpart S express
the maximum working pressures as pounds per square inch gauge
(p.s.i.g.), with a maximum working pressure of 50 p.s.i.g.
Therefore, throughout this notice, OSHA expresses the 50 p.s.i.
value specified by 29 CFR 1926.803(e)(5) as 50 p.s.i.g., consistent
with the terminology in Appendix A, Table 1 of subpart S.
---------------------------------------------------------------------------
OSHA has previously approved nearly identical provisions when
granting several other very similar variances, as discussed in more
detail in Section II. OSHA preliminarily concludes that the proposed
variance is appropriate, grants an interim order temporarily allowing
the proposed activity, and seeks comment on the proposed variance.
[[Page 58380]]
Background
The applicant is a contractor that works on complex underground
tunnel projects using innovations in tunnel-excavation methods. The
applicant's workers engage in the construction of tunnels using
advanced shielded mechanical excavation techniques in conjunction with
an earth pressure balanced micro-tunnel boring machine (TBM). Using
shielded mechanical excavation techniques, in conjunction with precast
concrete tunnel liners and backfill grout, TBMs provide methods to
achieve the face pressures required to maintain a stabilized tunnel
face through various geologies, and isolate that pressure to the
forward section (the working chamber) of the TBM.
McNally asserts that generally it bores tunnels using an TBM at
levels below the water table through soft soils consisting of clay,
silt, and sand. TBMs are capable of maintaining pressure at the tunnel
face, and stabilizing existing geological conditions, through the
controlled use of a mechanically driven cutter head, bulkheads within
the shield, ground-treatment foam, and a screw conveyor that moves
excavated material from the working chamber. The forward-most portion
of the TBM is the working chamber, and this chamber is the only
pressurized segment of the TBM. Within the shield, the working chamber
consists of two sections: the forward working chamber and the staging
chamber. The forward working chamber is immediately behind the cutter
head and tunnel face. The staging chamber is behind the forward working
chamber and between the man-lock door, and the entry door to the
forward working chamber.
The TBM has twin man-locks located between the pressurized working
chamber and the non-pressurized portion of the machine. Each man-lock
has two compartments. This configuration allows workers to access the
man-locks for compression and decompression, and medical personnel to
access the man-locks if required in an emergency.
McNally's variance application indicated that the maximum pressure
to which it is likely to expose workers during project interventions
for the SST Project is 55 p.s.i. Therefore, to work effectively,
McNally must perform hyperbaric interventions in compressed air at
pressures 10 percent higher than the maximum pressure specified by the
existing OSHA standard, 29 CFR 1926.803(e)(5), which states: ``No
employee shall be subjected to pressure exceeding 50 p.s.i.g. except in
emergency'' (see footnote 1).
McNally employs specially trained personnel for the construction of
the tunnel. To keep the machinery working effectively, McNally asserts
that these workers must periodically enter the excavation working
chamber of the TBM to perform hyperbaric interventions during which
workers would be exposed to air pressures up to 55 p.s.i., which
exceeds the maximum pressure specified by the existing OSHA standard at
29 CFR 1926.803(e)(5). These interventions consist of conducting
inspections or maintenance work on the cutter-head structure and
cutting tools of the TBM, such as changing replaceable cutting tools
and disposable wear bars, and, in rare cases, repairing structural
damage to the cutter head. These interventions are the only time that
workers are exposed to compressed air. Interventions in the working
chamber (the pressurized portion of the TBM) take place only after
halting tunnel excavation and preparing the machine and crew for an
intervention.
During interventions, workers enter the working chamber through one
of the twin man-locks that open into the staging chamber. To reach the
forward part of the working chamber, workers pass through a door in a
bulkhead that separates the staging chamber from the forward working
chamber. The man-locks and the working chamber are designed to
accommodate three people, which is the maximum crew size allowed under
the proposed variance. When the required decompression times are
greater than work times, the twin man-locks allow for crew rotation.
During crew rotation, one crew can be compressing or decompressing
while the second crew is working. Therefore, the working crew always
has an unoccupied man-lock at its disposal.
McNally asserts that these innovations in tunnel excavation have
greatly reduced worker exposure to hazards of pressurized air work
because they have eliminated the need to pressurize the entire tunnel
for the project and would thereby reduce the number of workers exposed,
as well as the total duration of exposure, to hyperbaric pressure
during tunnel construction. These advances in technology substantially
modified the methods used by the construction industry to excavate
subaqueous tunnels compared to caisson work.
In addition to the reduced exposures resulting from the innovations
in tunnel-excavation methods, McNally asserts that innovations in
hyperbaric medicine and technology improve the safety of decompression
from hyperbaric exposures. These procedures, however, would deviate
from the decompression process that OSHA requires for construction in
29 CFR 1926.803(e)(5) and (f)(1) and the decompression tables in
Appendix A of 29 CFR 1926, subpart S. Nevertheless, according to
McNally, their use of decompression protocols incorporating oxygen is
more efficient, effective, and safer for tunnel workers than compliance
with the decompression tables specified by the existing OSHA standard.
McNally therefore believes its workers will be at least as safe
under its proposed alternatives as they would be under OSHA's standard
because of the reduction in number of workers and duration of
hyperbaric exposures, a better application of hyperbaric medicine, and
the development of a project-specific Hyperbaric Operations Manual
(HOM), (OSHA-2022-0007-0002) that requires specialized medical support
and hyperbaric supervision to provide assistance to a team of specially
trained man-lock attendants; and hyperbaric or compressed-air workers
(CAWs).
Based on an initial review of McNally's application for a permanent
variance and interim order for the construction of the SST Project in
Cleveland, Ohio, OSHA has preliminarily determined that McNally has
proposed an alternative that would provide a workplace at least as safe
and healthful as that provided by the standard.
II. The Variance Application
Pursuant to the requirements of OSHA's variance regulations (29 CFR
1905.11), the applicant has certified that it notified its workers \2\
of the variance application and request for interim order by posting,
at prominent locations where it normally posts workplace notices, a
summary of the application and information specifying where the workers
can examine a copy of the application. In addition, the applicant
informed its workers and their representatives of their rights to
petition the Assistant Secretary of Labor for Occupational Safety and
Health for a hearing on the variance application.
---------------------------------------------------------------------------
\2\ See the definition of ``Affected employee or worker'' in
section V.D of this Notice.
---------------------------------------------------------------------------
A. OSHA History of Approval of Nearly Identical Variance Requests
OSHA has previously approved several nearly identical variances
involving the same types of tunneling equipment used for similar
projects. OSHA notes that it granted five subaqueous tunnel
construction permanent variances from the same
[[Page 58381]]
provisions of OSHA's compressed-air standard (29 CFR
1926.803(e)(5),(f)(1), (g)(1)(iii), and (g)(1)(xvii)) that are the
subject of the present application: (1) Impregilo, Healy, Parsons,
Joint Venture (IHP JV) for the completion of the Anacostia River Tunnel
in Washington, DC (80 FR 50652 (August 20, 2015)); (2) Traylor JV for
the completion of the Blue Plains Tunnel in Washington, DC (80 FR
16440, March 27, 2015)); (3) Tully/OHL USA Joint Venture for the
completion of the New York Economic Development Corporation's New York
Siphon Tunnel project (79 FR 29809, May 23, 2014)); and (4) Salini-
Impregilo/Healy Joint Venture for the completion of the Northeast
Boundary Tunnel in Washington, DC (85 FR 27767, May 11, 2020). OSHA has
also granted interim orders to two applicants, Ballard Marine for the
Suffolk County Outfall Tunnel project in West Babylon, New York (86 FR
5253, January 19, 2021) and Traylor Shea Joint Venture for the
Alexandria RiverRenew Tunnel Project in Alexandria, Virginia and
Washington, DC (87 FR 54536, September 6, 2022). The proposed alternate
conditions in this notice are nearly identical to the alternate
conditions of the previous permanent variances. OSHA is not aware of
any injuries or other safety issues that arose from work performed
under these conditions in accordance with the previous variances.
