Proposed Information Collection Request Submitted for Public Comment and Recommendations; Emergency Mine Evacuation, 63794-63795 [E9-28893]
Download as PDF
63794
Federal Register / Vol. 74, No. 232 / Friday, December 4, 2009 / Notices
costs, and the following forms: OMB
Standard Form 424A, Budget
Information—Non Construction
Programs, OMB Standard Form 424B,
Assurances—Non Construction
Programs (these forms are available at
grants.gov), DOJ/NIC Certification
Regarding Lobbying; Debarment,
Suspension and Other Responsibility
Matters; and Drug-Free Workplace
Requirements (available at https://
www.nicic.gov/Downloads/PDF/certiffrm.pdf.). Additional Resources: Go to
https://www.nicic.gov.
Applications may be submitted in
hard copy, or electronically via https://
www.grants.gov. If submitted in hard
copy, there needs to be an original and
three copies of the full proposal
(program and budget narratives,
application forms and assurances). The
original should have the applicant’s
signature in blue ink.
Authority: Public Law 93–415.
Funds Available and Budget
Considerations: Up to $150,000 is
available for this project, but preference
will be given to applicants who provide
the most cost efficient solutions in
accomplishing the scope of work.
Determination will be made based on
best value to the Government, not
necessarily the lowest bid. Funds may
only be used for the activities that are
directly related to the project.
NIC will not specify the number of
events to be completed. In developing
the proposed budget, applicants should
estimate the average cost for a technical
assistance project, to include the
number of providers, the overall number
of fee days, airfares, and travel and
miscellaneous expenses. The applicant
should estimate the number of technical
assistance projects to be completed.
This project will be a collaborative
venture with the NIC Research and
Evaluation Division.
Eligibility of Applicants: An eligible
applicant is any public or private
agency, educational institution,
organization, individual or team with
expertise in the described areas.
Review Considerations: Applications
received under this announcement will
be subject to the NIC Review Process.
The criteria for the evaluation of each
application will be as follows:
mstockstill on DSKH9S0YB1PROD with NOTICES
Programmatic (40%)
Is the required protocol (Goal 1)
included and reflective of the applicants
understanding of the project? Are all of
the protocol elements present and
sufficiently detailed to offer a clear
understanding of how each of the tasks
will be accomplished? Are Project Goals
Two and Three adequately discussed?
VerDate Nov<24>2008
17:26 Dec 03, 2009
Jkt 220001
Organizational (35%)
Do the skills, knowledge, and
expertise of the organization and the
proposed project staff demonstrate a
high level of competency to carry out
the tasks? Does the applicant
organization have the necessary
experience and organizational capacity
to carry out all three goals of the
project? Are the proposed project
management and staffing plans realistic
and sufficient to complete the projected
number of technical assistance projects
within the time frames proposed?
Project Management/Administration
(25%)
Does the applicant identify reasonable
objectives, milestones, and measures to
track progress? If consultants and/or
partnerships are proposed, is there a
reasonable justification for their
inclusion in the project and a clear
structure to insure effective
coordination? Is the proposed budget
realistic, provide sufficient cost detail/
narrative, and represent good value
relative to the anticipated results?
Note: NIC will NOT award a cooperative
agreement to an applicant who does not have
a Dun and Bradstreet Database Universal
Number (DUNS) and is not registered in the
Central Contractor Registry (CCR).
A Duns number can be received at no
cost by calling the dedicated toll-free
DUNS number request line at 1–800–
333–0505 (if you are a sole proprietor,
you would dial 1–866–705–5711 and
select option 1).
Registration in the CCR can be done
online at the CCR Web site: https://
www.ccr.gov. A CCR handbook and
worksheet can also be reviewed at the
Web site.
Number of Awards: One.
NIC Opportunity Number: 10PEI35.
This number should appear as a
reference line in the cover letter, where
indicated on Standard Form 424, and
outside of the envelope in which the
application is sent.
