Job Corps: Preliminary Finding of No Significant Impact (FONSI) for the Edison Job Corps Center Solar PV Project located at the Edison Job Corps Center, 45252-45253 [E9-20973]
Download as PDF
45252
Federal Register / Vol. 74, No. 168 / Tuesday, September 1, 2009 / Notices
v. Alcan Aluminum Ltd., 605 F. Supp. 619,
622 (W.D. Ky. 1985), (approving the consent
decree even though the court would have
imposed a greater remedy). To meet this
standard, the United States ‘‘need only
provide a factual basis for concluding that
the settlements are reasonably adequate
remedies for the alleged harms.’’ SBC
Commc’ns, 489 F. Supp. 2d at 17.
Moreover, the court’s role under the APPA
is limited to reviewing the remedy in
relationship to the violations that the United
States has alleged in its Complaint, and does
not authorize the court to ‘‘construct [its]
own hypothetical case and then evaluate the
decree against that case.’’ Microsoft, 56 F.3d
at 1459. Because the ‘‘court’s authority to
review the decree depends entirely on the
government’s exercising its prosecutorial
discretion by bringing a case in the first
place,’’ it follows that ‘‘the court is only
authorized to review the decree itself,’’ and
not to ‘‘effectively redraft the complaint’’ to
inquire into other matters that the United
States did not pursue. Id. at 1459–60. As
confirmed in SBC Communications, courts
‘‘cannot look beyond the complaint in
making the public interest determination
unless the complaint is drafted so narrowly
as to make a mockery of judicial power.’’ 489
F. Supp. 2d at 15.
In its 2004 amendments, Congress made
clear its intent to preserve the practical
benefits of utilizing consent decrees in
antitrust enforcement, adding the
unambiguous instruction that ‘‘[n]othing in
this section shall be construed to require the
court to conduct an evidentiary hearing or to
require the court to permit anyone to
intervene.’’ 15 U.S.C. 16(e)(2). The language
wrote into the statute what Congress
intended when it enacted the Tunney Act in
1974, as Senator Tunney explained: ‘‘[t]he
court is nowhere compelled to go to trial or
to engage in extended proceedings which
might have the effect of vitiating the benefits
of prompt and less costly settlement through
the consent decree process.’’ 119 Cong. Rec.
24,598 (1973) (statement of Senator Tunney).
Rather, the procedure for the public interest
determination is left to the discretion of the
court, with the recognition that the court’s
‘‘scope of review remains sharply proscribed
by precedent and the nature of Tunney Act
proceedings.’’ SBC Commc’ns, 489 F. Supp.
2d at 11.6
mstockstill on DSKH9S0YB1PROD with NOTICES
VIII. Determinative Documents
There are no determinative materials or
documents within the meaning of the APPA
6 See United States v. Enova Corp., 107 F. Supp.
2d 10, 17 (D.D.C. 2000) (noting that the ‘‘Tunney
Act expressly allows the court to make its public
interest determination on the basis of the
competitive impact statement and response to
comments alone’’); United States v. Mid-Am.
Dairymen, Inc., 1977–1 Trade Cas. (CCH) ¶ 61,508,
at 71,980 (W.D. Mo. 1977) (‘‘Absent a showing of
corrupt failure of the government to discharge its
duty, the Court, in making its public interest
finding, should * * * carefully consider the
explanations of the government in the competitive
impact statement and its responses to comments in
order to determine whether those explanations are
reasonable under the circumstances.’’); S. Rep. No.
93–298, 93d Cong., 1st Sess., at 6 (1973) (‘‘Where
the public interest can be meaningfully evaluated
simply on the basis of briefs and oral arguments,
that is the approach that should be utilized.’’).
VerDate Nov<24>2008
22:09 Aug 31, 2009
Jkt 217001
that were considered by the United States in
formulating the proposed Final Judgment.
Dated: August 20, 2009.
Respectfully submitted,
By: lll/s/lll
Lowell R. Stern, Attorney for Plaintiff.
Certificate of Service
I hereby certify that on the 20th day
of August, 2009, I will electronically file
the foregoing with the Clerk of Court
using the CM/ECF system, which will
then send a notification of such filing
(NEF) to the following:
Brett J. Williamson,
Darin J. Glasser,
O’Melveny & Myers LLP, 610 Newport
Center Drive, 17th Floor, Newport
Beach, CA 92660–6429.
Michael E. Antalics,
Benjamin G. Bradshaw,
O’Melveny & Myers LLP, 1625 Eye
Street, NW., Washington, DC 20006.
lll/s/lll
Lowell R. Stern,
Attorney for Plaintiff.
[FR Doc. E9–21051 Filed 8–31–09; 8:45 am]
BILLING CODE 4410–11–P
DEPARTMENT OF LABOR
Office of the Secretary
Job Corps: Preliminary Finding of No
Significant Impact (FONSI) for the
Solar Photovoltaic (PV) Project located
at Westover Job Corp Center, 103
Johnson Drive, Chicopee, MA
AGENCY: Office of the Secretary,
Department of Labor.