B. Variance From Paragraph (e)(5) of 29 CFR 1926.803, Prohibition of
Exposure to Pressure Greater Than 50 p.s.i.g. (See Footnote 1)
The applicant states that it may perform hyperbaric interventions
at pressures up to 55 p.s.i.g. in the working chamber of the TBM; this
pressure exceeds the pressure limit of 50 p.s.i. specified for
nonemergency purposes by 29 CFR 1926.803(e)(5). The TBM has twin man-
locks, with each man-lock having two compartments. This configuration
allows workers to access the man-locks for compression and
decompression, and medical personnel to access the man-locks if
required in an emergency.
TBMs are capable of maintaining pressure at the tunnel face, and
stabilizing existing geological conditions, through the controlled use
of a mechanically driven cutter head, bulkheads within the shield,
ground-treatment foam, and a screw conveyor that moves excavated
material from the working chamber. As noted earlier, the forward-most
portion of the TBM is the working chamber, and this chamber is the only
pressurized segment of the TBM. Within the shield, the working chamber
consists of two sections: the staging chamber and the forward working
chamber. The staging chamber is the section of the working chamber
between the man-lock door and the entry door to the forward working
chamber. The forward working chamber is immediately behind the cutter
head and tunnel face.
McNally will pressurize the working chamber to the level required
to maintain a stable tunnel face. Pressure in the staging chamber
ranges from atmospheric (no increased pressure) to a maximum pressure
equal to the pressure in the working chamber. The applicant asserts
that they may have to perform interventions at pressures up to 55
p.s.i.
During interventions, workers enter the working chamber through one
of the twin man-locks that open into the staging chamber. To reach the
forward part of the working chamber, workers pass through a door in a
bulkhead that separates the staging chamber from the forward working
chamber. The maximum crew size allowed in the forward working chamber
is three. At certain hyperbaric pressures (i.e., when decompression
times are greater than work times), the twin man-locks allow for crew
rotation. During crew rotation, one crew can be compressing or
decompressing while the second crew is working. Therefore, the working
crew always has an unoccupied man-lock at its disposal.
Further, the applicant asserts that it has developed a project-
specific HOM (OSHA-2022-0007-0002) that describes in detail the
hyperbaric procedures, the required medical examination used during the
tunnel-construction project, the standard operating procedures and the
emergency and contingency procedures. The procedures include using
experienced and knowledgeable man-lock attendants who have the training
and experience necessary to recognize and treat decompression illnesses
and injuries. The attendants are under the direct supervision of the
hyperbaric supervisor and attending physician. In addition, procedures
include medical screening and review of prospective compressed-air
workers (CAWs). The purpose of this screening procedure is to vet
prospective CAWs with medical conditions (e.g., deep vein thrombosis,
poor vascular circulation, and muscle cramping) that could be
aggravated by sitting in a cramped space (e.g., a man-lock) for
extended periods, or by exposure to elevated pressures and compressed
gas mixtures. A transportable recompression chamber (shuttle) is
available to extract workers from the hyperbaric working chamber for
emergency evacuation and medical treatment; the shuttle attaches to the
topside medical lock, which is a large recompression chamber. The
applicant believes that the procedures included in the HOM provide safe
work conditions when interventions are necessary, including
interventions above 50 p.s.i.g.
OSHA comprehensively reviewed the project-specific HOM and
determined that the safety and health instructions and measures it
specifies are appropriate, conform with the conditions in the variance,
and adequately protect the safety and health of the CAWs.
C. Variance From Paragraph (f)(1) of 29 CFR 1926.803, Requirement To
Use OSHA Decompression Tables
OSHA's compressed-air standard for construction requires
decompression in accordance with the decompression tables in Appendix A
of 29 CFR 1926, subpart S (see 29 CFR 1926.803(f)(1)). As an
alternative to the OSHA decompression tables, the applicant proposes to
use newer decompression schedules (the 1992 French Decompression
Tables) that rely on staged decompression and supplement breathing air
used during decompression with air or oxygen (as appropriate).\3\ The
applicant asserts decompression protocols using the 1992 French
Decompression Tables for air or oxygen as specified by the SST Project-
specific HOM are safer for tunnel workers than the decompression
protocols specified in Appendix A of 29 CFR 1926, subpart S.
Accordingly, the applicant would commit to following the decompression
procedures described in that HOM, which would require it to follow the
1992 French Decompression Tables to decompress compressed-air worker
(CAWs) after they exit the hyperbaric conditions in the working
chamber.
---------------------------------------------------------------------------
\3\ In 1992, the French Ministry of Labour replaced the 1974
French Decompression Tables with the 1992 French Decompression
Tables, which differ from OSHA's decompression tables in Appendix A
by using: (1) staged decompression as opposed to continuous (linear)
decompression; (2) decompression tables based on air or both air and
pure oxygen; and (3) emergency tables when unexpected exposure times
occur (up to 30 minutes above the maximum allowed working time).
---------------------------------------------------------------------------
Depending on the maximum working pressure and exposure times, the
1992 French Decompression Tables provide for air decompression with or
without oxygen. McNally asserts that oxygen decompression has many
benefits, including (1) keeping the partial pressure of nitrogen in the
lungs as low as possible; (2) keeping external pressure as low as
possible to reduce the formation of bubbles in the blood; (3) removing
nitrogen from the lungs and
[[Page 58382]]
arterial blood and increasing the rate of nitrogen elimination; (4)
improving the quality of breathing during decompression stops so that
workers are less tired and to prevent bone necrosis; (5) reducing
decompression time by about 33 percent as compared to air
decompression; and (6) reducing inflammation.
In addition, the project-specific HOM requires a physician
certified in hyperbaric medicine to manage the medical condition of
CAWs during hyperbaric exposures and decompression. A trained and
experienced man-lock attendant is also required to be present during
hyperbaric exposures and decompression. This man-lock attendant is to
operate the hyperbaric system to ensure compliance with the specified
decompression table. A hyperbaric supervisor (competent person), who is
trained in hyperbaric operations, procedures, and safety, directly
oversees all hyperbaric interventions, and ensures that staff follow
the procedures delineated in the HOM or by the attending physician.
D. Variance From Paragraph (g)(1)(iii) of 29 CFR 1926.803,
Automatically Regulated Continuous Decompression
McNally is applying for a permanent variance from the OSHA standard
at 29 CFR 1926.803(g)(1)(iii), which requires automatic controls to
regulate decompression. As noted above, the applicant is committed to
conducting the staged decompression according to the 1992 French
Decompression Tables under the direct control of the trained man-lock
attendant and under the oversight of the hyperbaric supervisor.