Catalog of Federal Domestic
Assistance Number: 16.603.
Executive Order 12372: This program
is subject to the provisions of Executive
Order 12372. E.O. 12372 allows states
the option of setting up a system for
reviewing applications from within
their states for assistance under certain
Federal programs. Applicants (other
than Federally-recognized Indian tribal
governments) should contact State
Single Point of Contact (SPOC), a list of
which can be found at https://
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
www.whitehouse.gov/omb/grants/
spoc.html.
Morris L. Thigpen,
Director, National Institute of Corrections.
[FR Doc. E9–29011 Filed 12–3–09; 8:45 am]
BILLING CODE 4410–36–P
DEPARTMENT OF LABOR
Mine Safety and Health Administration
Proposed Information Collection
Request Submitted for Public
Comment and Recommendations;
Emergency Mine Evacuation
ACTION:
Notice.
SUMMARY: The Department of Labor, as
part of its continuing effort to reduce
paperwork and respondent burden
conducts a pre-clearance consultation
program to provide the general public
and Federal agencies with an
opportunity to comment on proposed
and/or continuing collections of
information in accordance with the
Paperwork Reduction Act of 1995
(PRA95) [44 U.S.C. 3506 (c)(2)(A)]. This
program helps to ensure that requested
data can be provided in the desired
format, reporting burden (time and
financial resources) is minimized,
collection instruments are clearly
understood, and the impact of collection
requirements on respondents can be
properly assessed.
Currently, the Mine Safety and Health
Administration (MSHA) is soliciting
comments concerning the extension of
the information collection related to
Emergency Mine Evacuation: 30 CFR
48.3—Training plans; time of
submission; where filed; information
required; time for approval; method for
disapproval; commencement of training;
approval of instructors; 30 CFR
75.1502—Mine emergency evacuation
and firefighting program of instruction;
30 CFR 75.1504—Mine emergency
evacuation training and drills; 30 CFR
75.1505—Escapeway maps. 30 CFR
75.1714–3—Self-rescue devices;
inspection, testing, maintenance, repair,
and recordkeeping; 30 CFR 75.1714–5—
Map locations of self-contained selfrescuers (SCSRs); 30 CFR 75.1714–8—
Reporting SCSR inventory and
malfunctions; retention of SCSRs.
DATES: Submit comments on or before
February 2, 2010.
ADDRESSES: Send comments to U.S.
Department of Labor, Mine Safety and
Health Administration, John Rowlett,
Director, Management Services
Division, 1100 Wilson Boulevard, Room
2134, Arlington, VA 22209–3939.
E:\FR\FM\04DEN1.SGM
04DEN1
Federal Register / Vol. 74, No. 232 / Friday, December 4, 2009 / Notices
Commenters are encouraged to send
their comments via e-mail to
Rowlett.John@dol.gov. Mr. Rowlett can
be reached at (202) 693–9827 (voice), or
(202) 693–9801 (facsimile).
FOR FURTHER INFORMATION: Contact the
employee listed in the ADDRESSES
section of this notice.
SUPPLEMENTARY INFORMATION:
I. Background
The Mine Safety and Health
Administration (MSHA) issued a final
rule addressing emergency mine
evacuation in 2006. This regulation
included requirements for immediate
accident notification applicable to all
mines. In addition, it contained
requirements for new and expanded
training, including evacuation drills;
self-contained self-rescuer (SCSR)
storage, training, and use; and the
installation and maintenance of lifelines
in underground coal mines.
Submission of training plans and
programs of instruction and certification
that training was done provides MSHA,
operators, and miners with confidence
that training is appropriate and was
conducted as necessary, particularly
when MSHA is not able to be at the
mine. Without adequate training, miners
may sustain serious or even fatal
injuries because they lack the
knowledge to properly and safely
perform various tasks and activities or
evacuate a mine.
If inspections and monitoring of
SCSRs did not occur, this could allow
unsafe conditions to go undetected and
the SCSRs might not be usable when
needed. This would endanger miners’
safety.
