Agency Information Collection Activities; Comment Request; Rehabilitation Action Report (OWCP-44), 75377-75378 [2020-26008]

Download as PDF Federal Register / Vol. 85, No. 228 / Wednesday, November 25, 2020 / Notices Affected Public: State, Local, and Tribal Governments and Individuals or Households. Estimated Number of Respondents: 17,583,750. Frequency: Varies. Total Estimated Annual Responses: 41,064,037. Estimated Average Time per Response: Varies. Estimated Total Annual Burden Hours: 10,459,627 hours. Total Estimated Annual Other Cost Burden: $245,464,843.48. Authority: 44 U.S.C. 3506(c)(2)(A). John Pallasch, Assistant Secretary for Employment and Training, Labor. [FR Doc. 2020–26006 Filed 11–24–20; 8:45 am] BILLING CODE 4510–FM–P DEPARTMENT OF LABOR Office of the Workers’ Compensation Programs Agency Information Collection Activities; Comment Request; Rehabilitation Action Report (OWCP– 44) Office of Workers’ Compensation Programs, Labor. ACTION: Notice. AGENCY: The Department of Labor (DOL) is soliciting comments concerning a proposed revision for the authority to conduct the information collection request (ICR) titled, Rehabilitation Action Report (OWCP– 44). This comment request is part of continuing Departmental efforts to reduce paperwork and respondent burden in accordance with the Paperwork Reduction Act of 1995 (PRA). SUMMARY: Consideration will be given to all written comments received by January 25, 2021. ADDRESSES: A copy of this ICR with applicable supporting documentation; including a description of the likely respondents, proposed frequency of response, and estimated total burden may be obtained free by contacting Anjanette Suggs by telephone at 202– 354–9660 or by email at suggs.anjanette@dol.gov. Submit written comments about, or requests for a copy of, this ICR by mail or courier to the U.S. Department of Labor, Office of Workers’ Compensation Programs, Room S3323, 200 Constitution Avenue NW, Washington, DC 20210; by email: suggs.anjanette@ dol.gov. jbell on DSKJLSW7X2PROD with NOTICES DATES: VerDate Sep<11>2014 16:27 Nov 24, 2020 Jkt 253001 FOR FURTHER INFORMATION CONTACT: Anjanette Suggs by telephone at 202– 354–9660 or by email at suggs.anjanette@dol.gov. SUPPLEMENTARY INFORMATION: The DOL, as part of continuing efforts to reduce paperwork and respondent burden, conducts a pre-clearance consultation program to provide the general public and Federal agencies an opportunity to comment on proposed and/or continuing collections of information before submitting them to the OMB for final approval. This program helps to ensure requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements can be properly assessed. Background: The Office of Workers’ Compensation Programs (OWCP) is the agency responsible for administration of the Longshore and Harbor Workers’ Compensation Act (LHWCA) and the Federal Employees’ Compensation Act (FECA). 33 U.S.C. 939 (LHWCA) and 5 U.S.C. 8104 (FECA) authorize OWCP to pay for approved vocational rehabilitation services to eligible workers with work-related disabilities. 5 U.S.C. 8111(b) of the FECA and 33 U.S.C. 908(g) of the LHWCA provide that persons undergoing such vocational rehabilitation receive maintenance allowances as additional compensation. Form OWCP–44 is used to collect information necessary to decide if maintenance allowances should continue to be paid. Form OWCP–44 is submitted to OWCP by contractors hired to provide vocational rehabilitation services. Form OWCP–44 gives prompt notification of key events that may require OWCP action in the vocational rehabilitation process. This information collection is currently approved for use through February 28, 2021. For LHWCA, 20 CFR 702.506 and 20 CFR 702. 507, and for FECA, 20 CFR 10.518 and 20 CFR 10.519, authorizes this information collection. This information collection is subject to the PRA. A Federal agency generally cannot conduct or sponsor a collection of information, and the public is generally not required to respond to an information collection, unless the OMB under the PRA approves it and displays a currently valid OMB Control Number. In addition, notwithstanding any other provisions of law, no person shall generally be subject to penalty for failing to comply with a collection of information that does not display a valid Control Number. See 5 CFR 1320.5(a) and 1320.6. PO 00000 Frm 00095 Fmt 4703 Sfmt 4703 75377 Interested parties are encouraged to provide comments to the contact shown in the ADDRESSES section. Written comments will receive consideration, and summarized and included in the request for OMB approval of the final ICR. In order to help ensure appropriate consideration, comments should mention OMB# 1240–0008. Submitted comments will also be a matter of public record for this ICR and posted on the internet, without redaction. The DOL encourages commenters not to include personally identifiable information, confidential business data, or other sensitive statements/information in any comments. The DOL is particularly interested in comments that: • Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information will have practical utility. • Evaluate the accuracy of the agency’s estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used. • Enhance the quality, utility, and clarity of the information to be collected; and • Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of responses. Agency: DOL-Office of Workers’ Compensation Programs. Type of Review: Revision. Title of Collection: Rehabilitation Action Report. Agency Form Number: OWCP–44. OMB Control Number: 1240–0008. Affected Public: State, Local or Tribal Government, Businesses or other forprofit. Estimated Number of Respondents: 3,299. Frequency: Occasionally. Total Estimated Annual Responses: 3,299. Estimated Average Time per Response: 10 minutes. Estimated Total Annual Burden Hours: 550 hours. Total Estimated Annual Other Cost Burden: $296, 910.00. E:\FR\FM\25NON1.SGM 25NON1 75378 Federal Register / Vol. 85, No. 228 / Wednesday, November 25, 2020 / Notices Authority: 44 U.S.C. 3506(c)(2)(A). Anjanette Suggs, Agency Clearance Officer, Office of Workers’ Compensation Programs, U.S. Department of Labor. [FR Doc. 2020–26008 Filed 11–24–20; 8:45 am] BILLING CODE 4510–CH–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–313, 50–368, 50–483, 50– 317, 50–318, 50–315, 50–316, 50–416, 50– 266, 50–301, 50–498, 50–499, NRC–2020– 0110] Issuance of Multiple Exemptions in Response to COVID–19 Public Health Emergency Nuclear Regulatory Commission. ACTION: Exemptions; issuance. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) issued seven exemptions in response to requests from six licensees. The exemptions afford these licensees temporary relief from certain requirements under NRC regulations. The exemptions are in response to the licensees’ requests for relief due to the coronavirus disease 2019 (COVID–19) public health emergency (PHE). The NRC is issuing a single notice to announce the issuance of the exemptions. DATES: During the period from October 6, 2020, to October 26, 2020, the NRC granted seven exemptions in response to requests submitted by licensees from July 13, 2020, to October 8, 2020. ADDRESSES: Please refer to Docket ID NRC–2020–0110 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2020–0110. Address questions about NRC Docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact jbell on DSKJLSW7X2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 16:27 Nov 24, 2020 Jkt 253001 the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. • Attention: The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via email at PDR.Resource@nrc.gov or call 1–800–397–4209 between 8:00 a.m. and 4:00 p.m. (EST), Monday through Friday, except Federal holidays. For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the ‘‘Availability of Documents’’ section. FOR FURTHER INFORMATION CONTACT: James Danna, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555– 0001; telephone: 301–415–7422, email: James.Danna@nrc.gov. SUPPLEMENTARY INFORMATION: I. Introduction During the period from October 6, 2020, to October 26, 2020, the NRC granted seven exemptions in response to requests submitted by licensees from July 13, 2020, to October 8, 2020. These exemptions temporarily allow the licensees to deviate from certain requirements (as cited below) of various parts of chapter I of title 10 of the Code of Federal Regulations (10 CFR). The exemptions from certain requirements of 10 CFR part 26, ‘‘Fitness for Duty Programs,’’ for Indiana Michigan Power Company (for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2), and NextEra Energy Point Beach, LLC (for Point Beach Nuclear Plant, Units 1 and 2), afford these licensees temporary relief from the work-hour controls under 10 CFR 26.205(d)(1) through (d)(7). The exemptions from 10 CFR 26.205(d)(1) through (d)(7) ensure that the control of work hours and management of worker fatigue do not unduly limit licensee flexibility in using personnel resources to most effectively manage the impacts of the COVID–19 PHE on maintaining the safe operation of these facilities. Specifically, these licensees have stated that their staffing levels are affected or are expected to be affected by the COVID–19 PHE, and they can no longer meet or likely will not meet the work-hour controls of 10 CFR 26.205(d)(1) through (d)(7). These licensees have committed to effecting site-specific administrative controls for COVID–19 PHE fatigue-management for personnel specified in 10 CFR 26.4(a). The exemptions from certain requirements of 10 CFR part 50, appendix E, ‘‘Emergency Planning and PO 00000 Frm 00096 Fmt 4703 Sfmt 4703 Preparedness for Production and Utilization Facilities,’’ section IV.F., ‘‘Training,’’ for Entergy Operations, Inc. (for Arkansas Nuclear One, Units 1 and 2), and STP Nuclear Operating Company (for South Texas Project, Units 1 and 2), grant temporary exemptions from the biennial emergency preparedness exercise requirement. The exemptions allow a temporary exemption from the requirements of 10 CFR part 50, appendix E, regarding the conduct of the biennial emergency preparedness exercise. These exemptions will not adversely affect the emergency response capability of the facilities because affected licensee personnel are currently qualified, and the licensees’ proposed compensatory measures will enable their staff to maintain their knowledge, skills, and abilities without the conduct of the biennial emergency preparedness exercise during the exemption term. The exemptions from certain requirements of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ section VI., ‘‘Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties,’’ for Union Electric Company (for Callaway Plant, Unit No. 1); for Exelon Generation Company, LLC (for Calvert Cliffs Nuclear Power Plant, Units 1 and 2); and Entergy Operations, Inc. (for Grand Gulf Nuclear Station, Unit 1), afford these licensees temporary exemptions from certain requirements. The exemptions will help to ensure that these regulatory requirements do not unduly limit licensee flexibility in using personnel resources in a manner that most effectively manages the impacts of the COVID–19 PHE on maintaining the safe and secure operation of these facilities and the implementation of the licensees’ NRC-approved security plans, protective strategy, and implementing procedures. These licensees have committed to certain security measures to ensure response readiness and for their security personnel to maintain performance capability. The NRC is providing compiled tables of exemptions using a single Federal Register notice for COVID–19-related exemptions instead of issuing individual Federal Register notices for each exemption. The compiled tables below provide transparency regarding the number and type of exemptions the NRC has issued. Additionally, the NRC publishes tables of approved regulatory actions related to the COVID–19 PHE on its public website at https:// www.nrc.gov/about-nrc/covid-19/ reactors/licensing-actions.html. E:\FR\FM\25NON1.SGM 25NON1