Breathing air under hyperbaric conditions increases the amount of
nitrogen gas dissolved in a CAW's tissues. The greater the hyperbaric
pressure under these conditions and the more time spent under the
increased pressure, the greater the amount of nitrogen gas dissolved in
the tissues. When the pressure decreases during decompression, tissues
release the dissolved nitrogen gas into the blood system, which then
carries the nitrogen gas to the lungs for elimination through
exhalation. Releasing hyperbaric pressure too rapidly during
decompression can increase the size of the bubbles formed by nitrogen
gas in the blood system, resulting in decompression illness (DCI),
commonly referred to as ``the bends.'' This description of the etiology
of DCI is consistent with current scientific theory and research on the
issue (see footnote 12 in this notice discussing a 1985 NIOSH report on
DCI).
The 1992 French Decompression Tables proposed for use by the
applicant provide for stops during worker decompression (i.e., staged
decompression) to control the release of nitrogen gas from tissues into
the blood system. Studies show that staged decompression, in
combination with other features of the 1992 French Decompression Tables
such as the use of oxygen, result in a lower incidence of DCI than the
use of automatically regulated continuous decompression.\4\ In
addition, the applicant asserts that staged decompression administered
in accordance with its HOM is at least as effective as an automatic
controller in regulating the decompression process because the HOM
includes a hyperbaric supervisor (a competent person experienced and
trained in hyperbaric operations, procedures, and safety) who directly
supervises all hyperbaric interventions and ensures that the man-lock
attendant, who is a competent person in the manual control of
hyperbaric systems, follows the schedule specified in the decompression
tables, including stops.
---------------------------------------------------------------------------
\4\ See, e.g., Dr. Eric Kindwall, EP (1997), Compressed air
tunneling and caisson work decompression procedures: development,
problems, and solutions. Undersea and Hyperbaric Medicine, 24(4),
pp. 337-345. This article reported 60 treated cases of DCI among
4,168 exposures between 19 and 31 p.s.i.g. over a 51-week contract
period, for a DCI incidence of 1.44 percent for the decompression
tables specified by the OSHA standard. Dr. Kindwall notes that the
use of automatically regulated continuous decompression in the
Washington State safety standards for compressed-air work (from
which OSHA derived its decompression tables) was at the insistence
of contractors and the union, and against the advice of the expert
who calculated the decompression table and recommended using staged
decompression. Dr. Kindwall then states, ``Continuous decompression
is inefficient and wasteful. For example, if the last stage from 4
p.s.i.g. . . . to the surface took 1h, at least half the time is
spent at pressures less than 2 p.s.i.g. . . ., which provides less
and less meaningful bubble suppression. . . .'' In addition, Dr.
Kindwall addresses the continuous-decompression protocol in the OSHA
compressed-air standard for construction, noting that ``[a]side from
the tables for saturation diving to deep depths, no other widely
used or officially approved diving decompression tables use straight
line, continuous decompressions at varying rates. Stage
decompression is usually the rule, since it is simpler to control.''
---------------------------------------------------------------------------
E. Variance From Paragraph (g)(1)(xvii) of 29 CFR 1926.803, Requirement
of Special Decompression Chamber
The OSHA compressed-air standard for construction requires
employers to use a special decompression chamber of sufficient size to
accommodate all CAWs being decompressed at the end of the shift when
total decompression time exceeds 75 minutes (see 29 CFR
1926.803(g)(1)(xvii)). Use of the special decompression chamber enables
CAWs to move about and flex their joints to prevent neuromuscular
problems during decompression.
Space limitations in the TBM do not allow for the installation and
use of an additional special decompression lock or chamber. The
applicant proposes that it be permitted to rely on the man-locks and
staging chamber in lieu of adding a separate, special decompression
chamber. Because only a few workers out of the entire crew are exposed
to hyperbaric pressure, the man-locks (which, as noted earlier, connect
directly to the working chamber) and the staging chamber are of
sufficient size to accommodate all of the exposed workers during
decompression. The applicant uses the existing man-locks, each of which
adequately accommodates a three-member crew for this purpose when
decompression lasts up to 75 minutes. When decompression exceeds 75
minutes, crews can open the door connecting the two compartments in
each man-lock (during decompression stops) or exit the man-lock and
move into the staging chamber where additional space is available. The
applicant asserts that this alternative arrangement is as effective as
a special decompression chamber in that it has sufficient space for all
the CAWs at the end of a shift and enables the CAWs to move about and
flex their joints to prevent neuromuscular problems.
III. Agency Preliminary Determinations
After reviewing the proposed alternatives, OSHA has preliminarily
determined that the applicant's proposed alternatives on the whole,
subject to the conditions in the request and imposed by this interim
order, provide measures that are as safe and healthful as those
required by the cited OSHA standards addressed in section II of this
document.
In addition, OSHA has preliminarily determined that each of the
following alternatives are at least as effective as the specified OSHA
requirements:
A. 29 CFR 1926.803(e)(5)
McNally has developed, and proposed to implement, effective
alternative measures to the prohibition of using compressed air under
hyperbaric conditions exceeding 50 p.s.i. The proposed alternative
measures include use of engineering and administrative controls of the
hazards associated with work performed in compressed-air conditions
exceeding 50 p.s.i. while engage in the construction of a subaqueous
tunnel using advance shielded mechanical-excavation techniques in
conjunction with the TBM. Prior to conducting interventions
[[Page 58383]]
in the TBM's pressurized working chamber, McNally halts tunnel
excavation and prepares the machine and crew to conduct the
interventions. Interventions involve inspection, maintenance, or repair
of the mechanical-excavation components located in the working chamber.
B. 29 CFR 1926.803(f)(1)
McNally has proposed to implement, equally effective alternative
measures to the requirement in 29 CFR 1926.803(f)(1) for compliance
with OSHA's decompression tables. The HOM specifies the procedures and
personnel qualifications for performing work safely during the
compression and decompression phases of interventions. The HOM also
specifies the decompression tables the applicant proposes to use (the
1992 French Decompression Tables). Depending on the maximum working
pressure and exposure times during the interventions, the tables
provide for decompression using air, pure oxygen, or a combination of
air and oxygen. The decompression tables also include delays or stops
for various time intervals at different pressure levels during the
transition to atmospheric pressure (i.e., staged decompression). In all
cases, a physician certified in hyperbaric medicine will manage the
medical condition of CAWs during decompression. In addition, a trained
and experienced man-lock attendant, experienced in recognizing
decompression sickness or illnesses and injuries, will be present. Of
key importance, a hyperbaric supervisor (competent person), trained in
hyperbaric operations, procedures, and safety, will directly supervise
all hyperbaric operations to ensure compliance with the procedures
delineated in the project-specific HOM or by the attending physician.
As it did when granting the five previous tunneling permanent
variances to IHP JV, Traylor JV, Tully JV Salini-Impregilo Joint
Venture, and Ballard, OSHA conducted a review of the scientific
literature and concluded that the alternative decompression method
(i.e., the 1992 French Decompression Tables) McNally proposed would be
at least as safe as the decompression tables specified by OSHA when
applied by trained medical personnel under the conditions that would be
imposed by the proposed variance.
Some of the literature even indicates that it may be safer,
concluding that decompression performed in accordance with these tables
resulted in a lower occurrence of DCI than decompression conducted in
accordance with the decompression tables specified by the standard. For
example, H. L. Anderson studied the occurrence of DCI at maximum
hyperbaric pressures ranging from 4 p.s.i.g. to 43 p.s.i.g. during
construction of the Great Belt Tunnel in Denmark (1992-1996).\5\ This
project used the 1992 French Decompression Tables to decompress the
workers during part of the construction. Anderson observed 6 DCI cases
out of 7,220 decompression events, and reported that switching to the
1992 French Decompression tables reduced the DCI incidence to 0.08
percent compared to a previous incidence rate of 0.14 percent. The DCI
incidence in the study by H. L. Andersen is substantially less than the
DCI incidence reported for the decompression tables specified in
Appendix A.