If operators were not required to
submit an SCSR inventory or to notify
MSHA when they encounter an SCSR
defect, performance problem, or
malfunction, MSHA would not have the
information needed to notify other
mines that may also use the affected
SCSRs. This could endanger miners
because operators could continue to rely
on deficient SCSRs.
mstockstill on DSKH9S0YB1PROD with NOTICES
II. Desired Focus of Comments
MSHA is particularly interested in
comments that:
• Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the agency, including
whether the information will have
practical utility;
• Evaluate the accuracy of the
agency’s estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used;
VerDate Nov<24>2008
17:26 Dec 03, 2009
Jkt 220001
• Enhance the quality, utility, and
clarity of the information to be
collected; and
• Minimize the burden of the
collection of information on those who
are to respond, including through the
use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submissions
of responses.
A copy of the proposed information
collection request can be obtained by
contacting the employee listed in the
ADDRESSES section of this notice, or
viewed on the Internet by accessing the
MSHA home page (https://
www.msha.gov/) and selecting ‘‘Rules &
Regs’’, and then selecting ‘‘FedReg.
Docs’’. On the next screen, select
‘‘Paperwork Reduction Act Supporting
Statement’’ to view documents
supporting the Federal Register Notice.
III. Current Actions
Information collected is used by the
mine operator and MSHA to ensure that
underground coal operators modify
their training plans whenever they
modify their program of instruction.
This will ensure that newly hired
miners receive the same level of training
as is required for other miners.
Operators use part 48 training plans to
train each miner about the safety and
health aspects of the mining
environment and the tasks associated
with the miner’s job. MSHA uses the
plans to ensure that all miners are
receiving training necessary to perform
their jobs in a safe manner.
MSHA requires underground coal
operators to submit a Mine Emergency
Evacuation and Firefighting Program of
Instruction to the District Manager for
approval. Upon approval by the MSHA
District Manager, the operator uses the
approved program of instruction to
implement programs for training miners
in responding appropriately to mine
emergencies. MSHA uses the plans to
ensure that the operator’s program will
provide the required training and drills
to all miners.
MSHA requires the operator to certify
the training and drill for each miner at
the completion of each quarterly drill,
annual expectations training, or other
training, and that a copy be provided to
the miner upon request. These
certifications are used by MSHA,
operators, and miners as evidence that
the required training has been
completed.
MSHA requires that escapeway maps
show the SCSR storage locations.
Accurate and up-to-date maps are
essential to the engineering plans and
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
63795
safe operation of mines and to the
health and safety of the miners. MSHA
and other emergency evacuation
personnel will use the notations on the
maps should a rescue or recovery
operation be necessary. Miners use the
escapeway maps in training and during
mine evacuations. Escapeway maps are
required to be posted or readily
accessible for all miners in each
working section, areas where
mechanized mining equipment is being
installed or removed, at surface
locations where miners congregate and
in each refuge alternative.
MSHA requires that persons that test
Self-Contained, Self-Rescuers (SCSRs)
certify that the tests were done and
record all corrective actions. MSHA
inspectors use these records to
determine compliance with the
standards. It includes requirements for
compiling, maintaining, and reporting
an inventory of all SCSRs at the mine,
and for reporting defects, performance
problems, or malfunctions with SCSRs.
This will assure that MSHA can
investigate SCSR problems, if necessary,
notify other users of these problems
before accidents occur and require
manufacturers to address potential
problems with these critical devices:
Type of Review: Extension.
Agency: Mine Safety and Health
Administration.
Title: Emergency Mine Evacuation.
OMB Number: 1219–0141.
Frequency: On Occasion.
Affected Public: Business or other forprofit.
Respondents: 1,084,830.
Total Responses: 622.
Total Burden Hours: 7,836 hours.
Total Burden Cost: $68,528.
