Cranes and Derricks in Construction: Demolition and Underground Construction, 49741-49749 [2012-20170]
Download as PDF
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
• Mail: Send comments to Docket
Operations, M–30; U.S. Department of
Transportation (DOT), 1200 New Jersey
Avenue SE., Room W12–140, West
Building Ground Floor, Washington, DC
20590–0001.
• Hand Delivery or Courier: Take
comments to Docket Operations in
Room W12–140 of the West Building
Ground Floor at 1200 New Jersey
Avenue SE., Washington, DC, between 9
a.m. and 5 p.m., Monday through
Friday, except Federal holidays.
• Fax: Fax comments to Docket
Operations at 202–493–2251.
Privacy: We will post all comments
we receive, without change, to https://
www.regulations.gov, including any
personal information the commenter
provides. Using the search function of
the docket Web site, anyone can find
and read the electronic form of all
comments received into any FAA
docket, including the name of the
individual sending the comment (or
signing the comment for an association,
business, labor union, etc.). DOT’s
complete Privacy Act Statement can be
found in the Federal Register published
on April 11, 2000 (65 FR 19477–19478),
as well as at https://DocketsInfo.dot.gov.
Docket: Background documents or
comments received may be read at
https://www.regulations.gov at any time.
Follow the online instructions for
accessing the docket or Docket
Operations in Room W12–140 of the
West Building Ground Floor at 1200
New Jersey Avenue SE., Washington,
DC, between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
James M. Crotty, ARM–205, Office of
Rulemaking, Federal Aviation
Administration, 800 Independence
Avenue SW., Washington, DC 20591,
telephone (202) 267–9456; email
James.M.Crotty@faa.gov.
See the
‘‘Additional Information’’ section in the
NPRM (77 FR 30054) for further
information on how to comment on the
proposals in the NPRM and how the
FAA will handle comments received.
The ‘‘Additional Information’’ section
also contains related information about
the docket, privacy, and the handling of
proprietary or confidential business
information. In addition, there is
information on obtaining copies of
related rulemaking documents.
erowe on DSK2VPTVN1PROD with PROPOSALS-1
SUPPLEMENTARY INFORMATION:
Background
On May 21, 2012, the FAA issued
Notice No. 12–03, entitled ‘‘Repair
Stations’’ (77 FR 30054). Comments to
that document were to be received on or
before August 20, 2012.
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
By letter dated August 3, 2012, nine
associations representing a large crosssection of the aviation industry jointly
requested that the FAA extend the
comment period for 90 days
(Aeronautical Repair Station
Association, Aerospace Industries
Association, Aircraft Electronics
Association, Aircraft Owners and Pilots
Association, Airlines for America,
Helicopter Association International,
National Air Carrier Association,
National Air Transportation
Association, and Regional Airline
Association). The petitioners stated that
good cause and need for an extended
comment period arises from the scope
and extent of the proposed changes,
coupled with the effects it will have
between and among individual
companies represented by the
petitioners. Further, the petitioners
noted that many repair stations are
small businesses which do not have
departments or personnel dedicated to
reviewing regulatory changes. As such,
they may not be aware of the proposals,
and the petitioners need more time to
reach these small businesses and gather
their input. Finally, the petitioners
stated that more time is needed to
consolidate its members’ comments and
coordinate these comments among the
group.
The FAA agrees with the petitioners’
request for an extension of the comment
period. We recognize the NPRM’s
contents are significant and complex.
Further, we understand that it is the
intention of the petitioners to continue
to canvass their members for comments,
and to coordinate and consolidate the
additional comments.
Absent unusual circumstances, the
FAA does not anticipate any further
extension of the comment period for
this rulemaking.
Extension of Comment Period
In accordance with § 11.47(c) of Title
14, Code of Federal Regulations, the
FAA has reviewed the joint petition
made by the nine associations for
extension of the comment period to
Notice No. 12–03. These petitioners
have shown a substantive interest in the
proposed rule and good cause for the
extension. The FAA has determined that
extension of the comment period is
consistent with the public interest, and
that good cause exists for taking this
action.
Accordingly, the comment period for
Notice No. 12–03 is extended to
November 19, 2012.
PO 00000
Frm 00003
Fmt 4702
Sfmt 4702
49741
Issued in Washington, DC, on August 13,
2012.
Brenda D. Courtney,
Acting Director, Office of Rulemaking.
[FR Doc. 2012–20277 Filed 8–16–12; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF LABOR
Occupational Safety and Health
Administration
29 CFR Part 1926
[Docket ID–OSHA–2007–0066]
RIN 1218–AC61
Cranes and Derricks in Construction:
Demolition and Underground
Construction
Occupational Safety and Health
Administration (OSHA), Labor.
ACTION: Notice of proposed rulemaking.
AGENCY:
On August 9, 2010, OSHA
issued a final standard updating the
requirements for cranes and derricks
used in construction work. For most
construction work, the final rule
replaced a prior cranes and derricks
standard. However, the prior standard
continues to apply to demolition and
underground construction work.
Through this proposed rule, OSHA is
proposing to apply the updated
requirements to that work. With this
proposed rule, OSHA also is proposing
to correct inadvertent errors made to the
demolition and underground
construction standards when it issued
the final rule for cranes and derricks in
construction.
DATES: Submit comments to this
proposed rule, including comments to
the information-collection (paperwork)
determination (described under the
section titled AGENCY
DETERMINATIONS), hearing requests,
and other information by September 17,
2012. All submissions must bear a
postmark or provide other evidence of
the submission date.
ADDRESSES: Submit comments, hearing
requests, and other material, identified
by Docket No. OSHA–2007–0066, by
any of the following methods:
Electronically: Submit comments and
attachments, as well as hearing requests
and other information, electronically at
https://www.regulations.gov, which is
the Federal e-Rulemaking Portal. Follow
the instructions online for submitting
comments. Please note that this docket
may include several different Federal
Register notices involving active
rulemakings, so selecting the correct
notice or its ID number when submitting
SUMMARY:
E:\FR\FM\17AUP1.SGM
17AUP1
erowe on DSK2VPTVN1PROD with PROPOSALS-1
49742
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
comments for this rulemaking is
extremely important. After accessing the
docket (OSHA–2007–0066), look for the
name of this rulemaking (Cranes and
Derricks in Construction: Demolition
and Underground Construction) in the
column labeled ‘‘Title.’’
Facsimile: OSHA allows facsimile
transmission of comments that are 10
pages or fewer in length (including
attachments). Fax these documents to
the OSHA Docket Office at (202) 693–
1648. OSHA does not require hard
copies of these documents. Instead of
transmitting facsimile copies of
attachments that supplement these
documents (e.g., studies, journal
articles), commenters must submit these
attachments to the OSHA Docket Office,
Technical Data Center, Room N–2625,
OSHA, U.S. Department of Labor, 200
Constitution Ave. NW., Washington, DC
20210. These attachments must clearly
identify the sender’s name, the date,
subject, the title of the rulemaking
(Cranes and Derricks in Construction:
Demolition and Underground
Construction) and the docket number
(OSHA–2007–0066) so that the Docket
Office can attach them to the
appropriate document.
Regular mail, express delivery, hand
(courier) delivery, and messenger
service: Submit comments and any
additional material to the OSHA Docket
Office, RIN No. 1218–AC61, Technical
Data Center, Room N–2625, OSHA, U.S.
Department of Labor, 200 Constitution
Ave. NW., Washington, DC 20210;
telephone: (202) 693–2350. (OSHA’s
TTY number is (877) 889–5627). Contact
the OSHA Docket Office for information
about security procedures concerning
delivery of materials by express
delivery, hand delivery, and messenger
service. The Docket Office will accept
deliveries (express delivery, hand
delivery, messenger service) during the
Docket Office’s normal business hours,
8:15 a.m. to 4:45 p.m., E.T.
Instructions: All submissions must
include the Agency’s name, the title of
the rulemaking (Cranes and Derricks in
Construction: Demolition and
Underground Construction), and the
docket number (i.e., OSHA Docket No.
OSHA–2007–0066). OSHA will place
comments and other material, including
any personal information, in the public
docket without revision, and the
comments and other material will be
available online at https://
www.regulations.gov. Therefore, OSHA
cautions commenters about submitting
statements they do not want made
available to the public, or submitting
comments that contain personal
information (either about themselves or
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
others) such as Social Security numbers,
birth dates, and medical data.
Docket: To read or download
comments or other material in the
docket, go to https://www.regulations.gov
or to the OSHA Docket Office at the
above address. The electronic docket for
this proposed rule established at
https://www.regulations.gov lists most of
the documents in the docket. However,
some information (e.g., copyrighted
material) is not available publicly to
read or download through this Web site.
All submissions, including copyrighted
material, are available for inspection at
the OSHA Docket Office. Contact the
OSHA Docket Office for assistance in
locating docket submissions.
FOR FURTHER INFORMATION CONTACT:
General information and press
inquiries: Mr. Frank Meilinger, OSHA
Office of Communications, Room N–
3647, U.S. Department of Labor, 200
Constitution Avenue NW., Washington,
DC 20210; telephone: (202) 693–1999.
Technical inquiries: Mr. Garvin
Branch, Directorate of Construction,
Room N–3468, OSHA, U.S. Department
of Labor, 200 Constitution Avenue NW.,
Washington, DC 20210; telephone: (202)
693–2020; fax: (202) 693–1689.
Copies of this Federal Register notice
and news releases: Electronic copies of
these documents are available at
OSHA’s Web page at https://
www.osha.gov.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Request for Comment
II. Direct Final Rulemaking
III. Discussion of Amendments
A. Background
B. Demolition Work
C. Underground Construction
D. Rationale for Extending Subpart CC to
Demolition and Underground
Construction
IV. Agency Determinations
A. Final Economic Analysis and Final
Regulatory Flexibility Analysis
B. Paperwork Reduction Act of 1995
C. Federalism
D. State Plan States
E. Unfunded Mandates Reform Act
F. Consultation and Coordination With
Indian Tribal Governments
G. Legal Considerations
List of Subjects in 29 CFR Part 1926
Authority and Signature
Amendments to Standards
I. Request for Comment
OSHA requests comment on all issues
related to the proposed rule, including
economic, paperwork, or other
regulatory impacts of this rule on the
regulated community. If OSHA receives
no significant adverse comment to
either this proposal or the companion
PO 00000
Frm 00004
Fmt 4702
Sfmt 4702
direct final rule, OSHA will publish a
Federal Register document confirming
the effective date of the direct final rule
and withdrawing this companion
proposed rule. Such confirmation may
include minor stylistic or technical
changes to the document. For the
purpose of judicial review, OSHA
considers the date of confirmation of the
effective date of the direct final rule as
the date of promulgation.
II. Direct Final Rulemaking
In direct final rulemaking, an agency
publishes a direct final rule in the
Federal Register with a statement that
the rule will become effective unless the
agency receives significant adverse
comment within a specified period. The
agency may publish an identical
proposed rule at the same time. If the
agency receives no significant adverse
comment in response to the direct final
rule, the agency typically confirms the
effective date of a direct final rule
through a separate Federal Register
notice. If the agency receives a
significant adverse comment, the agency
withdraws the direct final rule and
treats such comment as a response to
the proposed rule. An agency uses
direct final rulemaking when it
anticipates that a rule will not be
controversial.
OSHA is publishing a companion
direct final rule along with this
proposed rule in the ‘‘Final Rules’’
section of today’s Federal Register. For
purposes of this proposed rule and the
companion direct final rule, a
significant adverse comment is one that
explains why the amendments to
OSHA’s underground construction and
demolition standards would be
inappropriate. In determining whether a
comment necessitates withdrawal of the
direct final rule, OSHA will consider
whether the comment raises an issue
serious enough to warrant a substantive
response in a notice-and-comment
process. OSHA will not consider a
comment recommending an additional
amendment to be a significant adverse
comment unless the comment states
why the direct final rule would be
ineffective without the addition.
The comment period for the direct
final rule runs concurrently with that of
this proposed rule. OSHA will treat
comments received on the companion
direct final rule as comments regarding
the proposed rule. OSHA also will
consider significant adverse comment
submitted to this proposed rule as
comment to the companion direct final
rule. If OSHA receives a significant
adverse comment on either the direct
final rule or this proposed rule, it will
publish a timely withdrawal of the
E:\FR\FM\17AUP1.SGM
17AUP1
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
companion direct final rule and proceed
with this proposed rule. In the event
OSHA withdraws the direct final rule
because of significant adverse comment,
OSHA will consider all timely
comments received in response to the
direct final rule when it continues with
the proposed rule. After carefully
considering all comments to the direct
final rule and the proposal, OSHA will
decide whether to publish a new final
rule.
OSHA determined that the subject of
this rulemaking is suitable for direct
final rulemaking. Under the final rule
for cranes and derricks in construction,
most construction work involving
cranes and derricks falls under new
subpart CC of 29 CFR 1926, but
underground construction and
demolition remain covered under the
former rule (i.e., § 1926.550). These
proposed amendments will result in the
new subpart CC covering all
construction operations, thereby
improving worker safety because the
new rule provides better protection to
workers than the former rule. Moreover,
these proposed amendments will
facilitate employer compliance by
having all construction operations
involving cranes and derricks subject to
a single rule rather than by having a few
operations subject to a different rule. In
addition, this proposed (and the direct
final) rule corrects inadvertent errors
made to the standards for underground
construction and demolition when
OSHA issued the final cranes rule.
Therefore, OSHA does not expect
objections from the public to this
rulemaking action. Accordingly, the
Agency believes the regulated
community will welcome this effort to
harmonize the requirements regulating
crane and derrick operations in
underground construction and
demolition, and to remove errors that
hinder interpretation and proper
application of existing standards.