Recovery: This project will be wholly
funded under the American Recovery
and Reconstruction Act of 2009.
ACTION: Preliminary Finding of No
Significant Impact (FONSI) for Solar PV
Panel Installation to be located at the
Westover Job Corp Center, 103 Johnson
Drive, Chicopee, Massachusetts.
SUMMARY: Pursuant to the Council on
Environmental Quality Regulations (40
CFR part 1500–08) implementing
procedural provisions of the National
Environmental Policy Act (NEPA), the
Department of Labor, Office of the
Secretary (OSEC) in accordance with 29
CFR 11.11(d), gives notice that an
Environmental Assessment (EA) has
been prepared for a proposed Solar PV
Project to be located at the Westover Job
Corp Center, 103 Johnson Drive,
Chicopee, Massachusetts, and that the
proposed plan for the construction of
solar PV panels at the Westover Job
Corps Center will have no significant
environmental impact. This Preliminary
Finding of No Significant Impact
(FONSI) will be made available for
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
public review and comment for a period
of 30 days.
DATES: Comments must be submitted by
October 1, 2009.
ADDRESSES: Any comment(s) are to be
submitted to William A. Dakshaw, P.E.,
Division of Facilities and Asset
Management, Department of Labor, 200
Constitution Avenue, NW., Room N–
4460, Washington, DC 20210, (202) 693–
2867 (this is not a toll-free number).
FOR FURTHER INFORMATION CONTACT:
Copies of the EA are available to
interested parties by contacting William
A. Dakshaw, P.E., Division of Facilities
and Asset Management, Department of
Labor, 200 Constitution Avenue, NW.,
Room N–4460, Washington, DC 20210,
(202) 693–2867 (this is not a toll-free
number).
This EA
summary addresses the proposed
construction of approximately 1.5 acres
of stationary solar photovoltaic (PV)
panels to create a 150 to 200 kilowatt
system connected to the closest
electrical terminal at the Westover Job
Corps Center. The solar panels will
produce clean energy for the Westover
Job Corps Center, demonstrate
renewable energy capabilities to Job
Corps Students and help the program
meet Federal requirements in Executive
Order 13423 for renewable energy
production. This project is not expected
to have a negative impact on population
demographics, the surrounding area,
environmental quality, or natural
systems and heritage.
Based on the information gathered
during the preparation of the EA, the
construction of the Solar PV Project at
Westover Job Corp Center, 103 Johnson
Drive, Chicopee, Massachusetts will not
create any significant adverse impacts
on the environment.
SUPPLEMENTARY INFORMATION:
Dated: August 25, 2009.
Lynn Intrepidi,
Interim National Director of Job Corps.
[FR Doc. E9–20969 Filed 8–31–09; 8:45 am]
BILLING CODE 4510–23–P
DEPARTMENT OF LABOR
Office of the Secretary
Job Corps: Preliminary Finding of No
Significant Impact (FONSI) for the
Edison Job Corps Center Solar PV
Project located at the Edison Job
Corps Center
AGENCY: Office of the Secretary,
Department of Labor.
E:\FR\FM\01SEN1.SGM
01SEN1
Federal Register / Vol. 74, No. 168 / Tuesday, September 1, 2009 / Notices
mstockstill on DSKH9S0YB1PROD with NOTICES
ACTION: Preliminary Finding of No
Significant Impact (FONSI) for Solar
Panel Installation for the Edison Job
Corps Center Solar PV Project to be
located at the Edison Job Corps Center,
500 Plainfield Avenue, Township of
Edison, New Jersey 08817 (Edison JCC).
SUMMARY: Pursuant to the Council on
Environmental Quality Regulations (40
CFR part 1500–08) implementing
procedural provisions of the National
Environmental Policy Act (NEPA), the
Department of Labor, Office of the
Secretary (OSEC) in accordance with 29
CFR 11.11(d), gives notice that an
Environmental Assessment (EA) has
been prepared for a proposed Edison Job
Corps Center Solar PV Project to be
located at the Edison JCC, and that the
proposed plan for the construction of
solar panels at the Edison JCC will have
no significant environmental impact.
This Preliminary Finding of No
Significant Impact (FONSI) will be
made available for public review and
comment for a period of 30 days.
DATES: Comments must be submitted by
October 1, 2009.
ADDRESSES: Any comment(s) are to be
submitted to William A. Dakshaw, P.E.,
Division of Facilities and Asset
Management, Department of Labor, 200
Constitution Avenue, NW., Room N–
4460, Washington, DC 20210, (202) 693–
2867 (this is not a toll-free number).
FOR FURTHER INFORMATION CONTACT:
Copies of the EA are available to
interested parties by contacting William
A. Dakshaw, P.E., Division of Facilities
and Asset Management, Department of
Labor, 200 Constitution Avenue, NW.,
Room N–4460, Washington, DC 20210,
(202) 693–2867 (this is not a toll-free
number).