Comments submitted in response to
this notice will be summarized and/or
included in the request for Office of
Management and Budget approval of the
information collection request; they will
also become a matter of public record.
Dated at Arlington, Virginia, this 30th day
of November 2009.
John Rowlett,
Director, Management Services Division.
[FR Doc. E9–28893 Filed 12–3–09; 8:45 am]
BILLING CODE 4510–43–P
DEPARTMENT OF LABOR
Employment and Training
Administration
Filing Locations for Foreign Labor
Certification Program Temporary
Program Applications; Change of
Address
AGENCY: Employment and Training
Administration, Department of Labor.
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 74, Number 232 (Friday, December 4, 2009)]
[Notices]
[Pages 63794-63795]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-28893]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF LABOR
Mine Safety and Health Administration
Proposed Information Collection Request Submitted for Public
Comment and Recommendations; Emergency Mine Evacuation
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Department of Labor, as part of its continuing effort to
reduce paperwork and respondent burden conducts a pre-clearance
consultation program to provide the general public and Federal agencies
with an opportunity to comment on proposed and/or continuing
collections of information in accordance with the Paperwork Reduction
Act of 1995 (PRA95) [44 U.S.C. 3506 (c)(2)(A)]. This program helps to
ensure that requested data can be provided in the desired format,
reporting burden (time and financial resources) is minimized,
collection instruments are clearly understood, and the impact of
collection requirements on respondents can be properly assessed.
Currently, the Mine Safety and Health Administration (MSHA) is
soliciting comments concerning the extension of the information
collection related to Emergency Mine Evacuation: 30 CFR 48.3--Training
plans; time of submission; where filed; information required; time for
approval; method for disapproval; commencement of training; approval of
instructors; 30 CFR 75.1502--Mine emergency evacuation and firefighting
program of instruction; 30 CFR 75.1504--Mine emergency evacuation
training and drills; 30 CFR 75.1505--Escapeway maps. 30 CFR 75.1714-3--
Self-rescue devices; inspection, testing, maintenance, repair, and
recordkeeping; 30 CFR 75.1714-5--Map locations of self-contained self-
rescuers (SCSRs); 30 CFR 75.1714-8--Reporting SCSR inventory and
malfunctions; retention of SCSRs.
DATES: Submit comments on or before February 2, 2010.
ADDRESSES: Send comments to U.S. Department of Labor, Mine Safety and
Health Administration, John Rowlett, Director, Management Services
Division, 1100 Wilson Boulevard, Room 2134, Arlington, VA 22209-3939.
[[Page 63795]]
Commenters are encouraged to send their comments via e-mail to
Rowlett.John@dol.gov. Mr. Rowlett can be reached at (202) 693-9827
(voice), or (202) 693-9801 (facsimile).
FOR FURTHER INFORMATION: Contact the employee listed in the ADDRESSES
section of this notice.
SUPPLEMENTARY INFORMATION:
I. Background
The Mine Safety and Health Administration (MSHA) issued a final
rule addressing emergency mine evacuation in 2006. This regulation
included requirements for immediate accident notification applicable to
all mines. In addition, it contained requirements for new and expanded
training, including evacuation drills; self-contained self-rescuer
(SCSR) storage, training, and use; and the installation and maintenance
of lifelines in underground coal mines.
Submission of training plans and programs of instruction and
certification that training was done provides MSHA, operators, and
miners with confidence that training is appropriate and was conducted
as necessary, particularly when MSHA is not able to be at the mine.
Without adequate training, miners may sustain serious or even fatal
injuries because they lack the knowledge to properly and safely perform
various tasks and activities or evacuate a mine.
If inspections and monitoring of SCSRs did not occur, this could
allow unsafe conditions to go undetected and the SCSRs might not be
usable when needed. This would endanger miners' safety.
If operators were not required to submit an SCSR inventory or to
notify MSHA when they encounter an SCSR defect, performance problem, or
malfunction, MSHA would not have the information needed to notify other
mines that may also use the affected SCSRs. This could endanger miners
because operators could continue to rely on deficient SCSRs.