III. Discussion of Amendments
erowe on DSK2VPTVN1PROD with PROPOSALS-1
A. Background
OSHA designed the final rule for
cranes and derricks in construction,
codified at 29 CFR part 1926, subpart
CC, to replace the earlier rule
(§ 1926.550) for all construction work.1
In proposing the new cranes and
derricks rule, OSHA explained that the
rule’s purpose was ‘‘to protect
employees from the hazards associated
with hoisting equipment when used to
perform construction activities’’ (73 FR
59714). Because OSHA developed the
1 OSHA published the final rule at 75 FR 47906
(Aug. 9, 2010).
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
new rule to supplant the former rule
entirely, OSHA proposed to remove and
reserve § 1926.550 (73 FR 59915). When
other OSHA construction standards
referred to § 1926.550 directly, or
indirectly, as part of subpart N, OSHA
proposed to amend those provisions to
refer instead to the new requirements in
subpart CC (73 FR 59914–15).
In the proposed rule for cranes and
derricks in construction, OSHA
inadvertently did not propose to amend
three provisions that referred to subpart
N and encompassed the requirements of
§ 1926.550. These provisions included
two provisions applicable to demolition
work (§ 1926.856(c) and § 1926.858(b)),
and one provision applicable to
underground construction work
(§ 1926.800(t)). When it issued the final
rule, OSHA noted concerns about
potentially inadequate notice to the
public regarding any effort to amend
these provisions in the final rule;
consequently, OSHA decided not to
amend these provisions in the final rule.
OSHA instead stated that it would
revisit the issue later (75 FR 47920–21).
Having removed the requirements of
§ 1926.550 in the final rule, OSHA had
to reestablish the substance of the
demolition and underground
construction provisions in a new
subpart DD in the final rule, redesignate
§ 1926.550 as § 1926.1501 of subpart
DD, and amend the demolition and
underground construction provisions
that previously referred to subpart N to
refer instead to the new subpart DD.
OSHA provided in § 1926.1500 of
subpart DD that ‘‘[t]his subpart applies
in lieu of § 1926 subpart CC.’’ However,
in making these revisions, OSHA
inadvertently made changes to the
demolition and underground
construction provisions that modified
the meaning of these provisions. In
addition, the Code of Federal
Regulations eliminated all of the
subparagraphs of § 1926.800(t), except
for the introductory paragraph, because
of a technical error in the draft
regulatory language.
This proposed rule, therefore, will
accomplish two goals. First, it will bring
all crane and derrick use in construction
work under new subpart CC. Second, it
will correct the errors in the final rule
that substantively altered the demolition
and underground construction
provisions, and replace subparagraphs
§ 1926.800(t)(1) through (4). Below,
OSHA describes the amendments to the
demolition and underground
construction standards that OSHA made
in the final rule for cranes and derricks
in construction (including inadvertent
errors), as well as the revisions and
PO 00000
Frm 00005
Fmt 4702
Sfmt 4702
49743
corrections to these standards that
OSHA proposes.
B. Demolition Work
Before OSHA issued the final rule for
cranes and derricks in construction,
§ 1926.856(c) stated, ‘‘Mechanical
equipment used shall meet the
requirements specified in subparts N
and O of this part,’’ and § 1926.858(b)
read, ‘‘Cranes, derricks, and other
hoisting equipment used shall meet the
requirements specified in subpart N of
this part.’’ In the final rule for cranes
and derricks in construction, OSHA
established a new subpart DD,
redesignated the prior cranes and
derricks rule (§ 1926.550) as § 1926.1501
of subpart DD, and amended
§ 1926.856(c) to require compliance
with the new subpart DD, in addition to
the remaining requirements of subparts
N and O. OSHA also amended
§ 1926.858(b) to require compliance
with new subpart DD instead of subpart
N.
It was OSHA’s expressed purpose not
to make substantive revisions to the
requirements of these two sections in
the final rule.2 Nevertheless, OSHA
made an inadvertent substantive change
to § 1926.858(b).3 That section originally
incorporated all requirements of subpart
N for ‘‘cranes, derricks, and other
hoisting equipment,’’ not just the
requirements of subpart N’s cranes and
derricks standard at § 1926.550.
However, the final rule did not
reference other requirements of subpart
N that pertain to demolition work,
which include the requirements of
§ 1926.552 (Material hoists, personnel
hoists, and elevators) and § 1926.554
(Overhead hoists). As a result, the
amendment had the effect of deleting
the requirement for employers engaged
in demolition work to comply with
§§ 1926.552 and 1926.554. Therefore, to
cover all construction work under
subpart CC, and to correct these errors,
OSHA is proposing to amend
§§ 1926.856(c) and 1926.858(b) by
replacing the requirements to comply
with subpart DD with requirements to
comply with subpart CC, and is
proposing to amend § 1926.858(b) by
2 OSHA explained in the preamble to the final
rule that the ‘‘redesignation of § 1926.550 and the
replacement of references [to subpart N] do not alter
any of the substantive requirements of
§§ 1926.856(c) and 1926.858(b)’’ (75 FR 47921).
3 OSHA also inadvertently listed the heading of
§ 1926.858 as ‘‘Removal of walls, floors and
materials with equipment’’ (the same heading as
§ 1926.856), instead of ‘‘Removal of steel
construction,’’ but this erroneous heading did not
appear in the subsequent edition of the Code of
Federal Regulations (CFR). Therefore, OSHA finds
no need to address this error in this rulemaking.
E:\FR\FM\17AUP1.SGM
17AUP1
49744
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
erowe on DSK2VPTVN1PROD with PROPOSALS-1
reinstating the requirement to comply
with subpart N as well.
C. Underground Construction
Section 1926.800(t) contains
requirements for hoisting that are
unique to underground construction.
Before OSHA issued the final rule for
cranes and derricks in construction, the
previous version of § 1926.800(t)
contained an introductory paragraph
that cross-referenced other OSHA
standards that apply to hoisting in
underground construction; these crossreferences consisted of the requirements
of the prior cranes and derricks rule at
§ 1926.550, including most of
§ 1926.550(g) (the provision of the prior
rule that applied to hoisting personnel),
and requirements for material hoists,
personnel hoists, and elevators at
§ 1926.552(a) through (d). Previous
§ 1926.800(t) included one substantive
modification to the requirements of
prior § 1926.550(g)(2): employers could
use cranes to hoist employees for
routine access to underground worksites
via a shaft without showing that
conventional means would be more
hazardous, or not possible, for this
purpose due to structural design or
worksite conditions.4 When it issued
the underground construction rule,
OSHA included this modification
because hoisting personnel for routine
access to the underground worksites via
a shaft occurs under more controlled,
and less hazardous, conditions than
hoisting personnel in general (54 FR
23824, 23845). Previous § 1926.800(t)(1)
through (4) contained additional
requirements for hoisting unique to
underground construction. Language at
the beginning of the introductory
paragraph of § 1926.800(t), ‘‘Except as
modified by this paragraph (t),’’ clarified
that the requirements and exceptions in
1926.800(t)(1) through (4) take
precedence over the cross-referenced
requirements, including the former
cranes standard under § 1926.550.
In the final cranes rule, OSHA
redesignated the prior cranes and
derricks rule as § 1926.1501 of subpart
DD. It was OSHA’s expressed purpose to
preserve the existing crane requirements
for underground construction by
changing references in the introductory
paragraph of § 1926.800(t) from
§ 1926.550 and § 1926.500(g)(2) to
§ 1926.1501 and § 1926.1501(g)(2),
respectively. OSHA clarified this
purpose in the preamble to the final rule
by stating that the revisions to
4 Prior
§ 1926.550(g)(2) required employers to
show, before using cranes to hoist personnel to a
worksite, that conventional means would be more
hazardous than cranes, or not possible, due to
structural design or worksite conditions.
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
§ 1926.800(t) ‘‘do not alter any of the
substantive requirements of
§ 1926.800(t)’’ (75 FR 47920). However,
OSHA inadvertently changed
§ 1926.800(t) by amending the
introductory paragraph to require
employers engaged in underground
construction to comply only with new
§ 1926.1501(g) (which duplicated
§ 1926.550(g)), instead of preserving the
former routine-access exemption by
requiring compliance with § 1926.1501
in its entirety, and modifying the
requirements of § 1926.1501(g)(2)
(which duplicated former
§ 1926.550(g)(2)).5 Additionally, OSHA
inadvertently moved the language
‘‘Except as modified by paragraph (t)’’ to
the beginning of the second sentence of
the introductory paragraph so that it no
longer applied to the cross-referenced
§ 1926.1501 requirements, but instead
only applied to the cross-referenced
requirements in § 1926.552(a) through
(d). Finally, although OSHA did not
plan to alter any of the (then remaining)
requirements and exemptions of
§ 1926.800(t)(1) through (4), but only to
amend the introductory paragraph, a
technical error in the instructions to the
Federal Register resulted in the deletion
of subparagraphs § 1926.800(t)(1)
through (4). The deletion was not
mentioned in the preamble to the final
cranes rule.
As amended by the final cranes rule,
§ 1926.800(t) presents four problems.
First, the prior version of § 1926.800(t)
incorporated all of § 1926.550, not just
§ 1926.550(g). However, the amended
version of § 1926.800(t) refers only to
§ 1926.1501(g), the successor to
§ 1926.550(g). Therefore, as now
written, § 1926.800(t) does not explicitly
require employers to comply with either
the final cranes rule or the prior rule at
§ 1926.550, except for § 1926.1501(g),
the prior rule’s provision on hoisting
personnel. Second, the exception from
§ 1926.550(g)(2), specified in the former
version of § 1926.800(t), provided that
employers could use cranes to hoist
personnel for routine access to
underground worksites via a shaft
without showing that other means of
access are more hazardous or
impossible. OSHA did not include this
exception in the new version of
§ 1926.800(t). This inadvertent error
places an additional and unnecessary
burden on employers that use cranes for
this purpose. Third, moving the text
‘‘Except as modified by paragraph (t)’’ to
5 OSHA stated in the final rule that it was
including the reference to § 1926.1501(g) to avoid
any potential notice problem that may arise if
OSHA substituted a reference to subpart CC in
place of the prior reference to § 1926.550(g) (75 FR
47920).
PO 00000
Frm 00006
Fmt 4702
Sfmt 4702
the beginning of the second sentence of
the introductory paragraph of
§ 1926.800(t) results in ambiguity as to
the relationship between incorporated
crane requirements and the provisions
in § 1926.800(t)(1) through (4). Finally,
the inadvertent elimination of
§ 1926.800(t)(1) through (4) from the
Code of Federal Regulations resulted in
eliminating requirements that OSHA
adopted in a 1989 rulemaking (54 FR
23843) to ensure that employees
engaged in underground construction
receive adequate protection from
hazards unique to hoisting in this
setting.
In this proposed rule, OSHA is
proposing to amend § 1926.800(t) to
extend subpart CC to underground
construction, and to resolve the
technical errors set forth in this section.
OSHA is proposing to amend the
introductory paragraph of § 1926.800(t)
to restore the provision allowing
employers to use cranes to hoist
personnel for routine access to the
underground worksites via a shaft
without the need to show that
conventional means of access are more
hazardous or impossible for this
purpose. This amendment excepts
routine access of employees to an
underground worksite via a shaft from
the requirements of § 1926.1431(a). The
requirements of § 1926.1431(a) are
virtually identical to the requirements of
§ 1926.550(g)(2). In addition, OSHA is
proposing to amend § 1926.800(t) by
restoring the clause ‘‘Except as modified
by this paragraph (t)’’ to the beginning
of the introductory paragraph, and
restoring § 1926.800(t)(1) through (4).
OSHA is also proposing to revise the
language in the introductory paragraph
for clarity, and is proposing to correct
three minor grammatical errors that
appeared in the text of paragraphs
§ 1926.800(t)(3)(vi), (t)(4)(iii), and
(t)(4)(iv), as previously published in the
Code of Federal Regulations.
D. Rationale for Extending Subpart CC
to Demolition and Underground
Construction
The revisions made by this proposed
rule will enable OSHA to cover all
cranes and derricks used in construction
under subpart CC. These revisions
implement the original purpose of the
rule and will benefit both employees
and employers. These revisions would
ensure that the significant benefits of
subpart CC, which include saving 22
lives per year and preventing 175 nonfatal injuries per year compared to prior
§ 1926.550 (75 FR 48079), extend to
demolition and underground
construction. Accordingly, applying
subpart CC to demolition and
E:\FR\FM\17AUP1.SGM
17AUP1
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
underground construction will ensure
that construction workers in those
sectors receive the same safety
protections from new subpart CC as
other construction workers.
The revisions also will benefit
construction contractors that engage in
underground construction or demolition
work, in addition to other types of
construction work, because these
contractors will now be subject to a
single standard rather than having some
of their activities covered under subpart
CC and other work covered by subpart
DD. This action will avoid the confusion
that would result if new subpart CC
covers part of a project and revised
§ 1926.800(t) covers another part of the
project. For example, in a cut-and-cover
tunneling project, the underground
construction standard applies only after
covering the excavation in such a
manner as to establish conditions
characteristic of underground
construction. 29 CFR 1926.800(a).
Therefore, under the current
requirements, subpart CC would apply
to the work while the excavation is
open, but after covering the excavation,
subpart DD would apply, thereby
resulting in the same crane or derrick
being subject to different standards
during different phases of the project.