---------------------------------------------------------------------------
\5\ Anderson HL (2002). Decompression sickness during
construction of the Great Belt tunnel, Denmark. Undersea and
Hyperbaric Medicine, 29(3), pp. 172-188.
---------------------------------------------------------------------------
OSHA found no studies in which the DCI incidence reported for the
1992 French Decompression Tables were higher than the DCI incidence
reported for the OSHA decompression tables.\6\
---------------------------------------------------------------------------
\6\ Le P[eacute]chon JC, Barre P, Baud JP, Ollivier F (September
1996). Compressed air work--French Tables 1992--operational results.
JCLP Hyperbarie Paris, Centre Medical Subaquatique Interentreprise,
Marseille: Communication a l'EUBS, pp. 1-5 (see Ex. OSHA-2012-0036-
0005).
---------------------------------------------------------------------------
OSHA's experience with the five previous tunneling permanent
variances, which all incorporated nearly identical decompression plans
and did not result in safety issues, also provide evidence that the
alternative procedure as a whole is at least as effective for this type
of tunneling project as compliance with OSHA's decompression tables.
The experience of State Plans \7\ that either granted variances
(Nevada, Oregon and Washington) \8\ or promulgated a new standard
(California) \9\ for hyperbaric exposures occurring during similar
subaqueous tunnel-construction work, provide additional evidence of the
effectiveness of this alternative procedure.
---------------------------------------------------------------------------
\7\ Under Section 18 of the OSH Act, Congress expressly provides
that States and U.S. territories may adopt, with Federal approval, a
plan for the development and enforcement of occupational safety and
health standards. OSHA refers to such States and territories as
``State Plan States'' Occupational safety and health standards
developed by State Plan States must be at least as effective in
providing safe and healthful employment and places of employment as
the Federal standards (29 U.S.C. 667).
\8\ These state variances are available in the docket for the
2015 Traylor JV variance: Exs. OSHA-2012-0035-0006 (Nevada), OSHA-
2012-0035-0005 (Oregon), and OSHA-2012-0035-0004 (Washington).
\9\ See California Code of Regulations, Title 8, Subchapter 7,
Group 26, Article 154, available at https://www.dir.ca.gov/title8/sb7g26a154.html.
---------------------------------------------------------------------------
C. 29 CFR 1926.803(g)(1)(iii)
McNally developed, and proposed to implement, an equally effective
alternative to 29 CFR 1926.803(g)(1)(iii), which requires the use of
automatic controllers that continuously decrease pressure to achieve
decompression in accordance with the tables specified by the standard.
The applicant's alternative includes using the 1992 French
Decompression Tables for guiding staged decompression to achieve lower
occurrences of DCI, using a trained and competent attendant for
implementing appropriate hyperbaric entry and exit procedures, and
providing a competent hyperbaric supervisor and attending physician
certified in hyperbaric medicine to oversee all hyperbaric operations.
In reaching this preliminary conclusion, OSHA again notes the
experience of previous nearly identical tunneling variances, the
experiences of State Plan States, and a review of the literature and
other information noted earlier.
D. 29 CFR 1926.803(g)(1)(xvii)
McNally developed, and proposed to implement, an effective
alternative to the use of the special decompression chamber required by
29 CFR 1926.803(g)(1)(xvii). The TBM's man-lock and working chamber
appear to satisfy all of the conditions of the special decompression
chamber, including that they provide sufficient space for the maximum
crew of three CAWs to stand up and move around, and safely accommodate
decompression times up to 360 minutes. Therefore, again noting OSHA's
previous experience with nearly identical tunneling variances including
the same alternative, OSHA preliminarily determined that the TBM's man-
lock and working chamber function as effectively as the special
decompression chamber required by the standard.
Pursuant to section 6(d) of the Occupational Safety and Health Act
of 1970 (29 U.S.C. 655), and based on the record discussed above, the
agency preliminarily finds that when the employer complies with the
conditions of the previously granted interim order, or the conditions
of the proposed variance, the working conditions of the employer's
workers would be at least as safe and healthful as if the employer
complied with the working conditions specified by paragraphs (e)(5),
(f)(1), (g)(1)(iii), and (g)(1)(xvii) of 29 CFR 1926.803.
[[Page 58384]]
IV. Grant of Interim Order, Proposal for Permanent Variance, and
Request for Comment
OSHA hereby announces the preliminary decision to grant an interim
order allowing McNally's CAWs to perform interventions in hyperbaric
conditions not exceeding 55 p.s.i.g. during the SST Project, subject to
the conditions that follow in this document. This interim order will
remain in effect until completion of the SST Project or until the
agency modifies or revokes the interim order or makes a decision on
McNally's application for a permanent variance. During the period
starting with the publication of this notice until completion of the
SST Project, or until the agency modifies or revokes the interim order
or makes a decision on its application for a permanent variance, the
applicant is required to comply fully with the conditions of the
interim order as an alternative to complying with the following
requirements of 29 CFR 1926.803 (hereafter, ``the standard'') that:
1. Prohibit Exposure to Pressure Greater than 50 p.s.i. (29 CFR
1926.803(e)(5));
2. Require the use of decompression values specified by the
decompression tables in Appendix A of the compressed-air standard (29
CFR 1926.803(f)(1));
3. Require the use of automated operational controls (29 CFR
1926.803(g)(1)(iii)); and
4. Require the use of a special decompression chamber (29 CFR
1926.803(g)(1)(xvii)).
In order to avail itself of the interim order, McNally must: (1)
comply with the conditions listed in the interim order for the period
starting with the grant of the interim order and ending with McNally's
completion of the SST Project (or until the agency modifies or revokes
the interim order or makes a decision on its application for a
permanent variance); (2) comply fully with all other applicable
provisions of 29 CFR part 1926; and (3) provide a copy of this Federal
Register notice to all employees affected by the proposed conditions,
including the affected employees of other employers, using the same
means it used to inform these employees of its application for a
permanent variance.
OSHA is also proposing that the same requirements (see above
section III, parts A through D) would apply to a permanent variance if
OSHA ultimately issues one for this project. OSHA requests comment on
those conditions as well as OSHA's preliminary determination that the
specified alternatives and conditions would provide a workplace as safe
and healthful as those required by the standard from which a variance
is sought. After reviewing comments, OSHA will publish in the Federal
Register the agency's final decision approving or rejecting the request
for a permanent variance.
V. Description of the Specified Conditions of the Interim Order and the
Application for a Permanent Variance
This section describes the alternative means of compliance with 29
CFR 1926.803(e)(5),(f)(1), (g)(1)(iii), and (g)(1)(xvii) and provides
additional detail regarding the proposed conditions that form the basis
of McNally's application for an interim order and for a permanent
variance. The conditions are listed in Section VI. For brevity, the
discussion that follows refers only to the permanent variance, but the
same conditions apply to the interim order.
Proposed Condition A: Scope
The scope of the proposed permanent variance would limit coverage
to the work situations specified. Clearly defining the scope of the
proposed permanent variance provides McNally, McNally's employees,
potential future applicants, other stakeholders, the public, and OSHA
with necessary information regarding the work situations in which the
proposed permanent variance would apply. To the extent that McNally
exceeds the defined scope of this variance, it would be required to
comply with OSHA's standards.