Agencies

[Federal Register Volume 85, Number 228 (Wednesday, November 25, 2020)]
[Notices]
[Pages 75377-75378]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-26008]


-----------------------------------------------------------------------

DEPARTMENT OF LABOR

Office of the Workers' Compensation Programs


Agency Information Collection Activities; Comment Request; 
Rehabilitation Action Report (OWCP-44)

AGENCY: Office of Workers' Compensation Programs, Labor.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Department of Labor (DOL) is soliciting comments 
concerning a proposed revision for the authority to conduct the 
information collection request (ICR) titled, Rehabilitation Action 
Report (OWCP-44). This comment request is part of continuing 
Departmental efforts to reduce paperwork and respondent burden in 
accordance with the Paperwork Reduction Act of 1995 (PRA).

DATES: Consideration will be given to all written comments received by 
January 25, 2021.

ADDRESSES: A copy of this ICR with applicable supporting documentation; 
including a description of the likely respondents, proposed frequency 
of response, and estimated total burden may be obtained free by 
contacting Anjanette Suggs by telephone at 202-354-9660 or by email at 
[email protected].
    Submit written comments about, or requests for a copy of, this ICR 
by mail or courier to the U.S. Department of Labor, Office of Workers' 
Compensation Programs, Room S3323, 200 Constitution Avenue NW, 
Washington, DC 20210; by email: [email protected].

FOR FURTHER INFORMATION CONTACT: Anjanette Suggs by telephone at 202-
354-9660 or by email at [email protected].