Finally, this action will facilitate
employer compliance because
demolition and underground
construction contractors will no longer
be subject to the outdated requirements
in prior § 1926.550, which relied
heavily on pre-1970 consensus
standards.
erowe on DSK2VPTVN1PROD with PROPOSALS-1
IV. Agency Determinations
A. Final Economic Analysis and Final
Regulatory Flexibility Analysis
When it issued the final cranes rule,
OSHA prepared a final economic
analysis (FEA) as required by the
Occupational Safety and Health Act of
1970 (OSH Act; 29 U.S.C. 651 et seq.)
and Executive Order 12866 (58 FR
51735). OSHA also published a Final
Regulatory Flexibility Analysis (FRFA)
as required by the Regulatory Flexibility
Act (5 U.S.C. 601–612). OSHA’s
approach to estimating costs and
economic impacts in these analyses
began by estimating, for all construction
sectors, the total number of cranes and
whether they were owned and rented;
owned without rental; or leased. As a
result, both analyses covered all cranes
engaged in construction activities,
including cranes engaged in
underground construction and cranes
engaged in construction work involving
demolition. The FEA for the final cranes
standard, which included all cranes,
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
crane operations, and industry sectors
subject to this proposed rule, found that
the requirements of the rule were
technologically and economically
feasible.
Because the FEA drew these
conclusions from calculations
encompassing all of the underground
construction and demolition crane
operations covered by this proposed
rule, the conclusions in the earlier FEA
are valid for this proposed rule. The
reference to the FEA for the final cranes
rule, therefore, establishes that this
proposed rule is technologically and
economically feasible, addresses
significant risks, and reduces those risks
significantly. The FEA, which OMB
reviewed, meets the requirements of
Executive Orders 12866 and Executive
Order 13563 with respect to the
operations covered by this proposed
rule; OSHA included these operations
in the FEA for the final cranes standard.
Therefore, OSHA believes that this
proposed rule also complies with
Executive Orders 12866 and Executive
Order 13563.
To determine if this proposed rule has
annual costs of greater than $100
million, or would have a significant
economic impact on a substantial
number of small firms, OSHA examined
the sectors most affected by this
proposed rule. This proposed rule
affects two construction sectors: NAICS
237990 (Other Heavy and Civil
Engineering Construction), which
includes all establishments engaged in
underground construction, and NAICS
238910 (Site Preparation Contractors),
which includes all establishments
engaged in demolition. This analysis,
therefore, reviews the results for these
two sectors reported in the final crane
standard’s FEA, which the Federal
Register published on August 9, 2010.
That FEA simply considered all
cranes and crane operations in these
sectors, and did not analyze separately
those operations involving underground
construction or demolitions because
OSHA planned to apply subpart CC to
these operations. OSHA will report here
the results for these entire sectors,
which will inevitably involve greater
costs and impacts than for the activities
addressed in this proposed rule because
both sectors have many cranes and
crane jobs that do not involve
underground construction or demolition
activities. Table B–9 of the FEA showed
that NAICS 237990, which includes all
crane operations involved in
underground construction operations,
had annualized compliance costs of
$1,903,569 for firms that own and rent
cranes, $205,532 for firms that own but
do not rent cranes, and $1,151,759 for
PO 00000
Frm 00007
Fmt 4702
Sfmt 4702
49745
firms that lease cranes, for total
annualized costs of $3,260,860 (75 FR
48102–48105). Table B–9 also showed
that NAICS 238910, which contains all
crane operations involving demolitions,
had annualized compliance costs of
$1,232,974 for firms that own and rent
cranes, $292,601 for firms that own but
do not rent cranes, and $1,626,463 for
firms that lease cranes, for total
annualized compliance costs of
$3,152,038. The total annualized
compliance costs for both sectors are
$6,412,898. Because these two NAICS
sectors include operations not involved
in underground construction or
demolition, the total estimated
annualized compliance costs of
$6,412,898 for these two sectors will be
greater than the actual costs of this
proposed rule. Based on these costs,
OSHA concludes that this proposed rule
is not a significant rule under either
E.O. 12866 or the Unfunded Mandates
Act.
With respect to technological
feasibility, the earlier FEA, which
included consideration of both
underground construction and
demolition operations, noted:
In accordance with the OSH Act, OSHA is
required to demonstrate that occupational
safety and health standards promulgated by
the Agency are technologically feasible.
Accordingly, OSHA reviewed the
requirements that would be imposed by the
final regulation, and assessed their
technological feasibility. As a result of this
review, OSHA has determined that
compliance with the requirements of the
final standard is technologically feasible for
all affected industries. The standard would
require employers to perform crane
inspections, utilize qualified or certified
crane operators, address ground conditions,
maintain safe distances from power lines
using the encroachment prevention
precautions, and to fulfill other obligations
under the standard. Compliance with all of
these requirements can be achieved with
readily and widely available technologies.
Some businesses in the affected industries
already implement the requirements of the
standard to varying degrees (some states have
requirements), as noted during the SBREFA
Panel. OSHA believes that there are no
technological constraints in complying with
any of the proposed requirements, and
received no comments that suggested that
these standards were technologically
infeasible.
(75 FR 48095).
In Table B–12 of the FEA for the final
cranes rule, OSHA examined the costs
as a percentage of revenues and as a
percentage of profits in these two
sectors. This table shows that, for both
sectors, the greatest potential impacts
were on establishments that own and
rent cranes with operators. This table
showed that for NAICS 237990, which
E:\FR\FM\17AUP1.SGM
17AUP1
49746
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
includes all underground construction
operations, costs were 0.18 percent (less
than 1 percent) of revenues and 3.54
percent of profits. This table also
showed that for NAICS 238910,
including all demolition operations
involving cranes, costs were 0.18
percent of revenues and 4.05 percent of
profits. (Table B–12 and the FEA as a
whole provide the full calculations and
derivations.) The FEA from the final
cranes standard stated:
erowe on DSK2VPTVN1PROD with PROPOSALS-1
The Agency concludes that the final
standard is economically feasible for the
affected industries. As described above, a
standard is economically feasible if there is
a reasonable likelihood that the estimated
costs of compliance ‘‘will not threaten the
existence or competitive structure of an
industry, even if it does portend disaster for
some marginal firms.’’ United Steelworkers of
America v. Marshall, 647 F.2d 1189, 1272
(D.C. Cir. 1980). The potential impacts on
employer costs associated with achieving
compliance with the final standard fall well
within the bounds of economic feasibility in
each industry sector. Costs of 0.2 percent of
revenues and 4 percent of profits will not
threaten the existence of the construction
industry, affected general industry sectors, or
the use of cranes in affected industry sectors.
OSHA does not expect compliance with the
requirements of the final standard to threaten
the viability of employers or the competitive
structure of any of the affected industry
sectors. When viewed in the larger context of
the construction sector, an increase in costs
of $148.2 million a year is effectively
negligible, and will have no noticeable effect
on the demand for construction services.
Even when viewed as an increase in the costs
of using cranes, an increase in the cost of
rentals services of 0.2 percent will not cause
the construction industry to forego the use of
cranes and, thus, put crane leasing firms out
of business.
(75 FR 48112). Because the earlier FEA
drew this conclusion with respect to
costs that included the costs of this
proposed rule, as well as other costs that
made the impacts greater than those of
this proposed rule, OSHA concludes
that the FEA for the cranes and derricks
final rule demonstrates that this
proposed rule is economically feasible.
Tables B–14 and B–15 of the FEA for
the cranes and derricks final rule
examined the costs as a percentage of
revenues and as a percentage of profits
in these two sectors for small firms as
defined by SBA, and very small entities
with less than 20 employees,
respectively. Because so many firms
owning cranes are small, there is no
appreciable difference between the
impacts on small and very small firms
versus the impacts for all firms already
discussed. Comparison of the two tables
shows that, for NAICS 237990, the
impacts for very small firms were equal
to or greater than those for small firms.
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
Table B–15 shows that, for NAICS
237990, costs were 0.18 percent of
revenues and 3.54 percent of profits.
This table also shows that, for NAICS
238910, including all demolition
operations involving cranes, there were
no very small entities that owned and
rented cranes, with the result that the
greatest impacts are for small entities
that own and rent crane where costs are
0.18 percent of revenues and 4.05
percent of profits.
In its regulatory flexibility analysis,
OSHA generally defines a significant
economic impact on small entities as
one with costs in excess of one percent
of revenues or five percent of profits.
The possible costs of this proposed rule
clearly are well below these thresholds.
OSHA, therefore, certifies that this
proposed rule will not have a significant
economic impact on a substantial
number of small entities.
B. Paperwork Reduction Act of 1995
When OSHA issued the final rule on
August 9, 2010, it submitted an
Information Collection Request (ICR) to
the Office of Management and Budget
(OMB) titled Cranes and Derricks in
Construction (29 CFR Part 1926,
Subpart CC). This ICR 6 covered all
establishments in the construction
industry, including all of the
establishments in NAICS 237990 and
NAICS 238910. On November 1, 2010,
OMB approved the ICR under OMB
control number 1218–0261, with an
expiration date of November 30, 2013.
Subsequently, in December 2010, OSHA
discontinued the Cranes and Derricks
Standard for Construction (29 CFR
1926.550) ICR (OMB Control Number
1218–0113) because the new ICR
superseded the existing ICR. In
addition, OSHA retitled the new ICR to
Cranes and Derricks in Construction (29
CFR Part 1926, Subpart CC and Subpart
DD).7
This proposed rule requires no
additional collection of information.8
6 The ICR is part of Exhibit 0425 in the docket for
the final rule on cranes and derricks in construction
(OSHA–2007–0066). It is available at
www.regulations.gov and at www.reginfo.gov (OMB
Control Number 1218–0261).
7 The request and OMB approval for
discontinuing the previous Cranes and Derricks in
Construction ICR (OMB Control Number 1218–
0113) and the retitling of the ICR are available at
www.reginfo.gov.
8 Although the final rule for cranes and derricks
in construction did not require employers covered
by subpart DD to meet the information-exchange
requirements of subpart CC, OSHA did not subtract
these employers from its analysis of the burden and
costs for these requirements in the paperwork
analysis for subpart CC. Therefore, this approach
inflated the burden and costs estimates of the ICR
approved by OMB for subpart CC; however, the
burden and costs estimates are accurate now that
PO 00000
Frm 00008
Fmt 4702
Sfmt 4702
OMB’s approval of OSHA’s ICR under
Control Number 1218–0261 already
covers all collections of information
required by this proposed rule, and
OSHA does not believe it is necessary
to submit a new ICR to OMB seeking to
collect additional information under
this proposed rule.
Interested parties who comment on
OSHA’s determination that this
proposal contains no additional
paperwork requirements must send
their written comments to the Office of
Management and Budget, Attn: OMB
Desk Officer for OSHA, Room 10235,
726 Jackson Place, NW., Washington,
DC 20503. OSHA also encourages
commenters to submit their comments
on this paperwork determination to it,
along with their other comments on the
proposed rule.
OSHA notes that a Federal agency
cannot conduct or sponsor a collection
of information unless OMB approves it
under the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.), and the
agency displays a currently valid OMB
control number. The public need not
respond to a collection of information
requirement unless the agency displays
a currently valid OMB control number,
and, notwithstanding any other
provision of law, no person shall be
subject to a penalty for failing to comply
with a collection of information
requirement if the requirement does not
display a currently valid OMB control
number.
C. Federalism
OSHA reviewed this proposed rule in
accordance with the Executive Order on
Federalism (Executive Order 13132, 64
FR 43255, August 10, 1999), which
requires that Federal agencies, to the
extent possible, refrain from limiting
state policy options, consult with states
prior to taking any actions that would
restrict state policy options, and take
such actions only when clear
constitutional authority exists and the
problem is national in scope. Executive
Order 13132 provides for preemption of
state law only with the expressed
consent of Congress. Federal agencies
must limit any such preemption to the
extent possible.
Under Section 18 of the OSH Act,
Congress expressly provides that states
may adopt, with Federal approval, a
plan for the development and
enforcement of occupational safety and
health standards. States that obtain
Federal approval for such a plan are
referred to as ‘‘State Plan States.’’
Occupational safety and health
OSHA is applying subpart CC to underground
construction and demolition work.
E:\FR\FM\17AUP1.SGM
17AUP1
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
erowe on DSK2VPTVN1PROD with PROPOSALS-1
standards developed by State Plan
States must be at least as effective in
providing safe and healthful
employment and places of employment
as the Federal standards. 29 U.S.C. 667.
Subject to these requirements, State
Plan States are free to develop and
enforce under state law their own
requirements for safety and health
standards.
OSHA previously concluded from its
analysis that promulgation of subpart
CC complies with Executive Order
13132. 75 FR 48128–29. That analysis
applies to the extension of subpart CC
to establishments engaged in demolition
work and underground construction;
therefore, this proposed rule complies
with Executive Order 13132. In states
without an OSHA-approved State Plan,
any standard developed from this
proposed rule would limit state policy
options in the same manner as every
standard promulgated by OSHA. In
states with OSHA-approved State Plans,
this rulemaking does not significantly
limit state policy options.
D. State Plan States
When Federal OSHA promulgates a
new standard or more stringent
amendment to an existing standard,
State Plan States must amend their
standards to reflect the new standard or
amendment, or show OSHA why such
action is unnecessary, e.g., because an
existing state standard covering this area
is ‘‘at least as effective’’ as the new
Federal standard or amendment. 29 CFR
1953.5(a). The state standard must be at
least as effective as the final Federal
rule. State Plan States must adopt the
Federal standard or complete their own
standard within six months of the
promulgation date of the final Federal
rule. When OSHA promulgates a new
standard or amendment that does not
impose additional or more stringent
requirements than an existing standard,
State Plan States are not required to
amend their standards, although OSHA
may encourage them to do so. The 27
states and U.S. territories with OSHAapproved occupational safety and health
plans are: Alaska, Arizona, California,
Hawaii, Indiana, Iowa, Kentucky,
Maryland, Michigan, Minnesota,
Nevada, New Mexico, North Carolina,
Oregon, Puerto Rico, South Carolina,
Tennessee, Utah, Vermont, Virginia,
Washington, and Wyoming;
Connecticut, Illinois, New Jersey, New
York, and the Virgin Islands have
OSHA-approved State Plans that apply
to state and local government employees
only.