Pursuant to 29 CFR 1905.11, an employer (or class or group of
employers) \10\ may request a permanent variance for a specific
workplace or workplaces. If OSHA approves a permanent variance, it
would apply only to the specific employer(s) that submitted the
application and only to the specific workplace or workplaces designated
as part of the project. In this instance, if OSHA were to grant a
permanent variance, it would apply to only the applicant, McNally/
Kiewit SST Joint Venture and only the Shoreline Storage Tunnel Project.
As a result, it is important to understand that if OSHA were to grant
McNally a permanent variance, it would not apply to any other
employers, such as other joint ventures the applicant may undertake in
the future. However, 29 CFR 1905.13 contains provisions for future
modification of permanent variances to add or include additional
employers if future joint ventures are established.
---------------------------------------------------------------------------
\10\ A class or group of employers (such as members of a trade
alliance or association) may apply jointly for a Variance provided
an authorized representative for each employer signs the application
and the application identifies each employer's affected facilities.
---------------------------------------------------------------------------
Proposed Condition B: Duration
The interim order is only intended as a temporary measure pending
OSHA's decision on the permanent variance, so this condition specifies
the duration of the order. If OSHA approves a permanent variance, it
would specify the duration of the permanent variance as the remainder
of the SST Project.
Proposed Condition C: List of Abbreviations
Proposed condition C defines a number of abbreviations used in the
proposed permanent variance. OSHA believes that defining these
abbreviations serves to clarify and standardize their usage, thereby
enhancing the applicant's and its employees' understanding of the
conditions specified by the proposed permanent variance.
Proposed Condition D: Definitions
The proposed condition defines a series of terms, mostly technical
terms, used in the proposed permanent variance to standardize and
clarify their meaning. OSHA believes that defining these terms serves
to enhance the applicant's and its employees' understanding of the
conditions specified by the proposed permanent variance.
Proposed Condition E: Safety and Health Practices
This proposed condition requires the applicant to develop and
submit to OSHA an HOM specific to the SST Project at least six months
before using the TBM for tunneling operations. The applicant must also
submit, at least six months before using the TBM, proof that the TBM's
hyperbaric chambers have been designed, fabricated, inspected, tested,
marked, and stamped in accordance with the requirements of ASME PVHO-
1.2019 (or the most recent edition of Safety Standards for Pressure
Vessels for Human Occupancy). These requirements ensure that the
applicant develops hyperbaric safety and health procedures suitable for
the project.
The submission of the HOM to OSHA, which McNally has already
completed, enables OSHA to determine whether the safety and health
instructions and measures it specifies are appropriate to the field
conditions of the tunnel (including expected geological conditions),
conform to the conditions of the variance; and adequately protect the
safety and health of the CAWs. It
[[Page 58385]]
also facilitates OSHA's ability to ensure that the applicant is
complying with these instructions and measures. The requirement for
proof of compliance with ASME PVHO-1.2019 is intended to ensure that
the equipment is structurally sound and capable of performing to
protect the safety of the employees exposed to hyperbaric pressure.
Additionally, the proposed condition includes a series of related
hazard prevention and control requirements and methods (e.g.,
decompression tables, job hazard analyses (JHA), operations and
inspections checklists, incident investigation, and recording and
notification to OSHA of recordable hyperbaric injuries and illnesses)
designed to ensure the continued effective functioning of the
hyperbaric equipment and operating system.
Proposed Condition F: Communication
This proposed condition requires the applicant to develop and
implement an effective system of information sharing and communication.
Effective information sharing and communication are intended to ensure
that affected workers receive updated information regarding any safety-
related hazards and incidents, and corrective actions taken, prior to
the start of each shift. The proposed condition also requires the
applicant to ensure that reliable means of emergency communications are
available and maintained for affected workers and support personnel
during hyperbaric operations. Availability of such reliable means of
communications would enable affected workers and support personnel to
respond quickly and effectively to hazardous conditions or emergencies
that may develop during TBM operations.
Proposed Condition G: Worker Qualification and Training
This proposed condition requires the applicant to develop and
implement an effective qualification and training program for affected
workers. The proposed condition specifies the factors that an affected
worker must know to perform safely during hyperbaric operations,
including how to enter, work in, and exit from hyperbaric conditions
under both normal and emergency conditions. Having well-trained and
qualified workers performing hyperbaric intervention work is intended
to ensure that they recognize, and respond appropriately to, hyperbaric
safety and health hazards. These qualification and training
requirements enable affected workers to cope effectively with
emergencies, as well as the discomfort and physiological effects of
hyperbaric exposure, thereby preventing worker injury, illness, and
fatalities.
Paragraph (2)(e) of this proposed condition requires the applicant
to provide affected workers with information they can use to contact
the appropriate healthcare professionals if the workers believe they
are developing hyperbaric-related health effects. This requirement
provides for early intervention and treatment of DCI and other health
effects resulting from hyperbaric exposure, thereby reducing the
potential severity of these effects.
Proposed Condition H: Inspections, Tests, and Accident Prevention
Proposed Condition H requires the applicant to develop, implement
and operate a program of frequent, and regular inspections of the TBM's
hyperbaric equipment and support systems, and associated work areas.
This condition would help to ensure the safe operation and physical
integrity of the equipment and work areas necessary to conduct
hyperbaric operations. The condition would also enhance worker safety
by reducing the risk of hyperbaric-related emergencies.
Paragraph (3) of this proposed condition requires the applicant to
document tests, inspections, corrective actions, and repairs involving
the TBM, and maintain these documents at the jobsite for the duration
of the job. This requirement would provide the applicant with
information needed to schedule tests and inspections to ensure the
continued safe operation of the equipment and systems, and to determine
that the actions taken to correct defects in hyperbaric equipment and
systems were appropriate, prior to returning them to service.
Proposed Condition I: Compression and Decompression
This proposed condition would require the applicant to consult with
the designated medical advisor regarding special compression or
decompression procedures appropriate for any unacclimated CAW and then
implement the procedures recommended by the medical consultant. This
proposed provision would ensure that the applicant consults with the
medical advisor, and involves the medical advisor in the evaluation,
development, and implementation of compression or decompression
protocols appropriate for any CAW requiring acclimation to the
hyperbaric conditions encountered during TBM operations. Accordingly,
CAWs requiring acclimation would have an opportunity to acclimate prior
to exposure to these hyperbaric conditions. OSHA believes this
condition would prevent or reduce adverse reactions among CAWs to the
effects of compression or decompression associated with the
intervention work they perform in the TBM.
Proposed Condition J: Recordkeeping
Under OSHA's existing recordkeeping requirements in 29 CFR part
1904 regarding Recording and Reporting Occupational Injuries and
Illnesses, McNally must maintain a record of any recordable injury,
illness, or fatality (as defined by 29 CFR part 1904) resulting from
exposure of an employee to hyperbaric conditions by completing the OSHA
Form 301 Incident Report and OSHA Form 300 Log of Work Related Injuries
and Illnesses. The applicant did not seek a variance from this standard
and therefore must comply fully with those requirements.
Examples of important information to include on the OSHA Form 301
Injury and Illness Incident Report (along with the corresponding
question on the form) are:
Q14
the task performed;
the composition of the gas mixture (e.g., air or oxygen);
an estimate of the CAW's workload;
the maximum working pressure;
temperature in the work and decompression environments;
unusual occurrences, if any, during the task or
decompression
Q15
time of symptom onset;
duration between decompression and onset of symptoms
Q16
type and duration of symptoms;
a medical summary of the illness or injury
Q17
duration of the hyperbaric intervention;
possible contributing factors;
the number of prior interventions completed by the injured
or ill CAW; and the pressure to which the CAW was exposed during those
interventions. \11\
---------------------------------------------------------------------------
\11\ See 29 CFR 1904 Recording and Reporting Occupational
Injuries and Illnesses (https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9631); recordkeeping
forms and instructions (https://www.osha.gov/recordkeeping/RKform300pkg-fillable-enabled.pdf); and OSHA Recordkeeping Handbook
(https://www.osha.gov/recordkeeping/handbook/).
