Sunshine Act Meeting, 56820 [2011-23600]
Download as PDF
56820
Federal Register / Vol. 76, No. 178 / Wednesday, September 14, 2011 / Notices
rules and team agreement; (2) in the
case of a private entity, shall be
incorporated in and maintain a primary
place of business in the United States,
and in the case of an individual,
whether participating singly or in a
group, shall be a citizen or permanent
resident of the United States; and (3)
shall not be a Federal entity or Federal
employee acting within the scope of
their employment.
III. Rules
The complete rules and team
agreement for the 2012 Sample Return
Robot Challenge can be found at:
https://wp.wpi.edu/challenge/.
Dated: August 8, 2011.
Joseph Parrish,
Deputy Chief Technologist, National
Aeronautics and Space Administration.
[FR Doc. 2011–23506 Filed 9–13–11; 8:45 am]
BILLING CODE 7510–13–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–341; NRC–2011–0215]
Detroit Edison Company, Fermi 2;
Environmental Assessment and
Finding of No Significant Impact
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment to Facility
Operating License No. NPF–43, issued
to Detroit Edison Company (the
licensee), for operation of the Fermi 2,
located in Monroe County, Michigan, in
accordance with Title 10 of the Code of
Federal Regulations (10 CFR) 50.90.
Therefore, as required by 10 CFR 51.21,
the NRC performed an environmental
assessment. Based on the results of the
environmental assessment, the NRC is
issuing a finding of no significant
impact.
Environmental Assessment
Identification of the Proposed Action
NATIONAL TRANSPORTATION
SAFETY BOARD
Sunshine Act Meeting
9:30 a.m., Tuesday,
September 27, 2011.
PLACE: NTSB Conference Center, 429
L’Enfant Plaza, SW., Washington, DC
20594.
STATUS: The ONE item is open to the
public.
MATTER TO BE CONSIDERED: 8205A
Marine Accident Report—Collision of
Tankship EAGLE OTOME with Cargo
Vessel GULL ARROW and Subsequent
Collision with the DIXIE VENGEANCE
Tow Sabine-Neches Canal, Port Arthur,
Texas, January 23, 2010.
NEWS MEDIA CONTACT: Telephone: (202)
314–6100.
The press and public may enter the
NTSB Conference Center one hour prior
to the meeting for set up and seating.
Individuals requesting specific
accommodations should contact
Rochelle Hall at (202) 314–6305 by
Friday, September 23, 2011.
The public may view the meeting via
a live or archived Webcast by accessing
a link under ‘‘News & Events’’ on the
NTSB home page at https://
www.ntsb.gov.
mstockstill on DSK4VPTVN1PROD with NOTICES
TIME AND DATE:
FOR FURTHER INFORMATION CONTACT:
Candi Bing, (202) 314–6403 or by e-mail
at bingc@ntsb.gov.
September 9, 2011.
Candi R. Bing,
Federal Register Liaison Officer.
[FR Doc. 2011–23600 Filed 9–12–11; 11:15 am]
BILLING CODE 7533–01–P
VerDate Mar<15>2010
19:00 Sep 13, 2011
Jkt 223001
The proposed action would revise the
Radiological Emergency Response
Preparedness Plan (RERP) to increase
the staff augmentation times for the
Operational and Technical Support
Centers-related functions from 30 to 60
minutes, and for Emergency Operations
Facility (EOF)-related functions from 60
to 90 minutes.
The proposed action is in accordance
with the licensee’s application dated
September 24, 2010 (Agencywide
Documents Access and Management
System (ADAMS) Accession No.
ML102700478), as supplemented by
letter dated March 4, 2011 (ADAMS
Accession No. ML110660050).
The Need for the Proposed Action
The proposed change increases the
emergency plan (EP) staff augmentation
times from 30 and 60 minutes to 60 and
90 minutes. Specifically, the proposed
change requests a revision to the Fermi
2 Emergency Plan Table B–1, ‘‘Fermi 2
Emergency Response Organization
[ERO],’’ to increase the staff
augmentation times for Technical
Support Center-related functions from
30 to 60 minutes, and for EOF-related
functions from 60 to 90 minutes.