The amendments in this proposed
rule will result in more stringent
requirements for cranes and derricks
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
used in demolition and underground
construction work. Therefore, when
OSHA promulgates a new final rule,
states and territories with approved
State Plans must adopt comparable
amendments to their standards for
cranes and derricks used in demolition
and underground construction within
six months of OSHA’s promulgation of
the final rule (i.e., the date OSHA
publishes confirmation of the effective
date) unless they demonstrate that such
a change is not necessary because their
existing standards are already the same,
or at least as effective, as OSHA’s new
final rule.
E. Unfunded Mandates Reform Act
When OSHA issued the final rule for
cranes and derricks in construction, it
reviewed the rule according to the
Unfunded Mandates Reform Act of 1995
(UMRA; 2 U.S.C. 1501 et seq. (58 FR
58093)), and Executive Order 12875 (75
FR 48130). OSHA concluded that the
final rule did not meet the definition of
a ‘‘Federal intergovernmental mandate’’
under the UMRA because OSHA
standards do not apply to state or local
governments except in states that have
voluntarily adopted State Plans. OSHA
further noted that the rule imposed
costs of over $100 million per year on
the private sector and, therefore,
required review under the UMRA for
those costs, but that its final economic
analysis met that requirement.
As discussed above in Section IV.A
(Final Economic Analysis and Final
Regulatory Flexibility Analysis) of this
preamble, this proposed rule does not
impose any costs on private-sector
employers beyond those costs already
taken into account in the final rule for
cranes and derricks in construction.
Because OSHA reviewed the total costs
of this final rule under the UMRA, no
further review of those costs is
necessary. Therefore, for the purposes of
the UMRA, OSHA certifies that this
proposed rule does not mandate that
state, local, or tribal governments adopt
new, unfunded regulatory obligations,
or increase expenditures by the private
sector of more than $100 million in any
year.
F. Consultation and Coordination With
Indian Tribal Governments
OSHA reviewed this proposed rule in
accordance with Executive Order 13175
(65 FR 67249) and determined that it
does not have ‘‘tribal implications’’ as
defined in that order. As proposed, the
rule does not have substantial direct
effects on one or more Indian tribes, on
the relationship between the Federal
government and Indian tribes, or on the
distribution of power and
PO 00000
Frm 00009
Fmt 4702
Sfmt 4702
49747
responsibilities between the Federal
government and Indian tribes.
G. Legal Considerations
The purpose of the Occupational
Safety and Health Act of 1970 (29 U.S.C.
651 et seq.) is ‘‘to assure so far as
possible every working man and woman
in the nation safe and healthful working
conditions and to preserve our human
resources.’’ 29 U.S.C. 651(b). To achieve
this goal, Congress authorized the
Secretary of Labor to promulgate and
enforce occupational safety and health
standards. 29 U.S.C. 654(b), 655(b). A
safety or health standard is a standard
‘‘which requires conditions, or the
adoption or use of one or more
practices, means, methods, operations,
or processes, reasonably necessary or
appropriate to provide safe or healthful
employment or places of employment.’’
29 U.S.C. 652(8). A standard is
reasonably necessary or appropriate
within the meaning of Section 652(8)
when a significant risk of material harm
exists in the workplace and the standard
would substantially reduce or eliminate
that workplace risk. See Industrial
Union Department, AFL–CIO v.
American Petroleum Institute, 448 U.S.
607 (1980). In the cranes and derricks
final rule, OSHA made such a
determination with respect to the use of
cranes and derricks in construction at
the same time that it noted that the
Agency would apply subpart CC to the
activities addressed in this proposed
rule (75 FR 47913, 47920–21).
This proposed rule will not reduce
the employee protections put into place
by the standard OSHA is updating
under this rulemaking. Instead, this
rulemaking likely will enhance
employee safety by ensuring that the
construction workers involved in
demolition and underground
construction receive the same safety
protections from recently published
subpart CC as other construction
workers. The revisions also will benefit
construction contractors that engage in
underground construction or demolition
work in addition to other types of
construction work, because these
contractors will now be subject to a
single standard rather than having some
of their construction work under
subpart CC, and other work covered by
existing subpart DD. This action,
therefore, will clarify employer
obligations by avoiding the confusion
that would result if subpart CC covers
part of a project and existing subpart DD
covers another part of the project.
Accordingly, it is unnecessary to make
a separate determination of significant
risk, or the extent to which this rule
would reduce that risk, as typically
E:\FR\FM\17AUP1.SGM
17AUP1
49748
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
required by Industrial Union
Department.
List of Subjects in 29 CFR Part 1926
Construction industry, Demolition,
Occupational safety and health, Safety,
Underground construction.
Authority and Signature
David Michaels, Ph.D., MPH,
Assistant Secretary of Labor for
Occupational Safety and Health, U.S.
Department of Labor, 200 Constitution
Ave. NW., Washington, DC 20210,
authorized the preparation of this
notice. OSHA is issuing this proposed
rule under the following authorities: 29
U.S.C. 653, 655, 657; 40 U.S.C. 3701 et
seq.; 5 U.S.C. 553; Secretary of Labor’s
Order No. 1–2012 (77 FR 3912, Jan. 25,
2012); and 29 CFR part 1911.
Signed at Washington, DC, on August 8,
2012.
David Michaels,
Assistant Secretary of Labor for Occupational
Safety and Health.
Amendments to Standards
For the reasons stated in the preamble
of this proposed rule, OSHA proposes to
amend 29 CFR part 1926 as follows:
PART 1926—[AMENDED]
Subpart S—Underground
Construction, Caissons, Cofferdams,
and Compressed Air
1. Revise the authority citation for
subpart S of 29 CFR part 1926 to read
as follows:
Authority: 40 U.S.C. 3701; 29 U.S.C. 653,
655, 657; and Secretary of Labor’s Orders 12–
71 (36 FR 8754), 8–76 (41 FR 25059), 9–83
(48 FR 35736), 1–90 (55 FR 9033), 6–96 (62
FR 111), 5–2007 (72 FR 31159), or 1–2012 (77
FR 3912), as applicable.
2. Amend § 1926.800 by revising
paragraph (t) to read as follows:
§ 1926.800
Underground construction.
erowe on DSK2VPTVN1PROD with PROPOSALS-1
*
*
*
*
*
(t) Hoisting unique to underground
construction. Except as modified by this
paragraph (t), employers must: comply
with the requirements of subpart CC of
this part, except that the limitation in
§ 1926.1431(a) does not apply to the
routine access of employees to an
underground worksite via a shaft;
ensure that material hoists comply with
§ 1926.552(a) and (b) of this part; and
ensure that personnel hoists comply
with the personnel-hoists requirements
of § 1926.552(a) and (c) of this part and
the elevator requirements of
§ 1926.552(a) and (d) of this part.
(1) General requirements for cranes
and hoists. (i) Materials, tools, and
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
supplies being raised or lowered,
whether within a cage or otherwise,
shall be secured or stacked in a manner
to prevent the load from shifting,
snagging or falling into the shaft.
(ii) A warning light suitably located to
warn employees at the shaft bottom and
subsurface shaft entrances shall flash
whenever a load is above the shaft
bottom or subsurface entrances, or the
load is being moved in the shaft. This
paragraph does not apply to fully
enclosed hoistways.
(iii) Whenever a hoistway is not fully
enclosed and employees are at the shaft
bottom, conveyances or equipment shall
be stopped at least 15 feet (4.57 m)
above the bottom of the shaft and held
there until the signalman at the bottom
of the shaft directs the operator to
continue lowering the load, except that
the load may be lowered without
stopping if the load or conveyance is
within full view of a bottom signalman
who is in constant voice communication
with the operator.
(iv)(A) Before maintenance, repairs, or
other work is commenced in the shaft
served by a cage, skip, or bucket, the
operator and other employees in the
area shall be informed and given
suitable instructions.
(B) A sign warning that work is being
done in the shaft shall be installed at the
shaft collar, at the operator’s station,
and at each underground landing.
(v) Any connection between the
hoisting rope and the cage or skip shall
be compatible with the type of wire rope
used for hoisting.
(vi) Spin-type connections, where
used, shall be maintained in a clean
condition and protected from foreign
matter that could affect their operation.
(vii) Cage, skip, and load connections
to the hoist rope shall be made so that
the force of the hoist pull, vibration,
misalignment, release of lift force, or
impact will not disengage the
connection. Moused or latched openthroat hooks do not meet this
requirement.
(viii) When using wire rope wedge
sockets, means shall be provided to
prevent wedge escapement and to
ensure that the wedge is properly
seated.
(2) Additional requirements for
cranes. Cranes shall be equipped with a
limit switch to prevent overtravel at the
boom tip. Limit switches are to be used
only to limit travel of loads when
operational controls malfunction and
shall not be used as a substitute for
other operational controls.
(3) Additional requirements for hoists.
(i) Hoists shall be designed so that the
load hoist drum is powered in both
directions of rotation, and so that brakes
PO 00000
Frm 00010
Fmt 4702
Sfmt 4702
are automatically applied upon power
release or failure.
(ii) Control levers shall be of the
‘‘deadman type’’ which return
automatically to their center (neutral)
position upon release.
(iii) When a hoist is used for both
personnel hoisting and material
hoisting, load and speed ratings for
personnel and for materials shall be
assigned to the equipment.
(iv) Material hoisting may be
performed at speeds higher than the
rated speed for personnel hoisting if the
hoist and components have been
designed for such higher speeds and if
shaft conditions permit.
(v) Employees shall not ride on top of
any cage, skip or bucket except when
necessary to perform inspection or
maintenance of the hoisting system, in
which case they shall be protected by a
body belt/harness system to prevent
falling.
(vi) Personnel and materials (other
than small tools and supplies secured in
a manner that will not create a hazard
to employees) shall not be hoisted
together in the same conveyance.
However, if the operator is protected
from the shifting of materials, then the
operator may ride with materials in
cages or skips which are designed to be
controlled by an operator within the
cage or skip.
(vii) Line speed shall not exceed the
design limitations of the systems.
(viii) Hoists shall be equipped with
landing level indicators at the operator’s
station. Marking the hoist rope does not
satisfy this requirement.
(ix) Whenever glazing is used in the
hoist house, it shall be safety glass, or
its equivalent, and be free of distortions
and obstructions.
(x) A fire extinguisher that is rated at
least 2A:10B:C (multi-purpose, dry
chemical) shall be mounted in each
hoist house.
(xi) Hoist controls shall be arranged so
that the operator can perform all
operating cycle functions and reach the
emergency power cutoff without having
to reach beyond the operator’s normal
operating position.
(xii) Hoists shall be equipped with
limit switches to prevent overtravel at
the top and bottom of the hoistway.
(xiii) Limit switches are to be used
only to limit travel of loads when
operational controls malfunction and
shall not be used as a substitute for
other operational controls.
(xiv) Hoist operators shall be provided
with a closed-circuit voice
communication system to each landing
station, with speaker microphones so
located that the operator can
E:\FR\FM\17AUP1.SGM
17AUP1
erowe on DSK2VPTVN1PROD with PROPOSALS-1
Federal Register / Vol. 77, No. 160 / Friday, August 17, 2012 / Proposed Rules
communicate with individual landing
stations during hoist use.
(xv) When sinking shafts 75 feet
(22.86 m) or less in depth, cages, skips,
and buckets that may swing, bump, or
snag against shaft sides or other
structural protrusions shall be guided by
fenders, rails, ropes, or a combination of
those means.
(xvi) When sinking shafts more than
75 feet (22.86 m) in depth, all cages,
skips, and buckets shall be rope or rail
guided to within a rail length from the
sinking operation.
(xvii) Cages, skips, and buckets in all
completed shafts, or in all shafts being
used as completed shafts, shall be rope
or rail-guided for the full length of their
travel.
(xviii) Wire rope used in load lines of
material hoists shall be capable of
supporting, without failure, at least five
times the maximum intended load or
the factor recommended by the rope
manufacturer, whichever is greater.
Refer to § 1926.552(c)(14)(iii) of this part
for design factors for wire rope used in
personnel hoists. The design factor shall
be calculated by dividing the breaking
strength of wire rope, as reported in the
manufacturer’s rating tables, by the total
static load, including the weight of the
wire rope in the shaft when fully
extended.
(xix) A competent person shall
visually check all hoisting machinery,
equipment, anchorages, and hoisting
rope at the beginning of each shift and
during hoist use, as necessary.
(xx) Each safety device shall be
checked by a competent person at least
weekly during hoist use to ensure
suitable operation and safe condition.
(xxi) In order to ensure suitable
operation and safe condition of all
functions and safety devices, each hoist
assembly shall be inspected and loadtested to 100 percent of its rated
capacity: at the time of installation; after
any repairs or alterations affecting its
structural integrity; after the operation
of any safety device; and annually when
in use. The employer shall prepare a
certification record which includes the
date each inspection and load-test was
performed; the signature of the person
who performed the inspection and test;
and a serial number or other identifier
for the hoist that was inspected and
tested. The most recent certification
record shall be maintained on file until
completion of the project.
(xxii) Before hoisting personnel or
material, the operator shall perform a
test run of any cage or skip whenever it
has been out of service for one complete
shift, and whenever the assembly or
components have been repaired or
adjusted.
VerDate Mar<15>2010
14:40 Aug 16, 2012
Jkt 226001
(xxiii) Unsafe conditions shall be
corrected before using the equipment.
(4) Additional requirements for
personnel hoists. (i) Hoist drum systems
shall be equipped with at least two
means of stopping the load, each of
which shall be capable of stopping and
holding 150 percent of the hoist’s rated
line pull. A broken-rope safety, safety
catch, or arrestment device is not a
permissible means of stopping under
this paragraph.
(ii) The operator shall remain within
sight and sound of the signals at the
operator’s station.