II. Desired Focus of Comments
MSHA is particularly interested in comments that:
Evaluate whether the proposed collection of information is
necessary for the proper performance of the functions of the agency,
including whether the information will have practical utility;
Evaluate the accuracy of the agency's estimate of the
burden of the proposed collection of information, including the
validity of the methodology and assumptions used;
Enhance the quality, utility, and clarity of the
information to be collected; and
Minimize the burden of the collection of information on
those who are to respond, including through the use of appropriate
automated, electronic, mechanical, or other technological collection
techniques or other forms of information technology, e.g., permitting
electronic submissions of responses.
A copy of the proposed information collection request can be obtained
by contacting the employee listed in the ADDRESSES section of this
notice, or viewed on the Internet by accessing the MSHA home page
(https://www.msha.gov/) and selecting ``Rules & Regs'', and then
selecting ``FedReg. Docs''. On the next screen, select ``Paperwork
Reduction Act Supporting Statement'' to view documents supporting the
Federal Register Notice.
III. Current Actions
Information collected is used by the mine operator and MSHA to
ensure that underground coal operators modify their training plans
whenever they modify their program of instruction. This will ensure
that newly hired miners receive the same level of training as is
required for other miners. Operators use part 48 training plans to
train each miner about the safety and health aspects of the mining
environment and the tasks associated with the miner's job. MSHA uses
the plans to ensure that all miners are receiving training necessary to
perform their jobs in a safe manner.
MSHA requires underground coal operators to submit a Mine Emergency
Evacuation and Firefighting Program of Instruction to the District
Manager for approval. Upon approval by the MSHA District Manager, the
operator uses the approved program of instruction to implement programs
for training miners in responding appropriately to mine emergencies.
MSHA uses the plans to ensure that the operator's program will provide
the required training and drills to all miners.
MSHA requires the operator to certify the training and drill for
each miner at the completion of each quarterly drill, annual
expectations training, or other training, and that a copy be provided
to the miner upon request. These certifications are used by MSHA,
operators, and miners as evidence that the required training has been
completed.
MSHA requires that escapeway maps show the SCSR storage locations.
Accurate and up-to-date maps are essential to the engineering plans and
safe operation of mines and to the health and safety of the miners.
MSHA and other emergency evacuation personnel will use the notations on
the maps should a rescue or recovery operation be necessary. Miners use
the escapeway maps in training and during mine evacuations. Escapeway
maps are required to be posted or readily accessible for all miners in
each working section, areas where mechanized mining equipment is being
installed or removed, at surface locations where miners congregate and
in each refuge alternative.
MSHA requires that persons that test Self-Contained, Self-Rescuers
(SCSRs) certify that the tests were done and record all corrective
actions. MSHA inspectors use these records to determine compliance with
the standards. It includes requirements for compiling, maintaining, and
reporting an inventory of all SCSRs at the mine, and for reporting
defects, performance problems, or malfunctions with SCSRs. This will
assure that MSHA can investigate SCSR problems, if necessary, notify
other users of these problems before accidents occur and require
manufacturers to address potential problems with these critical
devices:
Type of Review: Extension.
Agency: Mine Safety and Health Administration.
Title: Emergency Mine Evacuation.
OMB Number: 1219-0141.
Frequency: On Occasion.
Affected Public: Business or other for-profit.
Respondents: 1,084,830.
Total Responses: 622.
Total Burden Hours: 7,836 hours.
Total Burden Cost: $68,528.
Comments submitted in response to this notice will be summarized
and/or included in the request for Office of Management and Budget
approval of the information collection request; they will also become a
matter of public record.
Dated at Arlington, Virginia, this 30th day of November 2009.
John Rowlett,
Director, Management Services Division.
[FR Doc. E9-28893 Filed 12-3-09; 8:45 am]
BILLING CODE 4510-43-P