The proposed change is needed to
address concerns for the safety of ERO
personnel when responding to the site
due to the increase in population and
redistribution within the 10-mile
Emergency Planning Zone (EPZ). When
considering that two lane roads
comprise the majority of highways
within the EPZ, this has created
increased traffic congestion and
increased traffic control delays.
PO 00000
Frm 00091
Fmt 4703
Sfmt 4703
Consequently, personnel that respond to
the site have encountered more delays
than when the plant was first licensed.
Additional delays may occur in the
future based on continued population
growth.
Improvements have been made to
equipment, procedures, and training
since initial approval of the Fermi 2 EP
that have resulted in a significant
increase in the on-shift capabilities and
knowledge such there would be no
degradation or loss of EP function as a
result of the proposed change. A
functional analysis was also performed
on the effect of the proposed change on
the timeliness of performing major tasks
for the major functional areas of RERP
plan. The analysis concluded that
extension of staff augmentation times
would not significantly affect the ability
to perform the required tasks.
Environmental Impacts of the Proposed
Action
The NRC has completed its
environmental assessment of the
proposed exemption. The staff has
concluded that the proposed action to
increase the staff augmentation times for
the Operational and Technical Support
Centers-related functions from 30 to 60
minutes, and for EOF-related functions
from 60 to 90 minutes would not
significantly affect plant safety and
would not have a significant adverse
effect on the probability of an accident
occurring.
The proposed action would not result
in an increased radiological hazard
beyond those previously analyzed in the
updated Safety Analysis Report. There
will be no change to radioactive
effluents that effect radiation exposures
to plant workers and members of the
public. No changes will be made to
plant buildings or the site property.
Therefore, no changes or different types
of radiological impacts are expected as
a result of the proposed exemption.
The proposed action does not result
in changes to land use or water use, or
result in changes to the quality or
quantity of non-radiological effluents.
No changes to the National Pollution
Discharge Elimination System permit
are needed. No effects on the aquatic or
terrestrial habitat in the vicinity or the
plant, or to threatened, endangered, or
protected species under the Endangered
Species Act, or impacts to essential fish
habitat covered by the MagnusonStevens Act are expected. There are no
impacts to the air or ambient air quality.
There are no impacts to historical and
cultural resources. There would be no
noticeable effect on socioeconomic
conditions in the region. Therefore, no
changes or different types of non-
E:\FR\FM\14SEN1.SGM
14SEN1
Agencies
[Federal Register Volume 76, Number 178 (Wednesday, September 14, 2011)]
[Notices]
[Page 56820]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23600]
=======================================================================
-----------------------------------------------------------------------
NATIONAL TRANSPORTATION SAFETY BOARD
Sunshine Act Meeting
TIME AND DATE: 9:30 a.m., Tuesday, September 27, 2011.
PLACE: NTSB Conference Center, 429 L'Enfant Plaza, SW., Washington, DC
20594.
STATUS: The ONE item is open to the public.
MATTER TO BE CONSIDERED: 8205A Marine Accident Report--Collision of
Tankship EAGLE OTOME with Cargo Vessel GULL ARROW and Subsequent
Collision with the DIXIE VENGEANCE Tow Sabine-Neches Canal, Port
Arthur, Texas, January 23, 2010.
NEWS MEDIA CONTACT: Telephone: (202) 314-6100.
The press and public may enter the NTSB Conference Center one hour
prior to the meeting for set up and seating.
Individuals requesting specific accommodations should contact
Rochelle Hall at (202) 314-6305 by Friday, September 23, 2011.
The public may view the meeting via a live or archived Webcast by
accessing a link under ``News & Events'' on the NTSB home page at
https://www.ntsb.gov.
FOR FURTHER INFORMATION CONTACT: Candi Bing, (202) 314-6403 or by e-
mail at bingc@ntsb.gov.
September 9, 2011.
Candi R. Bing,
Federal Register Liaison Officer.
[FR Doc. 2011-23600 Filed 9-12-11; 11:15 am]