(iii) All sides of personnel cages shall
be enclosed by one-half inch (12.70 mm)
wire mesh (not less than No. 14 gauge
or equivalent) to a height of not less
than 6 feet (1.83 m). However, when the
cage or skip is being used as a work
platform, its sides may be reduced in
height to 42 inches (1.07 m) when the
conveyance is not in motion.
(iv) All personnel cages shall be
provided with a positive locking door
that does not open outward.
(v) All personnel cages shall be
provided with a protective canopy. The
canopy shall be made of steel plate, at
least 3⁄16-inch (4.763 mm) in thickness,
or material of equivalent strength and
impact resistance. The canopy shall be
sloped to the outside, and so designed
that a section may be readily pushed
upward to afford emergency egress. The
canopy shall cover the top in such a
manner as to protect those inside from
objects falling in the shaft.
(vi) Personnel platforms operating on
guide rails or guide ropes shall be
equipped with broken-rope safety
devices, safety catches or arrestment
devices that will stop and hold 150
percent of the weight of the personnel
platform and its maximum rated load.
(vii) During sinking operations in
shafts where guides and safeties are not
yet used, the travel speed of the
personnel platform shall not exceed 200
feet (60.96 m) per minute. Governor
controls set for 200 feet (60.96 m) per
minute shall be installed in the control
system and shall be used during
personnel hoisting.
(viii) The personnel platform may
travel over the controlled length of the
hoistway at rated speeds up to 600 feet
(182.88 m) per minute during sinking
operations in shafts where guides and
safeties are used.
(ix) The personnel platform may
travel at rated speeds greater than 600
feet (182.88 m) per minute in completed
shafts.
*
*
*
*
*
PO 00000
Frm 00011
Fmt 4702
Sfmt 4702
49749
Subpart T—Demolition
3. Revise the authority citation for
subpart T of 29 CFR part 1926 to read
as follows:
Authority: 40 U.S.C. 3701; 29 U.S.C. 653,
655, 657; and Secretary of Labor’s Orders 12–
71 (36 FR 8754), 8–76 (41 FR 25059), 9–83
(48 FR 35736), 1–90 (55 FR 9033), 6–96 (62
FR 111), 5–2007 (72 FR 31159), or 1–2012 (77
FR 3912), as applicable.
4. Amend § 1926.856 by revising
paragraph (c) to read as follows:
§ 1926.856 Removal of walls, floors, and
material with equipment.
*
*
*
*
*
(c) Cranes, derricks, and other
mechanical equipment used must meet
the requirements specified in subparts
N, O, and CC of this part.
5. Amend § 1926.858 by revising
paragraph (b) to read as follows:
§ 1926.858
Removal of steel construction.
*
*
*
*
*
(b) Cranes, derricks, and other
hoisting equipment used must meet the
requirements specified in subparts N
and CC of this part.
*
*
*
*
*
Subpart DD—[Removed]
6. Remove subpart DD.
[FR Doc. 2012–20170 Filed 8–16–12; 8:45 am]
BILLING CODE 4510–26–P
FEDERAL COMMUNICATIONS
COMMISSION
47 CFR Part 1
[MD Docket No. 12–201; FCC 12–77]
Procedures for Assessment and
Collection of Regulatory Fees;
Assessment and Collection of
Regulatory Fees for Fiscal Year 2008
Federal Communications
Commission.
ACTION: Notice of proposed rulemaking.
AGENCY:
The Commission seeks
comment on proposals to reform the
Commission’s policies and procedures
for assessing and collecting regulatory
fees. Extensive changes have occurred
in the communications marketplace,
and in the Commission’s regulatory
efforts, since the Schedule of Regulatory
Fees was enacted by Congress in 1994.
In the period directly following
enactment of the Telecommunications
Act of 1996, industry development and
Commission regulation centered
primarily on wireline local and long
distance communications.
SUMMARY:
E:\FR\FM\17AUP1.SGM
17AUP1
Agencies
[Federal Register Volume 77, Number 160 (Friday, August 17, 2012)]
[Proposed Rules]
[Pages 49741-49749]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-20170]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
29 CFR Part 1926
[Docket ID-OSHA-2007-0066]
RIN 1218-AC61
Cranes and Derricks in Construction: Demolition and Underground
Construction
AGENCY: Occupational Safety and Health Administration (OSHA), Labor.
ACTION: Notice of proposed rulemaking.
-----------------------------------------------------------------------
SUMMARY: On August 9, 2010, OSHA issued a final standard updating the
requirements for cranes and derricks used in construction work. For
most construction work, the final rule replaced a prior cranes and
derricks standard. However, the prior standard continues to apply to
demolition and underground construction work. Through this proposed
rule, OSHA is proposing to apply the updated requirements to that work.
With this proposed rule, OSHA also is proposing to correct inadvertent
errors made to the demolition and underground construction standards
when it issued the final rule for cranes and derricks in construction.
DATES: Submit comments to this proposed rule, including comments to the
information-collection (paperwork) determination (described under the
section titled AGENCY DETERMINATIONS), hearing requests, and other
information by September 17, 2012. All submissions must bear a postmark
or provide other evidence of the submission date.
ADDRESSES: Submit comments, hearing requests, and other material,
identified by Docket No. OSHA-2007-0066, by any of the following
methods:
Electronically: Submit comments and attachments, as well as hearing
requests and other information, electronically at https://www.regulations.gov, which is the Federal e-Rulemaking Portal. Follow
the instructions online for submitting comments. Please note that this
docket may include several different Federal Register notices involving
active rulemakings, so selecting the correct notice or its ID number
when submitting
[[Page 49742]]
comments for this rulemaking is extremely important. After accessing
the docket (OSHA-2007-0066), look for the name of this rulemaking
(Cranes and Derricks in Construction: Demolition and Underground
Construction) in the column labeled ``Title.''
Facsimile: OSHA allows facsimile transmission of comments that are
10 pages or fewer in length (including attachments). Fax these
documents to the OSHA Docket Office at (202) 693-1648. OSHA does not
require hard copies of these documents. Instead of transmitting
facsimile copies of attachments that supplement these documents (e.g.,
studies, journal articles), commenters must submit these attachments to
the OSHA Docket Office, Technical Data Center, Room N-2625, OSHA, U.S.
Department of Labor, 200 Constitution Ave. NW., Washington, DC 20210.
These attachments must clearly identify the sender's name, the date,
subject, the title of the rulemaking (Cranes and Derricks in
Construction: Demolition and Underground Construction) and the docket
number (OSHA-2007-0066) so that the Docket Office can attach them to
the appropriate document.
Regular mail, express delivery, hand (courier) delivery, and
messenger service: Submit comments and any additional material to the
OSHA Docket Office, RIN No. 1218-AC61, Technical Data Center, Room N-
2625, OSHA, U.S. Department of Labor, 200 Constitution Ave. NW.,
Washington, DC 20210; telephone: (202) 693-2350. (OSHA's TTY number is
(877) 889-5627). Contact the OSHA Docket Office for information about
security procedures concerning delivery of materials by express
delivery, hand delivery, and messenger service. The Docket Office will
accept deliveries (express delivery, hand delivery, messenger service)
during the Docket Office's normal business hours, 8:15 a.m. to 4:45
p.m., E.T.
Instructions: All submissions must include the Agency's name, the
title of the rulemaking (Cranes and Derricks in Construction:
Demolition and Underground Construction), and the docket number (i.e.,
OSHA Docket No. OSHA-2007-0066). OSHA will place comments and other
material, including any personal information, in the public docket
without revision, and the comments and other material will be available
online at https://www.regulations.gov. Therefore, OSHA cautions
commenters about submitting statements they do not want made available
to the public, or submitting comments that contain personal information
(either about themselves or others) such as Social Security numbers,
birth dates, and medical data.
Docket: To read or download comments or other material in the
docket, go to https://www.regulations.gov or to the OSHA Docket Office
at the above address. The electronic docket for this proposed rule
established at https://www.regulations.gov lists most of the documents
in the docket. However, some information (e.g., copyrighted material)
is not available publicly to read or download through this Web site.
All submissions, including copyrighted material, are available for
inspection at the OSHA Docket Office. Contact the OSHA Docket Office
for assistance in locating docket submissions.
FOR FURTHER INFORMATION CONTACT:
General information and press inquiries: Mr. Frank Meilinger, OSHA
Office of Communications, Room N-3647, U.S. Department of Labor, 200
Constitution Avenue NW., Washington, DC 20210; telephone: (202) 693-
1999.
Technical inquiries: Mr. Garvin Branch, Directorate of
Construction, Room N-3468, OSHA, U.S. Department of Labor, 200
Constitution Avenue NW., Washington, DC 20210; telephone: (202) 693-
2020; fax: (202) 693-1689.
Copies of this Federal Register notice and news releases:
Electronic copies of these documents are available at OSHA's Web page
at https://www.osha.gov.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Request for Comment
II. Direct Final Rulemaking
III. Discussion of Amendments
A. Background
B. Demolition Work
C. Underground Construction
D. Rationale for Extending Subpart CC to Demolition and
Underground Construction
IV. Agency Determinations
A. Final Economic Analysis and Final Regulatory Flexibility
Analysis
B. Paperwork Reduction Act of 1995
C. Federalism
D. State Plan States
E. Unfunded Mandates Reform Act
F. Consultation and Coordination With Indian Tribal Governments
G. Legal Considerations
List of Subjects in 29 CFR Part 1926
Authority and Signature
Amendments to Standards
I. Request for Comment
OSHA requests comment on all issues related to the proposed rule,
including economic, paperwork, or other regulatory impacts of this rule
on the regulated community. If OSHA receives no significant adverse
comment to either this proposal or the companion direct final rule,
OSHA will publish a Federal Register document confirming the effective
date of the direct final rule and withdrawing this companion proposed
rule. Such confirmation may include minor stylistic or technical
changes to the document. For the purpose of judicial review, OSHA
considers the date of confirmation of the effective date of the direct
final rule as the date of promulgation.
II. Direct Final Rulemaking
In direct final rulemaking, an agency publishes a direct final rule
in the Federal Register with a statement that the rule will become
effective unless the agency receives significant adverse comment within
a specified period. The agency may publish an identical proposed rule
at the same time. If the agency receives no significant adverse comment
in response to the direct final rule, the agency typically confirms the
effective date of a direct final rule through a separate Federal
Register notice. If the agency receives a significant adverse comment,
the agency withdraws the direct final rule and treats such comment as a
response to the proposed rule. An agency uses direct final rulemaking
when it anticipates that a rule will not be controversial.
OSHA is publishing a companion direct final rule along with this
proposed rule in the ``Final Rules'' section of today's Federal
Register. For purposes of this proposed rule and the companion direct
final rule, a significant adverse comment is one that explains why the
amendments to OSHA's underground construction and demolition standards
would be inappropriate. In determining whether a comment necessitates
withdrawal of the direct final rule, OSHA will consider whether the
comment raises an issue serious enough to warrant a substantive
response in a notice-and-comment process. OSHA will not consider a
comment recommending an additional amendment to be a significant
adverse comment unless the comment states why the direct final rule
would be ineffective without the addition.
The comment period for the direct final rule runs concurrently with
that of this proposed rule. OSHA will treat comments received on the
companion direct final rule as comments regarding the proposed rule.
OSHA also will consider significant adverse comment submitted to this
proposed rule as comment to the companion direct final rule. If OSHA
receives a significant adverse comment on either the direct final rule
or this proposed rule, it will publish a timely withdrawal of the
[[Page 49743]]
companion direct final rule and proceed with this proposed rule. In the
event OSHA withdraws the direct final rule because of significant
adverse comment, OSHA will consider all timely comments received in
response to the direct final rule when it continues with the proposed
rule. After carefully considering all comments to the direct final rule
and the proposal, OSHA will decide whether to publish a new final rule.
OSHA determined that the subject of this rulemaking is suitable for
direct final rulemaking. Under the final rule for cranes and derricks
in construction, most construction work involving cranes and derricks
falls under new subpart CC of 29 CFR 1926, but underground construction
and demolition remain covered under the former rule (i.e., Sec.
1926.550). These proposed amendments will result in the new subpart CC
covering all construction operations, thereby improving worker safety
because the new rule provides better protection to workers than the
former rule. Moreover, these proposed amendments will facilitate
employer compliance by having all construction operations involving
cranes and derricks subject to a single rule rather than by having a
few operations subject to a different rule. In addition, this proposed
(and the direct final) rule corrects inadvertent errors made to the
standards for underground construction and demolition when OSHA issued
the final cranes rule. Therefore, OSHA does not expect objections from
the public to this rulemaking action. Accordingly, the Agency believes
the regulated community will welcome this effort to harmonize the
requirements regulating crane and derrick operations in underground
construction and demolition, and to remove errors that hinder
interpretation and proper application of existing standards.
III. Discussion of Amendments
A. Background
OSHA designed the final rule for cranes and derricks in
construction, codified at 29 CFR part 1926, subpart CC, to replace the
earlier rule (Sec. 1926.550) for all construction work.\1\ In
proposing the new cranes and derricks rule, OSHA explained that the
rule's purpose was ``to protect employees from the hazards associated
with hoisting equipment when used to perform construction activities''
(73 FR 59714). Because OSHA developed the new rule to supplant the
former rule entirely, OSHA proposed to remove and reserve Sec.
1926.550 (73 FR 59915). When other OSHA construction standards referred
to Sec. 1926.550 directly, or indirectly, as part of subpart N, OSHA
proposed to amend those provisions to refer instead to the new
requirements in subpart CC (73 FR 59914-15).
---------------------------------------------------------------------------
\1\ OSHA published the final rule at 75 FR 47906 (Aug. 9, 2010).
