Agency Information Collection Activities; Submission for OMB Review; Comment Request; Concrete and Masonry Construction Standard, 59825-59826 [2020-20952]

Download as PDF Federal Register / Vol. 85, No. 185 / Wednesday, September 23, 2020 / Notices DEPARTMENT OF LABOR DEPARTMENT OF LABOR Employment and Training Administration Office of the Secretary Agency Information Collection Activities; Submission for OMB Review; Comment Request; Concrete and Masonry Construction Standard Notice of a Change in Status of an Extended Benefit (EB) Program for Nebraska Notice of availability; request for comments. ACTION: Employment and Training Administration, Labor. AGENCY: ACTION: This notice announces a change in benefit period eligibility under the EB program for Nebraska. The following change has occurred since the publication of the last notice regarding the State’s EB status: • Nebraska’s 13-week insured unemployment rate (IUR) for the week ending August 22, 2020, was 4.95 percent, falling below the 5.00 percent threshold necessary to remain ‘‘on’’ EB. Therefore, the EB period for Nebraska will end on September 12, 2020. The state will remain in an ‘‘off’’ period for a minimum of 13 weeks. Information for Claimants The duration of benefits payable in the EB Program, and the terms and conditions on which they are payable, are governed by the Federal-State Extended Unemployment Compensation Act of 1970, as amended, and the operating instructions issued to the states by the U.S. Department of Labor. In the case of a state ending an EB period, the State Workforce Agency will furnish a written notice to each individual who is currently filing claims for EB of the forthcoming termination of the EB period and its effect on the individual’s right to EB (20 CFR 615.13 (c)). U.S. Department of Labor, Employment and Training Administration, Office of Unemployment Insurance, Room S– 4524, Attn: Thomas Stengle, 200 Constitution Avenue NW, Washington, DC 20210, telephone number (202)– 693–2991 (this is not a toll-free number) or by email: Stengle.Thomas@dol.gov. khammond on DSKJM1Z7X2PROD with NOTICES FOR FURTHER INFORMATION CONTACT: Signed in Washington, DC. John Pallasch, Assistant Secretary for Employment and Training. [FR Doc. 2020–21029 Filed 9–22–20; 8:45 am] BILLING CODE 4510–FW–P VerDate Sep<11>2014 18:02 Sep 22, 2020 The Department of Labor (DOL) is submitting this Occupational Safety and Health Administration (OSHA)-sponsored information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act of 1995 (PRA). Public comments on the ICR are invited. DATES: The OMB will consider all written comments that agency receives on or before October 23, 2020. ADDRESSES: Written comments and recommendations for the proposed information collection should be sent within 30 days of publication of this notice to www.reginfo.gov/public/do/ PRAMain. Find this particular information collection by selecting ‘‘Currently under 30-day Review—Open for Public Comments’’ or by using the search function. FOR FURTHER INFORMATION CONTACT: Anthony May by telephone at 202–693– 4129 (this is not a toll-free number) or by email at DOL_PRA_PUBLIC@dol.gov. SUPPLEMENTARY INFORMATION: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Department, including whether the information will have practical utility; (2) if the information will be processed and used in a timely manner; (3) the accuracy of the agency’s estimates of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (4) ways to enhance the quality, utility and clarity of the information collection; and (5) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. The Occupational Safety and Health Act of 1970 (the OSH Act) (29 U.S.C. 651 et seq.) authorizes information collection by employers as necessary or appropriate for enforcement of the OSH Act or for developing information regarding the causes and prevention of occupational injuries, illnesses, and accidents (29 U.S.C. 657). The OSH Act also requires that OSHA obtain such SUMMARY: Notice. Jkt 250001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 59825 information with minimum burden upon employers, especially those operating small businesses, and to reduce to the maximum extent feasible unnecessary duplication of efforts in obtaining information (29 U.S.C. 657). The warning signs/barriers required by paragraph 1926.701(c)(2) reduce exposure of non-essential workers to the hazards of post-tensioning operations, principally a failed rope or wire striking a worker and causing serious injury. The requirements for lockout and tag ejection systems and other hazardous equipment (e.g., compressors, mixers, screens or pumps used for concrete and masonry construction) specified by paragraphs 1926.702(a)(2), (j)(1), and (j)(2) warn equipment operators not to activate their equipment if another worker enters the equipment to perform a task (e.g., cleaning, inspecting, maintaining, repairing), thereby preventing injury or death. Construction contractors and workers use the drawings, plans, and designs required by paragraph 1926.703(a)(2) to provide specific instructions on how to construct, erect, brace, maintain, and remove shores and formwork if they pour concrete at the job site. Paragraph 1926.705(b) requires employers to mark the rated capacity of jacks and lifting units. This requirement prevents overloading and subsequent collapse of jacks and lifting units, as well as their loads, thereby sparing exposed workers from serious injury or death. For additional substantive information about this ICR, see the related notice published in the Federal Register on May 20, 2020 (85 FR 30740). This information collection is subject to the PRA. A Federal agency generally cannot conduct or sponsor a collection of information, and the public is generally not required to respond to an information collection, unless the OMB approves it and displays a currently valid OMB Control Number. In addition, notwithstanding any other provisions of law, no person shall generally be subject to penalty for failing to comply with a collection of information that does not display a valid OMB Control Number. See 5 CFR 1320.5(a) and 1320.6. DOL seeks PRA authorization for this information collection for three (3) years. OMB authorization for an ICR cannot be for more than three (3) years without renewal. The DOL notes that information collection requirements submitted to the OMB for existing ICRs receive a month-to-month extension while they undergo review. Agency: DOL–OSHA. Title of Collection: Concrete and Masonry Construction Standard. OMB Control Number: 1218–0095. E:\FR\FM\23SEN1.SGM 23SEN1 59826 Federal Register / Vol. 85, No. 185 / Wednesday, September 23, 2020 / Notices Affected Public: Private Sector: Businesses or other for-profits. Total Estimated Number of Respondents: 275,619. Total Estimated Number of Responses: 275,619. Total Estimated Annual Time Burden: 22,968 hours. Total Estimated Annual Other Costs Burden: $0. Authority: 44 U.S.C. 3507(a)(1)(D). Dated: September 17, 2020. Anthony May, Management and Program Analyst. [FR Doc. 2020–20952 Filed 9–22–20; 8:45 am] BILLING CODE 4510–26–P DEPARTMENT OF LABOR Office of the Secretary Maintenance and Operating Instructions (§§ 1910.266(f)(1)(iii) and (g)(3)) Agency Information Collection Activities; Submission for OMB Review; Comment Request; Logging Operations Standards Notice of availability; request for comments. ACTION: The Department of Labor (DOL) is submitting this Occupational Safety and Health Administration (OSHA)-sponsored information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act of 1995 (PRA). Public comments on the ICR are invited. DATES: The OMB will consider all written comments that agency receives on or before October 23, 2020. ADDRESSES: Written comments and recommendations for the proposed information collection should be sent within 30 days of publication of this notice to www.reginfo.gov/public/do/ PRAMain. Find this particular information collection by selecting ‘‘Currently under 30-day Review—Open for Public Comments’’ or by using the search function. FOR FURTHER INFORMATION CONTACT: Anthony May by telephone at 202–693– 4129 (this is not a toll-free number) or by email at DOL_PRA_PUBLIC@dol.gov. SUPPLEMENTARY INFORMATION: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Department, including whether the information will have practical utility; (2) if the information will be processed and used in a timely manner; (3) the accuracy of the agency’s estimates of the burden and cost of the