SUPPLEMENTARY INFORMATION: The DOL, as part of continuing efforts to 
reduce paperwork and respondent burden, conducts a pre-clearance 
consultation program to provide the general public and Federal agencies 
an opportunity to comment on proposed and/or continuing collections of 
information before submitting them to the OMB for final approval. This 
program helps to ensure requested data can be provided in the desired 
format, reporting burden (time and financial resources) is minimized, 
collection instruments are clearly understood, and the impact of 
collection requirements can be properly assessed.
    Background: The Office of Workers' Compensation Programs (OWCP) is 
the agency responsible for administration of the Longshore and Harbor 
Workers' Compensation Act (LHWCA) and the Federal Employees' 
Compensation Act (FECA). 33 U.S.C. 939 (LHWCA) and 5 U.S.C. 8104 (FECA) 
authorize OWCP to pay for approved vocational rehabilitation services 
to eligible workers with work-related disabilities. 5 U.S.C. 8111(b) of 
the FECA and 33 U.S.C. 908(g) of the LHWCA provide that persons 
undergoing such vocational rehabilitation receive maintenance 
allowances as additional compensation. Form OWCP-44 is used to collect 
information necessary to decide if maintenance allowances should 
continue to be paid. Form OWCP-44 is submitted to OWCP by contractors 
hired to provide vocational rehabilitation services. Form OWCP-44 gives 
prompt notification of key events that may require OWCP action in the 
vocational rehabilitation process. This information collection is 
currently approved for use through February 28, 2021.
    For LHWCA, 20 CFR 702.506 and 20 CFR 702. 507, and for FECA, 20 CFR 
10.518 and 20 CFR 10.519, authorizes this information collection. This 
information collection is subject to the PRA. A Federal agency 
generally cannot conduct or sponsor a collection of information, and 
the public is generally not required to respond to an information 
collection, unless the OMB under the PRA approves it and displays a 
currently valid OMB Control Number. In addition, notwithstanding any 
other provisions of law, no person shall generally be subject to 
penalty for failing to comply with a collection of information that 
does not display a valid Control Number. See 5 CFR 1320.5(a) and 
1320.6.
    Interested parties are encouraged to provide comments to the 
contact shown in the ADDRESSES section. Written comments will receive 
consideration, and summarized and included in the request for OMB 
approval of the final ICR. In order to help ensure appropriate 
consideration, comments should mention OMB# 1240-0008.
    Submitted comments will also be a matter of public record for this 
ICR and posted on the internet, without redaction. The DOL encourages 
commenters not to include personally identifiable information, 
confidential business data, or other sensitive statements/information 
in any comments.
    The DOL is particularly interested in comments that:
     Evaluate whether the proposed collection of information is 
necessary for the proper performance of the functions of the agency, 
including whether the information will have practical utility.
     Evaluate the accuracy of the agency's estimate of the 
burden of the proposed collection of information, including the 
validity of the methodology and assumptions used.
     Enhance the quality, utility, and clarity of the 
information to be collected; and
     Minimize the burden of the collection of information on 
those who are to respond, including through the use of appropriate 
automated, electronic, mechanical, or other technological collection 
techniques or other forms of information technology, e.g., permitting 
electronic submission of responses.
    Agency: DOL-Office of Workers' Compensation Programs.
    Type of Review: Revision.
    Title of Collection: Rehabilitation Action Report.
    Agency Form Number: OWCP-44.
    OMB Control Number: 1240-0008.
    Affected Public: State, Local or Tribal Government, Businesses or 
other for-profit.
    Estimated Number of Respondents: 3,299.
    Frequency: Occasionally.
    Total Estimated Annual Responses: 3,299.
    Estimated Average Time per Response: 10 minutes.
    Estimated Total Annual Burden Hours: 550 hours.
    Total Estimated Annual Other Cost Burden: $296, 910.00.


[[Page 75378]]


    Authority:  44 U.S.C. 3506(c)(2)(A).

Anjanette Suggs,
Agency Clearance Officer, Office of Workers' Compensation Programs, 
U.S. Department of Labor.
[FR Doc. 2020-26008 Filed 11-24-20; 8:45 am]
BILLING CODE 4510-CH-P