---------------------------------------------------------------------------
In the proposed rule for cranes and derricks in construction, OSHA
inadvertently did not propose to amend three provisions that referred
to subpart N and encompassed the requirements of Sec. 1926.550. These
provisions included two provisions applicable to demolition work (Sec.
1926.856(c) and Sec. 1926.858(b)), and one provision applicable to
underground construction work (Sec. 1926.800(t)). When it issued the
final rule, OSHA noted concerns about potentially inadequate notice to
the public regarding any effort to amend these provisions in the final
rule; consequently, OSHA decided not to amend these provisions in the
final rule. OSHA instead stated that it would revisit the issue later
(75 FR 47920-21).
Having removed the requirements of Sec. 1926.550 in the final
rule, OSHA had to reestablish the substance of the demolition and
underground construction provisions in a new subpart DD in the final
rule, redesignate Sec. 1926.550 as Sec. 1926.1501 of subpart DD, and
amend the demolition and underground construction provisions that
previously referred to subpart N to refer instead to the new subpart
DD. OSHA provided in Sec. 1926.1500 of subpart DD that ``[t]his
subpart applies in lieu of Sec. 1926 subpart CC.'' However, in making
these revisions, OSHA inadvertently made changes to the demolition and
underground construction provisions that modified the meaning of these
provisions. In addition, the Code of Federal Regulations eliminated all
of the subparagraphs of Sec. 1926.800(t), except for the introductory
paragraph, because of a technical error in the draft regulatory
language.
This proposed rule, therefore, will accomplish two goals. First, it
will bring all crane and derrick use in construction work under new
subpart CC. Second, it will correct the errors in the final rule that
substantively altered the demolition and underground construction
provisions, and replace subparagraphs Sec. 1926.800(t)(1) through (4).
Below, OSHA describes the amendments to the demolition and underground
construction standards that OSHA made in the final rule for cranes and
derricks in construction (including inadvertent errors), as well as the
revisions and corrections to these standards that OSHA proposes.
B. Demolition Work
Before OSHA issued the final rule for cranes and derricks in
construction, Sec. 1926.856(c) stated, ``Mechanical equipment used
shall meet the requirements specified in subparts N and O of this
part,'' and Sec. 1926.858(b) read, ``Cranes, derricks, and other
hoisting equipment used shall meet the requirements specified in
subpart N of this part.'' In the final rule for cranes and derricks in
construction, OSHA established a new subpart DD, redesignated the prior
cranes and derricks rule (Sec. 1926.550) as Sec. 1926.1501 of subpart
DD, and amended Sec. 1926.856(c) to require compliance with the new
subpart DD, in addition to the remaining requirements of subparts N and
O. OSHA also amended Sec. 1926.858(b) to require compliance with new
subpart DD instead of subpart N.
It was OSHA's expressed purpose not to make substantive revisions
to the requirements of these two sections in the final rule.\2\
Nevertheless, OSHA made an inadvertent substantive change to Sec.
1926.858(b).\3\ That section originally incorporated all requirements
of subpart N for ``cranes, derricks, and other hoisting equipment,''
not just the requirements of subpart N's cranes and derricks standard
at Sec. 1926.550. However, the final rule did not reference other
requirements of subpart N that pertain to demolition work, which
include the requirements of Sec. 1926.552 (Material hoists, personnel
hoists, and elevators) and Sec. 1926.554 (Overhead hoists). As a
result, the amendment had the effect of deleting the requirement for
employers engaged in demolition work to comply with Sec. Sec. 1926.552
and 1926.554. Therefore, to cover all construction work under subpart
CC, and to correct these errors, OSHA is proposing to amend Sec. Sec.
1926.856(c) and 1926.858(b) by replacing the requirements to comply
with subpart DD with requirements to comply with subpart CC, and is
proposing to amend Sec. 1926.858(b) by
[[Page 49744]]
reinstating the requirement to comply with subpart N as well.
---------------------------------------------------------------------------
\2\ OSHA explained in the preamble to the final rule that the
``redesignation of Sec. 1926.550 and the replacement of references
[to subpart N] do not alter any of the substantive requirements of
Sec. Sec. 1926.856(c) and 1926.858(b)'' (75 FR 47921).
\3\ OSHA also inadvertently listed the heading of Sec. 1926.858
as ``Removal of walls, floors and materials with equipment'' (the
same heading as Sec. 1926.856), instead of ``Removal of steel
construction,'' but this erroneous heading did not appear in the
subsequent edition of the Code of Federal Regulations (CFR).
Therefore, OSHA finds no need to address this error in this
rulemaking.
---------------------------------------------------------------------------
C. Underground Construction
Section 1926.800(t) contains requirements for hoisting that are
unique to underground construction. Before OSHA issued the final rule
for cranes and derricks in construction, the previous version of Sec.
1926.800(t) contained an introductory paragraph that cross-referenced
other OSHA standards that apply to hoisting in underground
construction; these cross-references consisted of the requirements of
the prior cranes and derricks rule at Sec. 1926.550, including most of
Sec. 1926.550(g) (the provision of the prior rule that applied to
hoisting personnel), and requirements for material hoists, personnel
hoists, and elevators at Sec. 1926.552(a) through (d). Previous Sec.
1926.800(t) included one substantive modification to the requirements
of prior Sec. 1926.550(g)(2): employers could use cranes to hoist
employees for routine access to underground worksites via a shaft
without showing that conventional means would be more hazardous, or not
possible, for this purpose due to structural design or worksite
conditions.\4\ When it issued the underground construction rule, OSHA
included this modification because hoisting personnel for routine
access to the underground worksites via a shaft occurs under more
controlled, and less hazardous, conditions than hoisting personnel in
general (54 FR 23824, 23845). Previous Sec. 1926.800(t)(1) through (4)
contained additional requirements for hoisting unique to underground
construction. Language at the beginning of the introductory paragraph
of Sec. 1926.800(t), ``Except as modified by this paragraph (t),''
clarified that the requirements and exceptions in 1926.800(t)(1)
through (4) take precedence over the cross-referenced requirements,
including the former cranes standard under Sec. 1926.550.
---------------------------------------------------------------------------
\4\ Prior Sec. 1926.550(g)(2) required employers to show,
before using cranes to hoist personnel to a worksite, that
conventional means would be more hazardous than cranes, or not
possible, due to structural design or worksite conditions.
---------------------------------------------------------------------------
In the final cranes rule, OSHA redesignated the prior cranes and
derricks rule as Sec. 1926.1501 of subpart DD. It was OSHA's expressed
purpose to preserve the existing crane requirements for underground
construction by changing references in the introductory paragraph of
Sec. 1926.800(t) from Sec. 1926.550 and Sec. 1926.500(g)(2) to Sec.
1926.1501 and Sec. 1926.1501(g)(2), respectively. OSHA clarified this
purpose in the preamble to the final rule by stating that the revisions
to Sec. 1926.800(t) ``do not alter any of the substantive requirements
of Sec. 1926.800(t)'' (75 FR 47920). However, OSHA inadvertently
changed Sec. 1926.800(t) by amending the introductory paragraph to
require employers engaged in underground construction to comply only
with new Sec. 1926.1501(g) (which duplicated Sec. 1926.550(g)),
instead of preserving the former routine-access exemption by requiring
compliance with Sec. 1926.1501 in its entirety, and modifying the
requirements of Sec. 1926.1501(g)(2) (which duplicated former Sec.
1926.550(g)(2)).\5\ Additionally, OSHA inadvertently moved the language
``Except as modified by paragraph (t)'' to the beginning of the second
sentence of the introductory paragraph so that it no longer applied to
the cross-referenced Sec. 1926.1501 requirements, but instead only
applied to the cross-referenced requirements in Sec. 1926.552(a)
through (d). Finally, although OSHA did not plan to alter any of the
(then remaining) requirements and exemptions of Sec. 1926.800(t)(1)
through (4), but only to amend the introductory paragraph, a technical
error in the instructions to the Federal Register resulted in the
deletion of subparagraphs Sec. 1926.800(t)(1) through (4). The
deletion was not mentioned in the preamble to the final cranes rule.
---------------------------------------------------------------------------
\5\ OSHA stated in the final rule that it was including the
reference to Sec. 1926.1501(g) to avoid any potential notice
problem that may arise if OSHA substituted a reference to subpart CC
in place of the prior reference to Sec. 1926.550(g) (75 FR 47920).
---------------------------------------------------------------------------
As amended by the final cranes rule, Sec. 1926.800(t) presents
four problems. First, the prior version of Sec. 1926.800(t)
incorporated all of Sec. 1926.550, not just Sec. 1926.550(g).
However, the amended version of Sec. 1926.800(t) refers only to Sec.
1926.1501(g), the successor to Sec. 1926.550(g). Therefore, as now
written, Sec. 1926.800(t) does not explicitly require employers to
comply with either the final cranes rule or the prior rule at Sec.
1926.550, except for Sec. 1926.1501(g), the prior rule's provision on
hoisting personnel. Second, the exception from Sec. 1926.550(g)(2),
specified in the former version of Sec. 1926.800(t), provided that
employers could use cranes to hoist personnel for routine access to
underground worksites via a shaft without showing that other means of
access are more hazardous or impossible. OSHA did not include this
exception in the new version of Sec. 1926.800(t). This inadvertent
error places an additional and unnecessary burden on employers that use
cranes for this purpose. Third, moving the text ``Except as modified by
paragraph (t)'' to the beginning of the second sentence of the
introductory paragraph of Sec. 1926.800(t) results in ambiguity as to
the relationship between incorporated crane requirements and the
provisions in Sec. 1926.800(t)(1) through (4). Finally, the
inadvertent elimination of Sec. 1926.800(t)(1) through (4) from the
Code of Federal Regulations resulted in eliminating requirements that
OSHA adopted in a 1989 rulemaking (54 FR 23843) to ensure that
employees engaged in underground construction receive adequate
protection from hazards unique to hoisting in this setting.
In this proposed rule, OSHA is proposing to amend Sec. 1926.800(t)
to extend subpart CC to underground construction, and to resolve the
technical errors set forth in this section. OSHA is proposing to amend
the introductory paragraph of Sec. 1926.800(t) to restore the
provision allowing employers to use cranes to hoist personnel for
routine access to the underground worksites via a shaft without the
need to show that conventional means of access are more hazardous or
impossible for this purpose. This amendment excepts routine access of
employees to an underground worksite via a shaft from the requirements
of Sec. 1926.1431(a). The requirements of Sec. 1926.1431(a) are
virtually identical to the requirements of Sec. 1926.550(g)(2). In
addition, OSHA is proposing to amend Sec. 1926.800(t) by restoring the
clause ``Except as modified by this paragraph (t)'' to the beginning of
the introductory paragraph, and restoring Sec. 1926.800(t)(1) through
(4). OSHA is also proposing to revise the language in the introductory
paragraph for clarity, and is proposing to correct three minor
grammatical errors that appeared in the text of paragraphs Sec.
1926.800(t)(3)(vi), (t)(4)(iii), and (t)(4)(iv), as previously
published in the Code of Federal Regulations.
D. Rationale for Extending Subpart CC to Demolition and Underground
Construction
The revisions made by this proposed rule will enable OSHA to cover
all cranes and derricks used in construction under subpart CC. These
revisions implement the original purpose of the rule and will benefit
both employees and employers. These revisions would ensure that the
significant benefits of subpart CC, which include saving 22 lives per
year and preventing 175 non-fatal injuries per year compared to prior
Sec. 1926.550 (75 FR 48079), extend to demolition and underground
construction. Accordingly, applying subpart CC to demolition and
[[Page 49745]]
underground construction will ensure that construction workers in those
sectors receive the same safety protections from new subpart CC as
other construction workers.
The revisions also will benefit construction contractors that
engage in underground construction or demolition work, in addition to
other types of construction work, because these contractors will now be
subject to a single standard rather than having some of their
activities covered under subpart CC and other work covered by subpart
DD. This action will avoid the confusion that would result if new
subpart CC covers part of a project and revised Sec. 1926.800(t)
covers another part of the project. For example, in a cut-and-cover
tunneling project, the underground construction standard applies only
after covering the excavation in such a manner as to establish
conditions characteristic of underground construction. 29 CFR
1926.800(a). Therefore, under the current requirements, subpart CC
would apply to the work while the excavation is open, but after
covering the excavation, subpart DD would apply, thereby resulting in
the same crane or derrick being subject to different standards during
different phases of the project. Finally, this action will facilitate
employer compliance because demolition and underground construction
contractors will no longer be subject to the outdated requirements in
prior Sec. 1926.550, which relied heavily on pre-1970 consensus
standards.
IV. Agency Determinations
A. Final Economic Analysis and Final Regulatory Flexibility Analysis
When it issued the final cranes rule, OSHA prepared a final
economic analysis (FEA) as required by the Occupational Safety and
Health Act of 1970 (OSH Act; 29 U.S.C. 651 et seq.) and Executive Order
12866 (58 FR 51735). OSHA also published a Final Regulatory Flexibility
Analysis (FRFA) as required by the Regulatory Flexibility Act (5 U.S.C.
601-612). OSHA's approach to estimating costs and economic impacts in
these analyses began by estimating, for all construction sectors, the
total number of cranes and whether they were owned and rented; owned
without rental; or leased. As a result, both analyses covered all
cranes engaged in construction activities, including cranes engaged in
underground construction and cranes engaged in construction work
involving demolition. The FEA for the final cranes standard, which
included all cranes, crane operations, and industry sectors subject to
this proposed rule, found that the requirements of the rule were
technologically and economically feasible.
Because the FEA drew these conclusions from calculations
encompassing all of the underground construction and demolition crane
operations covered by this proposed rule, the conclusions in the
earlier FEA are valid for this proposed rule. The reference to the FEA
for the final cranes rule, therefore, establishes that this proposed
rule is technologically and economically feasible, addresses
significant risks, and reduces those risks significantly. The FEA,
which OMB reviewed, meets the requirements of Executive Orders 12866
and Executive Order 13563 with respect to the operations covered by
this proposed rule; OSHA included these operations in the FEA for the
final cranes standard. Therefore, OSHA believes that this proposed rule
also complies with Executive Orders 12866 and Executive Order 13563.