collection of information, including the khammond on DSKJM1Z7X2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 18:02 Sep 22, 2020 Jkt 250001 validity of the methodology and assumptions used; (4) ways to enhance the quality, utility and clarity of the information collection; and (5) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. The collection of information contained in the Logging Operations Standard are necessary to reduce workers’ risk of death or serious injury by requiring employers to assure that operating and maintenance instructions are available on machines or in the area where the machine is operated. For vehicles, employers must assure that operating and maintenance instructions are available for each vehicle. Under paragraph (f)(1)(iii) and (g)(3) of the Standard, employers must assure that operating and maintenance instructions are available on machines or in the area where the machine is being operated, and in vehicles. For those machines with no operating instructions in the cab, the employer will be required to obtain and retain a manual within the immediate work area for each machine. Because the Logging Operations final rule has been in effect since 1995, OSHA assumes that all employers are in compliance with the provision to have operating and maintenance instructions available on machines or in the area where the machines are being operated. Certification of Training (§ 1910.266(i)(10)(i) and (i)(10)(ii)) Paragraph (i)(10)(i) requires employers to certify in writing that a worker/supervisor received the training the Standard requires. Under paragraph (i)(10)(ii), employers need only maintain the most recent certification for training that a worker/supervisor has received. For additional substantive information about this ICR, see the related notice published in the Federal Register on April 24, 2020 (85 FR 23068). This information collection is subject to the PRA. A Federal agency generally cannot conduct or sponsor a collection of information, and the public is generally not required to respond to an information collection, unless the OMB approves it and displays a currently valid OMB Control Number. In addition, notwithstanding any other provisions of law, no person shall generally be subject to penalty for failing to comply with a collection of information that does not PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 display a valid OMB Control Number. See 5 CFR 1320.5(a) and 1320.6. DOL seeks PRA authorization for this information collection for three (3) years. OMB authorization for an ICR cannot be for more than three (3) years without renewal. The DOL notes that information collection requirements submitted to the OMB for existing ICRs receive a month-to-month extension while they undergo review. Agency: DOL–OSHA. Title of Collection: Logging Operation Standard. OMB Control Number: 1218–0198. Affected Public: Private Sector: Businesses or other for-profits. Total Estimated Number of Respondents: 8,076. Total Estimated Number of Responses: 50,996. Total Estimated Annual Time Burden: 1,507 hours. Total Estimated Annual Other Costs Burden: $0. Authority: 44 U.S.C. 3507(a)(1)(D). Dated: September 17, 2020. Anthony May, Management and Program Analyst. [FR Doc. 2020–20951 Filed 9–22–20; 8:45 am] BILLING CODE 4510–26–P DEPARTMENT OF LABOR Office of the Secretary Agency Information Collection Activities; Submission for OMB Review; Comment Request; Producer Price Index Survey Notice of availability; request for comments. ACTION: The Department of Labor (DOL) is submitting this Bureau of Labor Statistics (BLS)-sponsored information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act of 1995 (PRA). Public comments on the ICR are invited. DATES: The OMB will consider all written comments that agency receives on or before October 23, 2020. ADDRESSES: Written comments and recommendations for the proposed information collection should be sent within 30 days of publication of this notice to www.reginfo.gov/public/do/ PRAMain. Find this particular information collection by selecting ‘‘Currently under 30-day Review—Open for Public Comments’’ or by using the search function. FOR FURTHER INFORMATION CONTACT: Anthony May by telephone at 202–693– SUMMARY: E:\FR\FM\23SEN1.SGM 23SEN1

