May 20, 2015 – Federal Register Recent Federal Regulation Documents
Results 151 - 158 of 158
Appointments to the Health Information Technology (HIT) Policy Committee
The American Recovery and Reinvestment Act requires the Comptroller General of the United States to appoint 13 of 20 members to the HIT Policy Committee. As of April 2015, new appointees to the HIT Policy Committee are Kathleen Blake, MD, MPH, an expert in health care quality measurement and reporting; Donna Cryer, JD, an advocate for patients or consumers; and Brent Snyder, Esq., a representative of health care providers.
Appointment to the Methodology Committee of the Patient-Centered Outcomes Research Institute (PCORI)
The Methodology Committee assists PCORI in developing and updating methodological standards and guidance for comparative clinical effectiveness research. The Patient Protection and Affordable Care Act directs the Comptroller General to appoint up to 15 members to PCORI's Methodology Committee. This notice announces the appointment of a new member, Adam Wilcox, Ph.D., Director of Medical Informatics at Intermountain Healthcare in Salt Lake City, Utah.
Deepwater Horizon Oil Spill; Draft Phase IV Early Restoration Plan and Environmental Assessments
In accordance with the Oil Pollution Act of 1990 (OPA), the National Environmental Policy Act (NEPA), and the Framework Agreement for Early Restoration Addressing Injuries Resulting from the Deepwater Horizon Oil Spill, the Federal and State natural resource trustee agencies (Trustees) have prepared a Draft Phase IV Early Restoration Plan and Environmental Assessments (Draft Phase IV ERP/EA) describing and proposing a suite of early restoration projects intended to continue the process of restoring natural resources and services injured or lost as a result of the Deepwater Horizon oil spill, which occurred on or about April 20, 2010, in the Gulf of Mexico. The Draft Phase IV ERP/EA proposes 10 early restoration projects that are consistent with the early restoration program alternatives selected in the Final Phase III Early Restoration Plan/Programmatic Environmental Impact Statement (Phase III ERP/PEIS). The Draft Phase IV ERP/EA also includes a notice of change and supporting analysis for one Phase III Early Restoration Project, ``Enhancement of Franklin County Parks and Boat RampsEastpoint Fishing Pier Improvements.'' The purpose of this notice is to inform the public of the availability of the Draft Phase IV ERP/EA and to seek public comments on the 10 proposed early restoration projects and supporting analysis.
Revised Medical Criteria for Evaluating Cancer (Malignant Neoplastic Diseases)
We are revising the criteria in parts A and B of the Listing of Impairments (listings) that we use to evaluate claims involving cancer (malignant neoplastic diseases) under titles II and XVI of the Social Security Act (Act). These revisions reflect our adjudicative experience, advances in medical knowledge, recommendations from medical experts we consulted, and public comments we received in response to a Notice of Proposed Rulemaking (NPRM).
Hazardous Materials: Notice of Application for Modification of Special Permit
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR part 107, subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the applications described herein. This notice is abbreviated to expedite docketing and public notice. Because the sections affected, modes of transportation, and the nature of application have been shown in earlier Federal Register publications, they are not repeated here. Requests for modification of special permits (e.g. to provide for additional hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in footnotes to the application number. Application numbers with the suffix ``M'' denote a modification request. These applications have been separated from the new application for special permits to facilitate processing.
Hazardous Materials: Notice of Application for Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR part 107, subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. Each mode of transportation for which a particular special permit is requested is indicated by a number in the ``Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft.
Approval and Promulgation of Implementation Plans; New Mexico; Revisions to the New Source Review (NSR) State Implementation Plan (SIP) for Albuquerque-Bernalillo County; Prevention of Significant Deterioration (PSD) Permitting
The Environmental Protection Agency (EPA) is proposing to approve two revisions to the New Mexico State Implementation Plan (SIP) to update the Albuquerque-Bernalillo County Prevention of Significant Deterioration (PSD) SIP permitting program consistent with federal requirements. New Mexico submitted the Albuquerque-Bernalillo County PSD SIP permitting revisions on July 26, 2013, and March 4, 2015, which included a request for parallel processing of the submitted 2015 revisions. These submittals contain revisions to address the requirements of the EPA's May 2008, July 2010, and October 2012 PM2.5 PSD Implementation Rules and to incorporate revisions consistent with the EPA's March 2011 Fugitives Interim Rule, July 2011 Greenhouse Gas (GHG) Biomass Deferral Rule, and July 2012 GHG Tailoring Rule Step 3 and GHG PALs Rule. The EPA is proposing to find that these revisions to the New Mexico SIP meet the Federal Clean Air Act (the Act or CAA) and EPA regulations, and are consistent with EPA policies. We are proposing this action under section 110 and part C of title I of the Act. The EPA is not approving these rules within the exterior boundaries of a reservation or other areas within any Tribal Nation's jurisdiction.
Wassenaar Arrangement 2013 Plenary Agreements Implementation: Intrusion and Surveillance Items
The Bureau of Industry and Security (BIS) proposes to implement the agreements by the Wassenaar Arrangement (WA) at the Plenary meeting in December 2013 with regard to systems, equipment or components specially designed for the generation, operation or delivery of, or communication with, intrusion software; software specially designed or modified for the development or production of such systems, equipment or components; software specially designed for the generation, operation or delivery of, or communication with, intrusion software; technology required for the development of intrusion software; Internet Protocol (IP) network communications surveillance systems or equipment and test, inspection, production equipment, specially designed components therefor, and development and production software and technology therefor. BIS proposes a license requirement for the export, reexport, or transfer (in-country) of these cybersecurity items to all destinations, except Canada. Although these cybersecurity capabilities were not previously designated for export control, many of these items have been controlled for their ``information security'' functionality, including encryption and cryptanalysis. This rule thus continues applicable Encryption Items (EI) registration and review requirements, while setting forth proposed license review policies and special submission requirements to address the new cybersecurity controls, including submission of a letter of explanation with regard to the technical capabilities of the cybersecurity items. BIS also proposes to add the definition of ``intrusion software'' to the definition section of the EAR pursuant to the WA 2013 agreements.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.