To determine if this proposed rule has annual costs of greater than
$100 million, or would have a significant economic impact on a
substantial number of small firms, OSHA examined the sectors most
affected by this proposed rule. This proposed rule affects two
construction sectors: NAICS 237990 (Other Heavy and Civil Engineering
Construction), which includes all establishments engaged in underground
construction, and NAICS 238910 (Site Preparation Contractors), which
includes all establishments engaged in demolition. This analysis,
therefore, reviews the results for these two sectors reported in the
final crane standard's FEA, which the Federal Register published on
August 9, 2010.
That FEA simply considered all cranes and crane operations in these
sectors, and did not analyze separately those operations involving
underground construction or demolitions because OSHA planned to apply
subpart CC to these operations. OSHA will report here the results for
these entire sectors, which will inevitably involve greater costs and
impacts than for the activities addressed in this proposed rule because
both sectors have many cranes and crane jobs that do not involve
underground construction or demolition activities. Table B-9 of the FEA
showed that NAICS 237990, which includes all crane operations involved
in underground construction operations, had annualized compliance costs
of $1,903,569 for firms that own and rent cranes, $205,532 for firms
that own but do not rent cranes, and $1,151,759 for firms that lease
cranes, for total annualized costs of $3,260,860 (75 FR 48102-48105).
Table B-9 also showed that NAICS 238910, which contains all crane
operations involving demolitions, had annualized compliance costs of
$1,232,974 for firms that own and rent cranes, $292,601 for firms that
own but do not rent cranes, and $1,626,463 for firms that lease cranes,
for total annualized compliance costs of $3,152,038. The total
annualized compliance costs for both sectors are $6,412,898. Because
these two NAICS sectors include operations not involved in underground
construction or demolition, the total estimated annualized compliance
costs of $6,412,898 for these two sectors will be greater than the
actual costs of this proposed rule. Based on these costs, OSHA
concludes that this proposed rule is not a significant rule under
either E.O. 12866 or the Unfunded Mandates Act.
With respect to technological feasibility, the earlier FEA, which
included consideration of both underground construction and demolition
operations, noted:
In accordance with the OSH Act, OSHA is required to demonstrate
that occupational safety and health standards promulgated by the
Agency are technologically feasible. Accordingly, OSHA reviewed the
requirements that would be imposed by the final regulation, and
assessed their technological feasibility. As a result of this
review, OSHA has determined that compliance with the requirements of
the final standard is technologically feasible for all affected
industries. The standard would require employers to perform crane
inspections, utilize qualified or certified crane operators, address
ground conditions, maintain safe distances from power lines using
the encroachment prevention precautions, and to fulfill other
obligations under the standard. Compliance with all of these
requirements can be achieved with readily and widely available
technologies. Some businesses in the affected industries already
implement the requirements of the standard to varying degrees (some
states have requirements), as noted during the SBREFA Panel. OSHA
believes that there are no technological constraints in complying
with any of the proposed requirements, and received no comments that
suggested that these standards were technologically infeasible.
(75 FR 48095).
In Table B-12 of the FEA for the final cranes rule, OSHA examined
the costs as a percentage of revenues and as a percentage of profits in
these two sectors. This table shows that, for both sectors, the
greatest potential impacts were on establishments that own and rent
cranes with operators. This table showed that for NAICS 237990, which
[[Page 49746]]
includes all underground construction operations, costs were 0.18
percent (less than 1 percent) of revenues and 3.54 percent of profits.
This table also showed that for NAICS 238910, including all demolition
operations involving cranes, costs were 0.18 percent of revenues and
4.05 percent of profits. (Table B-12 and the FEA as a whole provide the
full calculations and derivations.) The FEA from the final cranes
standard stated:
The Agency concludes that the final standard is economically
feasible for the affected industries. As described above, a standard
is economically feasible if there is a reasonable likelihood that
the estimated costs of compliance ``will not threaten the existence
or competitive structure of an industry, even if it does portend
disaster for some marginal firms.'' United Steelworkers of America
v. Marshall, 647 F.2d 1189, 1272 (D.C. Cir. 1980). The potential
impacts on employer costs associated with achieving compliance with
the final standard fall well within the bounds of economic
feasibility in each industry sector. Costs of 0.2 percent of
revenues and 4 percent of profits will not threaten the existence of
the construction industry, affected general industry sectors, or the
use of cranes in affected industry sectors. OSHA does not expect
compliance with the requirements of the final standard to threaten
the viability of employers or the competitive structure of any of
the affected industry sectors. When viewed in the larger context of
the construction sector, an increase in costs of $148.2 million a
year is effectively negligible, and will have no noticeable effect
on the demand for construction services. Even when viewed as an
increase in the costs of using cranes, an increase in the cost of
rentals services of 0.2 percent will not cause the construction
industry to forego the use of cranes and, thus, put crane leasing
firms out of business.
(75 FR 48112). Because the earlier FEA drew this conclusion with
respect to costs that included the costs of this proposed rule, as well
as other costs that made the impacts greater than those of this
proposed rule, OSHA concludes that the FEA for the cranes and derricks
final rule demonstrates that this proposed rule is economically
feasible.
Tables B-14 and B-15 of the FEA for the cranes and derricks final
rule examined the costs as a percentage of revenues and as a percentage
of profits in these two sectors for small firms as defined by SBA, and
very small entities with less than 20 employees, respectively. Because
so many firms owning cranes are small, there is no appreciable
difference between the impacts on small and very small firms versus the
impacts for all firms already discussed. Comparison of the two tables
shows that, for NAICS 237990, the impacts for very small firms were
equal to or greater than those for small firms. Table B-15 shows that,
for NAICS 237990, costs were 0.18 percent of revenues and 3.54 percent
of profits. This table also shows that, for NAICS 238910, including all
demolition operations involving cranes, there were no very small
entities that owned and rented cranes, with the result that the
greatest impacts are for small entities that own and rent crane where
costs are 0.18 percent of revenues and 4.05 percent of profits.
In its regulatory flexibility analysis, OSHA generally defines a
significant economic impact on small entities as one with costs in
excess of one percent of revenues or five percent of profits. The
possible costs of this proposed rule clearly are well below these
thresholds. OSHA, therefore, certifies that this proposed rule will not
have a significant economic impact on a substantial number of small
entities.
B. Paperwork Reduction Act of 1995
When OSHA issued the final rule on August 9, 2010, it submitted an
Information Collection Request (ICR) to the Office of Management and
Budget (OMB) titled Cranes and Derricks in Construction (29 CFR Part
1926, Subpart CC). This ICR \6\ covered all establishments in the
construction industry, including all of the establishments in NAICS
237990 and NAICS 238910. On November 1, 2010, OMB approved the ICR
under OMB control number 1218-0261, with an expiration date of November
30, 2013. Subsequently, in December 2010, OSHA discontinued the Cranes
and Derricks Standard for Construction (29 CFR 1926.550) ICR (OMB
Control Number 1218-0113) because the new ICR superseded the existing
ICR. In addition, OSHA retitled the new ICR to Cranes and Derricks in
Construction (29 CFR Part 1926, Subpart CC and Subpart DD).\7\
---------------------------------------------------------------------------
\6\ The ICR is part of Exhibit 0425 in the docket for the final
rule on cranes and derricks in construction (OSHA-2007-0066). It is
available at www.regulations.gov and at www.reginfo.gov (OMB Control
Number 1218-0261).
\7\ The request and OMB approval for discontinuing the previous
Cranes and Derricks in Construction ICR (OMB Control Number 1218-
0113) and the retitling of the ICR are available at www.reginfo.gov.
---------------------------------------------------------------------------
This proposed rule requires no additional collection of
information.\8\ OMB's approval of OSHA's ICR under Control Number 1218-
0261 already covers all collections of information required by this
proposed rule, and OSHA does not believe it is necessary to submit a
new ICR to OMB seeking to collect additional information under this
proposed rule.
---------------------------------------------------------------------------
\8\ Although the final rule for cranes and derricks in
construction did not require employers covered by subpart DD to meet
the information-exchange requirements of subpart CC, OSHA did not
subtract these employers from its analysis of the burden and costs
for these requirements in the paperwork analysis for subpart CC.
Therefore, this approach inflated the burden and costs estimates of
the ICR approved by OMB for subpart CC; however, the burden and
costs estimates are accurate now that OSHA is applying subpart CC to
underground construction and demolition work.
---------------------------------------------------------------------------
Interested parties who comment on OSHA's determination that this
proposal contains no additional paperwork requirements must send their
written comments to the Office of Management and Budget, Attn: OMB Desk
Officer for OSHA, Room 10235, 726 Jackson Place, NW., Washington, DC
20503. OSHA also encourages commenters to submit their comments on this
paperwork determination to it, along with their other comments on the
proposed rule.
OSHA notes that a Federal agency cannot conduct or sponsor a
collection of information unless OMB approves it under the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.), and the agency displays
a currently valid OMB control number. The public need not respond to a
collection of information requirement unless the agency displays a
currently valid OMB control number, and, notwithstanding any other
provision of law, no person shall be subject to a penalty for failing
to comply with a collection of information requirement if the
requirement does not display a currently valid OMB control number.
C. Federalism
OSHA reviewed this proposed rule in accordance with the Executive
Order on Federalism (Executive Order 13132, 64 FR 43255, August 10,
1999), which requires that Federal agencies, to the extent possible,
refrain from limiting state policy options, consult with states prior
to taking any actions that would restrict state policy options, and
take such actions only when clear constitutional authority exists and
the problem is national in scope. Executive Order 13132 provides for
preemption of state law only with the expressed consent of Congress.
Federal agencies must limit any such preemption to the extent possible.
Under Section 18 of the OSH Act, Congress expressly provides that
states may adopt, with Federal approval, a plan for the development and
enforcement of occupational safety and health standards. States that
obtain Federal approval for such a plan are referred to as ``State Plan
States.'' Occupational safety and health
[[Page 49747]]
standards developed by State Plan States must be at least as effective
in providing safe and healthful employment and places of employment as
the Federal standards. 29 U.S.C. 667. Subject to these requirements,
State Plan States are free to develop and enforce under state law their
own requirements for safety and health standards.
OSHA previously concluded from its analysis that promulgation of
subpart CC complies with Executive Order 13132. 75 FR 48128-29. That
analysis applies to the extension of subpart CC to establishments
engaged in demolition work and underground construction; therefore,
this proposed rule complies with Executive Order 13132. In states
without an OSHA-approved State Plan, any standard developed from this
proposed rule would limit state policy options in the same manner as
every standard promulgated by OSHA. In states with OSHA-approved State
Plans, this rulemaking does not significantly limit state policy
options.
D. State Plan States
When Federal OSHA promulgates a new standard or more stringent
amendment to an existing standard, State Plan States must amend their
standards to reflect the new standard or amendment, or show OSHA why
such action is unnecessary, e.g., because an existing state standard
covering this area is ``at least as effective'' as the new Federal
standard or amendment. 29 CFR 1953.5(a). The state standard must be at
least as effective as the final Federal rule. State Plan States must
adopt the Federal standard or complete their own standard within six
months of the promulgation date of the final Federal rule. When OSHA
promulgates a new standard or amendment that does not impose additional
or more stringent requirements than an existing standard, State Plan
States are not required to amend their standards, although OSHA may
encourage them to do so. The 27 states and U.S. territories with OSHA-
approved occupational safety and health plans are: Alaska, Arizona,
California, Hawaii, Indiana, Iowa, Kentucky, Maryland, Michigan,
Minnesota, Nevada, New Mexico, North Carolina, Oregon, Puerto Rico,
South Carolina, Tennessee, Utah, Vermont, Virginia, Washington, and
Wyoming; Connecticut, Illinois, New Jersey, New York, and the Virgin
Islands have OSHA-approved State Plans that apply to state and local
government employees only.
The amendments in this proposed rule will result in more stringent
requirements for cranes and derricks used in demolition and underground
construction work. Therefore, when OSHA promulgates a new final rule,
states and territories with approved State Plans must adopt comparable
amendments to their standards for cranes and derricks used in
demolition and underground construction within six months of OSHA's
promulgation of the final rule (i.e., the date OSHA publishes
confirmation of the effective date) unless they demonstrate that such a
change is not necessary because their existing standards are already
the same, or at least as effective, as OSHA's new final rule.
E. Unfunded Mandates Reform Act
When OSHA issued the final rule for cranes and derricks in
construction, it reviewed the rule according to the Unfunded Mandates
Reform Act of 1995 (UMRA; 2 U.S.C. 1501 et seq. (58 FR 58093)), and
Executive Order 12875 (75 FR 48130). OSHA concluded that the final rule
did not meet the definition of a ``Federal intergovernmental mandate''
under the UMRA because OSHA standards do not apply to state or local
governments except in states that have voluntarily adopted State Plans.
OSHA further noted that the rule imposed costs of over $100 million per
year on the private sector and, therefore, required review under the
UMRA for those costs, but that its final economic analysis met that
requirement.
As discussed above in Section IV.A (Final Economic Analysis and
Final Regulatory Flexibility Analysis) of this preamble, this proposed
rule does not impose any costs on private-sector employers beyond those
costs already taken into account in the final rule for cranes and
derricks in construction. Because OSHA reviewed the total costs of this
final rule under the UMRA, no further review of those costs is
necessary. Therefore, for the purposes of the UMRA, OSHA certifies that
this proposed rule does not mandate that state, local, or tribal
governments adopt new, unfunded regulatory obligations, or increase
expenditures by the private sector of more than $100 million in any
year.