---------------------------------------------------------------------------
Proposed Condition J would add additional reporting
responsibilities, beyond those already required by the
[[Page 58386]]
OSHA standard. The applicant would be required to maintain records of
specific factors associated with each hyperbaric intervention. The
information gathered and recorded under this provision, in concert with
the information provided under proposed Condition K (using OSHA Form
301 Injury and Illness Incident Report to investigate and record
hyperbaric recordable injuries as defined by 29 CFR 1904.4, 1904.7,
1904.8-1904.12), would enable the applicant and OSHA to assess the
effectiveness of the permanent variance in preventing DCI and other
hyperbaric-related effects.
Proposed Condition K: Notifications
Under the proposed condition, the applicant is required, within
specified periods of time, to notify OSHA of: (1) any recordable
injury, illness, in-patient hospitalization, amputation, loss of an
eye, or fatality that occurs as a result of hyperbaric exposures during
TBM operations; (2) provide OSHA a copy of the hyperbaric exposures
incident investigation report (using OSHA Form 301 Injury and Illness
Incident Report) of these events within 24 hours of the incident; (3)
include on OSHA Form 301 Injury and Illness Incident Report information
on the hyperbaric conditions associated with the recordable injury or
illness, the root-cause determination, and preventive and corrective
actions identified and implemented; (4) provide the certification that
affected workers were informed of the incident and the results of the
incident investigation; (5) notify OSHA's Office of Technical Programs
and Coordination Activities (OTPCA) and the Cleveland Ohio OSHA Area
Office within 15 working days should the applicant need to revise the
HOM to accommodate changes in its compressed-air operations that affect
McNally's ability to comply with the conditions of the proposed
permanent variance; and (6) provide OTPCA and the Cleveland Ohio Area
Office, at the end of the project, with a report evaluating the
effectiveness of the decompression tables.
It should be noted that the requirement for completing and
submitting the hyperbaric exposure-related (recordable) incident
investigation report (OSHA 301 Injury and Illness Incident Report) is
more restrictive than the current recordkeeping requirement of
completing OSHA Form 301 Injury and Illness Incident Report within 7
calendar days of the incident (1904.29(b)(3)). This modified, more
stringent incident investigation and reporting requirement is
restricted to intervention-related hyperbaric (recordable) incidents
only. Providing rapid notification to OSHA is essential because time is
a critical element in OSHA's ability to determine the continued
effectiveness of the variance conditions in preventing hyperbaric
incidents, and the applicant's identification and implementation of
appropriate corrective and preventive actions.
Further, these notification requirements also enable the applicant,
its employees, and OSHA to assess the effectiveness of the permanent
variance in providing the requisite level of safety to the applicant's
workers and based on this assessment, whether to revise or revoke the
conditions of the proposed permanent variance. Timely notification
permits OSHA to take whatever action may be necessary and appropriate
to prevent possible further injuries and illnesses. Providing
notification to employees informs them of the precautions taken by the
applicant to prevent similar incidents in the future.
Additionally, this proposed condition requires the applicant to
notify OSHA if it ceases to do business, has a new address or location
for the main office, or transfers the operations covered by the
proposed permanent variance to a successor company. In addition, the
condition specifies that the transfer of the permanent variance to a
successor company must be approved by OSHA. These requirements allow
OSHA to communicate effectively with the applicant regarding the status
of the proposed permanent variance, and expedite the agency's
administration and enforcement of the permanent variance. Stipulating
that an applicant is required to have OSHA's approval to transfer a
variance to a successor company provides assurance that the successor
company has knowledge of, and will comply with, the conditions
specified by proposed permanent variance, thereby ensuring the safety
of workers involved in performing the operations covered by the
proposed permanent variance.
VI. Specific Conditions of the Interim Order and the Proposed Permanent
Variance
The following conditions apply to the interim order OSHA is
granting to McNally/Kiewit SST Joint Venture for the Shoreline Storage
Tunnel Project. These conditions specify the alternative means of
compliance with the requirements of paragraphs 29 CFR 1926.803(e)(5),
(f)(1), (g)(1)(iii), and (g)(1)(xvii). In addition, these conditions
are specific to the alternative means of compliance with the
requirements of paragraphs 29 CFR 1926.803 (e)(5),(f)(1), (g)(1)(iii),
and (g)(1)(xvii) that OSHA is proposing for McNally's permanent
variance. To simplify the presentation of the conditions, OSHA
generally refers only to the conditions of the proposed permanent
variance, but the same conditions apply to the interim order except
where otherwise noted.\12\
---------------------------------------------------------------------------
\12\ In these conditions, OSHA is using the future conditional
form of the verb (e.g., ``would''), which pertains to the
application for a permanent variance (designated as ``permanent
variance'') but the conditions are mandatory for purposes of the
interim order.
---------------------------------------------------------------------------
The conditions would apply with respect to all employees of McNally
exposed to hyperbaric conditions. These conditions are outlined in this
Section:
A. Scope
The interim order applies, and the permanent variance would apply,
only when McNally stops the tunnel-boring work, pressurizes the working
chamber, and the CAWs either enter the working chamber to perform an
intervention (i.e., inspect, maintain, or repair the mechanical-
excavation components), or exit the working chamber after performing
interventions.
The interim order and proposed variance apply only to work:
1. That occurs in conjunction with construction of the SST Project,
a tunnel constructed using advanced shielded mechanical-excavation
techniques and involving operation of an TBM;
2. In the TBM's forward section (the working chamber) and
associated hyperbaric chambers used to pressurize and decompress
employees entering and exiting the working chamber; and
3. Performed in compliance with all applicable provisions of 29 CFR
part 1926 except for the requirements specified by 29 CFR
1926.803(e)(5),(f)(1), (g)(1)(iii), and (g)(1)(xvii).
B. Duration
The interim order granted to McNally will remain in effect until
OSHA modifies or revokes this interim order or grants McNally's request
for a permanent variance in accordance with 29 CFR 1905.13. The
proposed permanent variance, if granted, would remain in effect until
the completion of McNally's Shoreline Storage Tunnel Project.
C. List of Abbreviations
Abbreviations used throughout this proposed permanent variance
would include the following:
1. CAW--Compressed-air worker
2. CFR--Code of Federal Regulations
3. DCI--Decompression Illness
[[Page 58387]]
4. DMT--Diver Medical Technician
5. TBM--Tunnel Boring Machine
6. HOM--Hyperbaric Operations Manual
7. JHA--Job hazard analysis
8. OSHA--Occupational Safety and Health Administration
9. OTPCA--Office of Technical Programs and Coordination Activities
D. Definitions
The following definitions would apply to this proposed permanent
variance. These definitions would supplement the definitions in
McNally's project-specific HOM.
1. Affected employee or worker--an employee or worker who is
affected by the conditions of this proposed permanent variance, or any
one of his or her authorized representatives. The term ``employee'' has
the meaning defined and used under the Occupational Safety and Health
Act of 1970 (29 U.S.C. 651 et seq.).