Agencies

[Federal Register Volume 85, Number 185 (Wednesday, September 23, 2020)]
[Notices]
[Pages 59825-59826]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-20952]


-----------------------------------------------------------------------

DEPARTMENT OF LABOR

Office of the Secretary


Agency Information Collection Activities; Submission for OMB 
Review; Comment Request; Concrete and Masonry Construction Standard

ACTION: Notice of availability; request for comments.

-----------------------------------------------------------------------

SUMMARY: The Department of Labor (DOL) is submitting this Occupational 
Safety and Health Administration (OSHA)-sponsored information 
collection request (ICR) to the Office of Management and Budget (OMB) 
for review and approval in accordance with the Paperwork Reduction Act 
of 1995 (PRA). Public comments on the ICR are invited.

DATES: The OMB will consider all written comments that agency receives 
on or before October 23, 2020.

ADDRESSES: Written comments and recommendations for the proposed 
information collection should be sent within 30 days of publication of 
this notice to www.reginfo.gov/public/do/PRAMain. Find this particular 
information collection by selecting ``Currently under 30-day Review--
Open for Public Comments'' or by using the search function.

FOR FURTHER INFORMATION CONTACT: Anthony May by telephone at 202-693-
4129 (this is not a toll-free number) or by email at 
[email protected].

SUPPLEMENTARY INFORMATION: Comments are invited on: (1) Whether the 
collection of information is necessary for the proper performance of 
the functions of the Department, including whether the information will 
have practical utility; (2) if the information will be processed and 
used in a timely manner; (3) the accuracy of the agency's estimates of 
the burden and cost of the collection of information, including the 
validity of the methodology and assumptions used; (4) ways to enhance 
the quality, utility and clarity of the information collection; and (5) 
ways to minimize the burden of the collection of information on those 
who are to respond, including the use of automated collection 
techniques or other forms of information technology.
    The Occupational Safety and Health Act of 1970 (the OSH Act) (29 
U.S.C. 651 et seq.) authorizes information collection by employers as 
necessary or appropriate for enforcement of the OSH Act or for 
developing information regarding the causes and prevention of 
occupational injuries, illnesses, and accidents (29 U.S.C. 657). The 
OSH Act also requires that OSHA obtain such information with minimum 
burden upon employers, especially those operating small businesses, and 
to reduce to the maximum extent feasible unnecessary duplication of 
efforts in obtaining information (29 U.S.C. 657). The warning signs/
barriers required by paragraph 1926.701(c)(2) reduce exposure of non-
essential workers to the hazards of post-tensioning operations, 
principally a failed rope or wire striking a worker and causing serious 
injury. The requirements for lockout and tag ejection systems and other 
hazardous equipment (e.g., compressors, mixers, screens or pumps used 
for concrete and masonry construction) specified by paragraphs 
1926.702(a)(2), (j)(1), and (j)(2) warn equipment operators not to 
activate their equipment if another worker enters the equipment to 
perform a task (e.g., cleaning, inspecting, maintaining, repairing), 
thereby preventing injury or death. Construction contractors and 
workers use the drawings, plans, and designs required by paragraph 
1926.703(a)(2) to provide specific instructions on how to construct, 
erect, brace, maintain, and remove shores and formwork if they pour 
concrete at the job site. Paragraph 1926.705(b) requires employers to 
mark the rated capacity of jacks and lifting units. This requirement 
prevents overloading and subsequent collapse of jacks and lifting 
units, as well as their loads, thereby sparing exposed workers from 
serious injury or death. For additional substantive information about 
this ICR, see the related notice published in the Federal Register on 
May 20, 2020 (85 FR 30740).
    This information collection is subject to the PRA. A Federal agency 
generally cannot conduct or sponsor a collection of information, and 
the public is generally not required to respond to an information 
collection, unless the OMB approves it and displays a currently valid 
OMB Control Number. In addition, notwithstanding any other provisions 
of law, no person shall generally be subject to penalty for failing to 
comply with a collection of information that does not display a valid 
OMB Control Number. See 5 CFR 1320.5(a) and 1320.6.
    DOL seeks PRA authorization for this information collection for 
three (3) years. OMB authorization for an ICR cannot be for more than 
three (3) years without renewal. The DOL notes that information 
collection requirements submitted to the OMB for existing ICRs receive 
a month-to-month extension while they undergo review.
    Agency: DOL-OSHA.
    Title of Collection: Concrete and Masonry Construction Standard.
    OMB Control Number: 1218-0095.

[[Page 59826]]

    Affected Public: Private Sector: Businesses or other for-profits.
    Total Estimated Number of Respondents: 275,619.
    Total Estimated Number of Responses: 275,619.
    Total Estimated Annual Time Burden: 22,968 hours.
    Total Estimated Annual Other Costs Burden: $0.

    Authority: 44 U.S.C. 3507(a)(1)(D).

    Dated: September 17, 2020.
Anthony May,
Management and Program Analyst.
[FR Doc. 2020-20952 Filed 9-22-20; 8:45 am]
BILLING CODE 4510-26-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.