F. Consultation and Coordination With Indian Tribal Governments
OSHA reviewed this proposed rule in accordance with Executive Order
13175 (65 FR 67249) and determined that it does not have ``tribal
implications'' as defined in that order. As proposed, the rule does not
have substantial direct effects on one or more Indian tribes, on the
relationship between the Federal government and Indian tribes, or on
the distribution of power and responsibilities between the Federal
government and Indian tribes.
G. Legal Considerations
The purpose of the Occupational Safety and Health Act of 1970 (29
U.S.C. 651 et seq.) is ``to assure so far as possible every working man
and woman in the nation safe and healthful working conditions and to
preserve our human resources.'' 29 U.S.C. 651(b). To achieve this goal,
Congress authorized the Secretary of Labor to promulgate and enforce
occupational safety and health standards. 29 U.S.C. 654(b), 655(b). A
safety or health standard is a standard ``which requires conditions, or
the adoption or use of one or more practices, means, methods,
operations, or processes, reasonably necessary or appropriate to
provide safe or healthful employment or places of employment.'' 29
U.S.C. 652(8). A standard is reasonably necessary or appropriate within
the meaning of Section 652(8) when a significant risk of material harm
exists in the workplace and the standard would substantially reduce or
eliminate that workplace risk. See Industrial Union Department, AFL-CIO
v. American Petroleum Institute, 448 U.S. 607 (1980). In the cranes and
derricks final rule, OSHA made such a determination with respect to the
use of cranes and derricks in construction at the same time that it
noted that the Agency would apply subpart CC to the activities
addressed in this proposed rule (75 FR 47913, 47920-21).
This proposed rule will not reduce the employee protections put
into place by the standard OSHA is updating under this rulemaking.
Instead, this rulemaking likely will enhance employee safety by
ensuring that the construction workers involved in demolition and
underground construction receive the same safety protections from
recently published subpart CC as other construction workers. The
revisions also will benefit construction contractors that engage in
underground construction or demolition work in addition to other types
of construction work, because these contractors will now be subject to
a single standard rather than having some of their construction work
under subpart CC, and other work covered by existing subpart DD. This
action, therefore, will clarify employer obligations by avoiding the
confusion that would result if subpart CC covers part of a project and
existing subpart DD covers another part of the project. Accordingly, it
is unnecessary to make a separate determination of significant risk, or
the extent to which this rule would reduce that risk, as typically
[[Page 49748]]
required by Industrial Union Department.
List of Subjects in 29 CFR Part 1926
Construction industry, Demolition, Occupational safety and health,
Safety, Underground construction.
Authority and Signature
David Michaels, Ph.D., MPH, Assistant Secretary of Labor for
Occupational Safety and Health, U.S. Department of Labor, 200
Constitution Ave. NW., Washington, DC 20210, authorized the preparation
of this notice. OSHA is issuing this proposed rule under the following
authorities: 29 U.S.C. 653, 655, 657; 40 U.S.C. 3701 et seq.; 5 U.S.C.
553; Secretary of Labor's Order No. 1-2012 (77 FR 3912, Jan. 25, 2012);
and 29 CFR part 1911.
Signed at Washington, DC, on August 8, 2012.
David Michaels,
Assistant Secretary of Labor for Occupational Safety and Health.
Amendments to Standards
For the reasons stated in the preamble of this proposed rule, OSHA
proposes to amend 29 CFR part 1926 as follows:
PART 1926--[AMENDED]
Subpart S--Underground Construction, Caissons, Cofferdams, and
Compressed Air
1. Revise the authority citation for subpart S of 29 CFR part 1926
to read as follows:
Authority: 40 U.S.C. 3701; 29 U.S.C. 653, 655, 657; and
Secretary of Labor's Orders 12-71 (36 FR 8754), 8-76 (41 FR 25059),
9-83 (48 FR 35736), 1-90 (55 FR 9033), 6-96 (62 FR 111), 5-2007 (72
FR 31159), or 1-2012 (77 FR 3912), as applicable.
2. Amend Sec. 1926.800 by revising paragraph (t) to read as
follows:
Sec. 1926.800 Underground construction.
* * * * *
(t) Hoisting unique to underground construction. Except as modified
by this paragraph (t), employers must: comply with the requirements of
subpart CC of this part, except that the limitation in Sec.
1926.1431(a) does not apply to the routine access of employees to an
underground worksite via a shaft; ensure that material hoists comply
with Sec. 1926.552(a) and (b) of this part; and ensure that personnel
hoists comply with the personnel-hoists requirements of Sec.
1926.552(a) and (c) of this part and the elevator requirements of Sec.
1926.552(a) and (d) of this part.
(1) General requirements for cranes and hoists. (i) Materials,
tools, and supplies being raised or lowered, whether within a cage or
otherwise, shall be secured or stacked in a manner to prevent the load
from shifting, snagging or falling into the shaft.
(ii) A warning light suitably located to warn employees at the
shaft bottom and subsurface shaft entrances shall flash whenever a load
is above the shaft bottom or subsurface entrances, or the load is being
moved in the shaft. This paragraph does not apply to fully enclosed
hoistways.
(iii) Whenever a hoistway is not fully enclosed and employees are
at the shaft bottom, conveyances or equipment shall be stopped at least
15 feet (4.57 m) above the bottom of the shaft and held there until the
signalman at the bottom of the shaft directs the operator to continue
lowering the load, except that the load may be lowered without stopping
if the load or conveyance is within full view of a bottom signalman who
is in constant voice communication with the operator.
(iv)(A) Before maintenance, repairs, or other work is commenced in
the shaft served by a cage, skip, or bucket, the operator and other
employees in the area shall be informed and given suitable
instructions.
(B) A sign warning that work is being done in the shaft shall be
installed at the shaft collar, at the operator's station, and at each
underground landing.
(v) Any connection between the hoisting rope and the cage or skip
shall be compatible with the type of wire rope used for hoisting.
(vi) Spin-type connections, where used, shall be maintained in a
clean condition and protected from foreign matter that could affect
their operation.
(vii) Cage, skip, and load connections to the hoist rope shall be
made so that the force of the hoist pull, vibration, misalignment,
release of lift force, or impact will not disengage the connection.
Moused or latched open-throat hooks do not meet this requirement.
(viii) When using wire rope wedge sockets, means shall be provided
to prevent wedge escapement and to ensure that the wedge is properly
seated.
(2) Additional requirements for cranes. Cranes shall be equipped
with a limit switch to prevent overtravel at the boom tip. Limit
switches are to be used only to limit travel of loads when operational
controls malfunction and shall not be used as a substitute for other
operational controls.
(3) Additional requirements for hoists. (i) Hoists shall be
designed so that the load hoist drum is powered in both directions of
rotation, and so that brakes are automatically applied upon power
release or failure.
(ii) Control levers shall be of the ``deadman type'' which return
automatically to their center (neutral) position upon release.
(iii) When a hoist is used for both personnel hoisting and material
hoisting, load and speed ratings for personnel and for materials shall
be assigned to the equipment.
(iv) Material hoisting may be performed at speeds higher than the
rated speed for personnel hoisting if the hoist and components have
been designed for such higher speeds and if shaft conditions permit.
(v) Employees shall not ride on top of any cage, skip or bucket
except when necessary to perform inspection or maintenance of the
hoisting system, in which case they shall be protected by a body belt/
harness system to prevent falling.
(vi) Personnel and materials (other than small tools and supplies
secured in a manner that will not create a hazard to employees) shall
not be hoisted together in the same conveyance. However, if the
operator is protected from the shifting of materials, then the operator
may ride with materials in cages or skips which are designed to be
controlled by an operator within the cage or skip.
(vii) Line speed shall not exceed the design limitations of the
systems.
(viii) Hoists shall be equipped with landing level indicators at
the operator's station. Marking the hoist rope does not satisfy this
requirement.
(ix) Whenever glazing is used in the hoist house, it shall be
safety glass, or its equivalent, and be free of distortions and
obstructions.
(x) A fire extinguisher that is rated at least 2A:10B:C (multi-
purpose, dry chemical) shall be mounted in each hoist house.
(xi) Hoist controls shall be arranged so that the operator can
perform all operating cycle functions and reach the emergency power
cutoff without having to reach beyond the operator's normal operating
position.
(xii) Hoists shall be equipped with limit switches to prevent
overtravel at the top and bottom of the hoistway.
(xiii) Limit switches are to be used only to limit travel of loads
when operational controls malfunction and shall not be used as a
substitute for other operational controls.
(xiv) Hoist operators shall be provided with a closed-circuit voice
communication system to each landing station, with speaker microphones
so located that the operator can
[[Page 49749]]
communicate with individual landing stations during hoist use.
(xv) When sinking shafts 75 feet (22.86 m) or less in depth, cages,
skips, and buckets that may swing, bump, or snag against shaft sides or
other structural protrusions shall be guided by fenders, rails, ropes,
or a combination of those means.
(xvi) When sinking shafts more than 75 feet (22.86 m) in depth, all
cages, skips, and buckets shall be rope or rail guided to within a rail
length from the sinking operation.
(xvii) Cages, skips, and buckets in all completed shafts, or in all
shafts being used as completed shafts, shall be rope or rail-guided for
the full length of their travel.
(xviii) Wire rope used in load lines of material hoists shall be
capable of supporting, without failure, at least five times the maximum
intended load or the factor recommended by the rope manufacturer,
whichever is greater. Refer to Sec. 1926.552(c)(14)(iii) of this part
for design factors for wire rope used in personnel hoists. The design
factor shall be calculated by dividing the breaking strength of wire
rope, as reported in the manufacturer's rating tables, by the total
static load, including the weight of the wire rope in the shaft when
fully extended.
(xix) A competent person shall visually check all hoisting
machinery, equipment, anchorages, and hoisting rope at the beginning of
each shift and during hoist use, as necessary.
(xx) Each safety device shall be checked by a competent person at
least weekly during hoist use to ensure suitable operation and safe
condition.
(xxi) In order to ensure suitable operation and safe condition of
all functions and safety devices, each hoist assembly shall be
inspected and load-tested to 100 percent of its rated capacity: at the
time of installation; after any repairs or alterations affecting its
structural integrity; after the operation of any safety device; and
annually when in use. The employer shall prepare a certification record
which includes the date each inspection and load-test was performed;
the signature of the person who performed the inspection and test; and
a serial number or other identifier for the hoist that was inspected
and tested. The most recent certification record shall be maintained on
file until completion of the project.
(xxii) Before hoisting personnel or material, the operator shall
perform a test run of any cage or skip whenever it has been out of
service for one complete shift, and whenever the assembly or components
have been repaired or adjusted.
(xxiii) Unsafe conditions shall be corrected before using the
equipment.
(4) Additional requirements for personnel hoists. (i) Hoist drum
systems shall be equipped with at least two means of stopping the load,
each of which shall be capable of stopping and holding 150 percent of
the hoist's rated line pull. A broken-rope safety, safety catch, or
arrestment device is not a permissible means of stopping under this
paragraph.
(ii) The operator shall remain within sight and sound of the
signals at the operator's station.
(iii) All sides of personnel cages shall be enclosed by one-half
inch (12.70 mm) wire mesh (not less than No. 14 gauge or equivalent) to
a height of not less than 6 feet (1.83 m). However, when the cage or
skip is being used as a work platform, its sides may be reduced in
height to 42 inches (1.07 m) when the conveyance is not in motion.
(iv) All personnel cages shall be provided with a positive locking
door that does not open outward.
(v) All personnel cages shall be provided with a protective canopy.
The canopy shall be made of steel plate, at least \3/16\-inch (4.763
mm) in thickness, or material of equivalent strength and impact
resistance. The canopy shall be sloped to the outside, and so designed
that a section may be readily pushed upward to afford emergency egress.
The canopy shall cover the top in such a manner as to protect those
inside from objects falling in the shaft.
(vi) Personnel platforms operating on guide rails or guide ropes
shall be equipped with broken-rope safety devices, safety catches or
arrestment devices that will stop and hold 150 percent of the weight of
the personnel platform and its maximum rated load.
(vii) During sinking operations in shafts where guides and safeties
are not yet used, the travel speed of the personnel platform shall not
exceed 200 feet (60.96 m) per minute. Governor controls set for 200
feet (60.96 m) per minute shall be installed in the control system and
shall be used during personnel hoisting.
(viii) The personnel platform may travel over the controlled length
of the hoistway at rated speeds up to 600 feet (182.88 m) per minute
during sinking operations in shafts where guides and safeties are used.
(ix) The personnel platform may travel at rated speeds greater than
600 feet (182.88 m) per minute in completed shafts.
* * * * *
Subpart T--Demolition
3. Revise the authority citation for subpart T of 29 CFR part 1926
to read as follows:
Authority: 40 U.S.C. 3701; 29 U.S.C. 653, 655, 657; and
Secretary of Labor's Orders 12-71 (36 FR 8754), 8-76 (41 FR 25059),
9-83 (48 FR 35736), 1-90 (55 FR 9033), 6-96 (62 FR 111), 5-2007 (72
FR 31159), or 1-2012 (77 FR 3912), as applicable.
4. Amend Sec. 1926.856 by revising paragraph (c) to read as
follows:
Sec. 1926.856 Removal of walls, floors, and material with equipment.
* * * * *
(c) Cranes, derricks, and other mechanical equipment used must meet
the requirements specified in subparts N, O, and CC of this part.
5. Amend Sec. 1926.858 by revising paragraph (b) to read as
follows:
Sec. 1926.858 Removal of steel construction.
* * * * *
(b) Cranes, derricks, and other hoisting equipment used must meet
the requirements specified in subparts N and CC of this part.
* * * * *
Subpart DD--[Removed]
6. Remove subpart DD.
[FR Doc. 2012-20170 Filed 8-16-12; 8:45 am]