2. Atmospheric pressure--the pressure of air at sea level,
generally 14.7 pounds per square inch absolute (p.s.i.a)., 1 atmosphere
absolute, or 0 p.s.i.g.
3. Compressed-air worker--an individual who is specially trained
and medically qualified to perform work in a pressurized environment
while breathing air at pressures not exceeding 50 p.s.i.g.
4. Competent person--an individual who is capable of identifying
existing and predictable hazards in the surroundings or working
conditions that are unsanitary, hazardous, or dangerous to employees,
and who has authorization to take prompt corrective measures to
eliminate them.\13\
---------------------------------------------------------------------------
\13\ Adapted from 29 CFR 1926.32(f).
---------------------------------------------------------------------------
5. Decompression illness--an illness (also called decompression
sickness or ``the bends'') caused by gas bubbles appearing in body
compartments due to a reduction in ambient pressure. Examples of
symptoms of decompression illness include, but are not limited to:
joint pain (also known as the ``bends'' for agonizing pain or the
``niggles'' for slight pain); areas of bone destruction (termed
dysbaric osteonecrosis); skin disorders (such as cutis marmorata, which
causes a pink marbling of the skin); spinal cord and brain disorders
(such as stroke, paralysis, paresthesia, and bladder dysfunction);
cardiopulmonary disorders, such as shortness of breath; and arterial
gas embolism (gas bubbles in the arteries that block blood flow).\14\
---------------------------------------------------------------------------
\14\ See Appendix 10 of ``A Guide to the Work in Compressed-Air
Regulations 1996,'' published by the United Kingdom Health and
Safety Executive available from NIOSH at https://www.cdc.gov/niosh/docket/archive/pdfs/NIOSH-254/compReg1996.pdf.
---------------------------------------------------------------------------
Note: Health effects associated with hyperbaric intervention, but
not considered symptoms of DCI, can include: barotrauma (direct damage
to air-containing cavities in the body such as ears, sinuses, and
lungs); nitrogen narcosis (reversible alteration in consciousness that
may occur in hyperbaric environments and is caused by the anesthetic
effect of certain gases at high pressure); and oxygen toxicity (a
central nervous system condition resulting from the harmful effects of
breathing molecular oxygen (O2) at elevated partial
pressures).
6. Diver Medical Technician--Member of the dive team who is
experienced in first aid.
7. Earth Pressure Balanced Micro Tunnel Boring Machine--the
machinery used to excavate a tunnel.
8. Hot work--any activity performed in a hazardous location that
may introduce an ignition source into a potentially flammable
atmosphere.\15\
---------------------------------------------------------------------------
\15\ Also see 29 CFR 1910.146(b).
---------------------------------------------------------------------------
9. Hyperbaric--at a higher pressure than atmospheric pressure.
10. Hyperbaric intervention--a term that describes the process of
stopping the TBM and preparing and executing work under hyperbaric
pressure in the working chamber for the purpose of inspecting,
replacing, or repairing cutting tools and/or the cutterhead structure.
11. Hyperbaric Operations Manual--a detailed, project-specific
health and safety plan developed and implemented by McNally for working
in compressed air during the SST Project.
12. Job hazard analysis--an evaluation of tasks or operations to
identify potential hazards and to determine the necessary controls.
13. Man-lock--an enclosed space capable of pressurization and used
for compressing or decompressing any employee or material when either
is passing into, or out of, a working chamber.
14. Pressure--a force acting on a unit area. Usually expressed as
pounds per square inch (p.s.i.).
15. p.s.i.a.--pounds per square inch absolute, or absolute
pressure, is the sum of the atmospheric pressure and gauge pressure. At
sea-level, atmospheric pressure is approximately 14.7 p.s.i.a. Adding
14.7 to a pressure expressed in units of p.s.i.g. will yield the
absolute pressure, expressed as p.s.i.a.
16. p.s.i.g.--pounds per square inch gauge, a common unit of
pressure; pressure expressed as p.s.i.g. corresponds to pressure
relative to atmospheric pressure. At sea-level, atmospheric pressure is
approximately 14.7 p.s.i.a Subtracting 14.7 from a pressure expressed
in units of p.s.i.a. yields the gauge pressure, expressed as p.s.i.g.
At sea level the gauge pressure is 0 psig.
17. Qualified person--an individual who, by possession of a
recognized degree, certificate, or professional standing, or who, by
extensive knowledge, training, and experience, successfully
demonstrates an ability to solve or resolve problems relating to the
subject matter, the work, or the project.\16\
---------------------------------------------------------------------------
\16\ Adapted from 29 CFR 1926.32(m).
---------------------------------------------------------------------------
18. Working chamber--an enclosed space in the TBM in which CAWs
perform interventions, and which is accessible only through a man-lock.
E. Safety and Health Practices
1. McNally would have to adhere to the project-specific HOM
submitted to OSHA as part of the application (see OSHA-2022-0007-0002).
The HOM provides the minimum requirements regarding expected safety and
health hazards (including anticipated geological conditions) and
hyperbaric exposures during the tunnel-construction project.
2. McNally would have to demonstrate that the TBM on the project is
designed, fabricated, inspected, tested, marked, and stamped in
accordance with the requirements of ASME PVHO-1.2019 (or most recent
edition of Safety Standards for Pressure Vessels for Human Occupancy)
for the TBM's hyperbaric chambers.
3. McNally would have to implement the safety and health
instructions included in the manufacturer's operations manuals for the
TBM, and the safety and health instructions provided by the
manufacturer for the operation of decompression equipment.
4. McNally would have to ensure that there are no exposures to
pressures greater than 55 p.s.i.g.
5. McNally would have to ensure that air or oxygen is the only
breathing gas in the working chamber.
6. McNally would have to follow the 1992 French Decompression
Tables for air or oxygen decompression as specified in the HOM;
specifically, the extracted portions of the 1992 French Decompression
tables titled, ``French Regulation Air Standard Tables.''
7. McNally would have to equip man-locks used by employees with an
air or oxygen delivery system, as specified by the HOM, for the
project. McNally would be required not to store in the tunnel any
oxygen or other compressed
[[Page 58388]]
gases used in conjunction with hyperbaric work.
8. Workers performing hot work under hyperbaric conditions would
have to use flame-retardant personal protective equipment and clothing.
9. In hyperbaric work areas, McNally would have to maintain an
adequate fire-suppression system approved for hyperbaric work areas.
10. McNally would have to develop and implement one or more Job
Hazard Analysis (JHA) for work in the hyperbaric work areas, and
review, periodically and as necessary (e.g., after making changes to a
planned intervention that affects its operation), the contents of the
JHAs with affected employees. The JHAs would have to include all the
job functions that the risk assessment \17\ indicates are essential to
prevent injury or illness.
---------------------------------------------------------------------------
\17\ See ANSI/AIHA Z10-2012, American National Standard for
Occupational Health and Safety Management Systems, for reference.
---------------------------------------------------------------------------
11. McNally would have to develop a set of checklists to guide
compressed-air work and ensure that employees follow the procedures
required by the proposed permanent variance and this interim order
(including all procedures required by the HOM approved by OSHA for the
project, which this proposed variance would incorporate by reference).
The checklists would have to include all steps and equipment functions
that the risk assessment indicates are essential to prevent injury or
illness during compressed-air work.
McNally would have to ensure that the safety and health provisions
of this project-specific HOM adequately protect the workers of all
contractors and subcontractors involved in hyperbaric operations for
the project to which the HOM applies.
F. Communication
McNally would have to:
1. Prior to beginning a shift, implement a system that informs
workers exposed to hyperbaric conditions of any hazardous occurrences
or conditions that might affect their safety, including hyperbaric
incidents, gas releases, equipment failures, earth or rock slides,
cave-ins, flooding, fires, or explosions.
2. Provide a power-assisted means of communication among affected
workers and support personnel in hyperbaric conditions where unassisted
voice communication is inadequate.
(a) Use an independent power supply for powered communication
systems, and these systems would have to operate such that use or
disruption of any one phone or signal location will not disrupt the
operation of the system from any other location.
(b) Test communication systems at the start of each shift and as
necessary thereafter to ensure proper operation.
G. Worker Qualifications and Training
McNally would have to:
1. Ensure that each affected worker receives effective training on
how to safely enter, work in, exit from, and undertake emergency
evacuation or rescue from, hyperbaric conditions, and document this
training.
2. Provide effective instruction on hyperbaric conditions, before
beginning hyperbaric operations, to each worker who performs work, or
controls the exposure of others, and document this instruction. The
instruction would need to include:
(a) The physics and physiology of hyperbaric work;
(b) Recognition of pressure-related injuries;
(c) Information on the causes and recognition of the signs and
symptoms associated with decompression illness, and other hyperbaric
intervention-related health effects (e.g., barotrauma, nitrogen
narcosis, and oxygen toxicity);
(d) How to avoid discomfort during compression and decompression;
(e) Information the workers can use to contact the appropriate
healthcare professionals should the workers have concerns that they may
be experiencing adverse health effects from hyperbaric exposure; and
(f) Procedures and requirements applicable to the employee in the
project-specific HOM.
3. Repeat the instruction specified in paragraph (G)(2)(b) of this
proposed condition periodically and as necessary (e.g., after making
changes to its hyperbaric operations).
4. When conducting training for its hyperbaric workers, make this
training available to OSHA personnel and notify the OTPCA at OSHA's
National Office and OSHA's nearest affected Area Office before the
training takes place.
H. Inspections, Tests, and Accident Prevention
1. McNally would have to initiate and maintain a program of
frequent and regular inspections of the TBM's hyperbaric equipment and
support systems (such as temperature control, illumination,
ventilation, and fire-prevention and fire-suppression systems), and
hyperbaric work areas, as required under 29 CFR 1926.20(b)(2),
including:
(a) Developing a set of checklists to be used by a competent person
in conducting weekly inspections of hyperbaric equipment and work
areas; and
(b) Ensuring that a competent person conducts daily visual checks
and weekly inspections of the TBM.
2. Remove from service any equipment that constitutes a safety
hazard until it corrects the hazardous condition and has the correction
approved by a qualified person.
3. McNally would have to maintain records of all tests and
inspections of the TBM, as well as associated corrective actions and
repairs, at the job site for the duration of the job.
I. Compression and Decompression
McNally would have to consult with its attending physician
concerning the need for special compression or decompression exposures
appropriate for CAWs not acclimated to hyperbaric exposure.
J. Recordkeeping
In addition to completing OSHA Form 301 Injury and Illness Incident
Report and OSHA Form 300 Log of Work-Related Injuries and Illnesses,
McNally would have to maintain records of:
1. The date, times (e.g., time compression started, time spent
compressing, time performing intervention, time spent decompressing),
and pressure for each hyperbaric intervention.
2. The names of all supervisors and DMTs involved for each
intervention.
3. The name of each individual worker exposed to hyperbaric
pressure and the decompression protocols and results for each worker.
4. The total number of interventions and the amount of hyperbaric
work time at each pressure.
5. The results of the post-intervention physical assessment of each
CAW for signs and symptoms of decompression illness, barotrauma,
nitrogen narcosis, oxygen toxicity or other health effects associated
with work in compressed air for each hyperbaric intervention.
K. Notifications
1. To assist OSHA in administering the conditions specified herein,
McNally would have to:
(a) Notify the OTPCA and the Cleveland, Ohio Area Office of any
recordable injury, illness, or fatality (by submitting the completed
OSHA Form 301 Injuries and Illness Incident Report) \18\ resulting from
exposure of an employee to hyperbaric conditions, including those that
do not require recompression treatment (e.g., nitrogen narcosis, oxygen
toxicity, barotrauma),
[[Page 58389]]
but still meet the recordable injury or illness criteria of 29 CFR
1904. The notification would have to be made within 8 hours of the
incident or 8 hours after becoming aware of a recordable injury,
illness, or fatality; a copy of the incident investigation (OSHA Form
301 Injuries and Illness Incident Report) must be submitted to OSHA
within 24 hours of the incident or 24 hours after becoming aware of a
recordable injury, illness, or fatality. In addition to the information
required by OSHA Form 301 Injuries and Illness Incident Report, the
incident-investigation report would have to include a root-cause
determination, and the preventive and corrective actions identified and
implemented.
---------------------------------------------------------------------------
\18\ See footnote 12.
---------------------------------------------------------------------------
(b) Provide certification to the Cleveland Ohio Area Office within
15 working days of the incident that McNally informed affected workers
of the incident and the results of the incident investigation
(including the root-cause determination and preventive and corrective
actions identified and implemented).
(c) Notify the OTPCA and the Cleveland Ohio Area Office within 15
working days and in writing, of any change in the compressed-air
operations that affects McNally's ability to comply with the proposed
conditions specified herein.
(d) Upon completion of the SST Project, evaluate the effectiveness
of the decompression tables used throughout the project, and provide a
written report of this evaluation to the OTPCA and the Cleveland Ohio
Area Office.
Note: The evaluation report would have to contain summaries of: (1)
The number, dates, durations, and pressures of the hyperbaric
interventions completed; (2) decompression protocols implemented
(including composition of gas mixtures (air and/or oxygen), and the
results achieved; (3) the total number of interventions and the number
of hyperbaric incidents (decompression illnesses and/or health effects
associated with hyperbaric interventions as recorded on OSHA Form 301
Injuries and Illness Incident Report and OSHA Form 300 Log of Work-
Related Injuries and Illnesses, and relevant medical diagnoses, and
treating physicians' opinions); and (4) root causes of any hyperbaric
incidents, and preventive and corrective actions identified and
implemented.
(e) To assist OSHA in administering the proposed conditions
specified herein, inform the OTPCA and the Cleveland Ohio Area Office
as soon as possible, but no later than seven (7) days, after it has
knowledge that it will:
(i) Cease doing business;
(ii) Change the location and address of the main office for
managing the tunneling operations specified herein; or
(iii) Transfer the operations specified herein to a successor
company.
(f) Notify all affected employees of this proposed permanent
variance by the same means required to inform them of its application
for a Variance.
2. OSHA would have to approve the transfer of the proposed
permanent variance to a successor company through a new application for
a modified variance.
VII. Authority and Signature
James S. Frederick, Deputy Assistant Secretary of Labor for
Occupational Safety and Health, 200 Constitution Avenue NW, Washington,
DC 20210, authorized the preparation of this notice. Accordingly, the
agency is issuing this notice pursuant to 29 U.S.C. 655(d), Secretary
of Labor's Order No. 8-2020 (85 FR 58393, Sept. 18, 2020), and 29 CFR
1905.11.
Signed at Washington, DC, on September 16, 2022.
James S. Frederick,
Deputy Assistant Secretary of Labor for Occupational Safety and Health.
[FR Doc. 2022-20782 Filed 9-23-22; 8:45 am]
BILLING CODE 4510-26-P