SUPPLEMENTARY INFORMATION: This EA
summary addresses the proposed
construction of solar panels located at
the Edison JCC. The proposed project
includes a renewable energy project that
will consist of installing 10 rows of Ying
Li 175 Photovoltaic Modules in an east/
west orientation. The 1,620 modules
will be fixed at 20 degrees. The solar
panel rows and associated equipment
will be surrounded by a fence. The
entire proposed installation will
encompass approximately 2 acres of the
Edison JCC and will be located in an
undeveloped grass lawn area
surrounded by dormitory buildings on
the south, storage sheds to the east, and
the border of the facility to the west and
north. The proposed project will enable
the generation of approximately 284
kilowatts during optimal performance.
Solar-generated electricity created by
the solar photovoltaic system will
VerDate Nov<24>2008
17:18 Aug 31, 2009
Jkt 217001
reduce pollution and the demand for
fossil fuels. The solar panels will
generate energy for the Edison JCC,
demonstrate renewable energy
capabilities to Job Corps Students, and
help the program meet Federal
requirements in Executive Order 13423
for renewable energy production.
This project is not expected to have a
negative impact on population
demographics, the surrounding area,
environmental quality, or natural
systems and heritage. Based on the
information gathered during the
preparation of the EA, the construction
of the Edison Job Corps Center Solar PV
Project at the Edison JCC will not create
any significant adverse impacts on the
environment.
Dated: August 25, 2009.
Lynn Intrepidi,
Interim National Director of Job Corps.
[FR Doc. E9–20973 Filed 8–31–09; 8:45 am]
BILLING CODE 4510–23–P
DEPARTMENT OF LABOR
Office of the Secretary
Job Corps: Preliminary Finding of No
Significant Impact (FONSI) for Small
Wind Turbine Installation at the HawaiiMaui Job Corps Center Located at 500
Ike Drive Makawao, Island of Maui, HI
96768
AGENCY: Office of the Secretary,
Department of Labor.
Recovery: This project will be wholly
funded under the American Recovery
and Reconstruction Act of 2009.
ACTION: Preliminary Finding of No
Significant Impact (FONSI) for Small
Wind Turbine Installation to be located
at the Hawaii-Maui Job Corp Center, 500
Ike Drive Makawao, Island of Maui,
Hawaii 96768.
SUMMARY: Pursuant to the Council on
Environmental Quality Regulations (40
CFR part 1500–08) implementing
procedural provisions of the National
Environmental Policy Act (NEPA), the
Department of Labor, Office of the
Secretary (OSEC) in accordance with 29
CFR 11.11(d), gives notice that an
Environmental Assessment (EA) has
been prepared for a proposed Wind
Turbine Installation to be located at the
Hawaii-Maui Job Corp Center, 500 Ike
Drive Makawao, Island of Maui, Hawaii
96768, and that the proposed plan for
the construction of a wind turbine at the
Hawaii/Maui Job Corps Center will have
no significant environmental impact.
This Preliminary Finding of No
Significant Impact (FONSI) will be
PO 00000
Frm 00095
Fmt 4703
Sfmt 4703
45253
made available for public review and
comment for a period of 30 days.
DATES: Comments must be submitted by
October 1, 2009.
ADDRESSES: Any comment(s) are to be
submitted to William A. Dakshaw, P.E.,
Division of Facilities and Asset
Management, Department of Labor, 200
Constitution Avenue, NW., Room N–
4460, Washington, DC 20210, (202) 693–
2867 (this is not a toll-free number).
FOR FURTHER INFORMATION CONTACT:
Copies of the EA are available to
interested parties by contacting William
A. Dakshaw, P.E., Division of Facilities
and Asset Management, Department of
Labor, 200 Constitution Avenue, NW.,
Room N–4460, Washington, DC 20210,
(202) 693–2867 (this is not a toll-free
number).
The
proposed project includes a renewable
energy project that will consist of the
construction of a 1–100 kW wind
turbine or 2–50 kW wind turbines. The
proposed project will enable the Job
Corps to generate their own clean power
at the facility. The wind turbines will be
installed on self supporting towers
approximately 120 feet above the
ground. The wind turbines will produce
clean energy for the Hawaii-Maui Job
Corps Center, demonstrate renewable
energy capabilities to Job Corps
Students and help the program meet
Federal requirements in Executive
Order 13423 for renewable energy
production. This project is not expected
to have a negative impact on population
demographics, the surrounding area,
environmental quality, or natural
systems and heritage. Based on the
information gathered during the
preparation of the EA, the construction
of a wind turbine at the Hawaii-Maui
Job Corp Center, 500 Ike Drive
Makawao, Island of Maui, Hawaii 96768
will not create any significant adverse
impacts on the environment.
SUPPLEMENTARY INFORMATION:
Dated: August 25, 2009.
Lynn Intrepidi,
Interim National Director of Job Corps.
[FR Doc. E9–20971 Filed 8–31–09; 8:45 am]
BILLING CODE 4510–23–P
E:\FR\FM\01SEN1.SGM
01SEN1
Agencies
[Federal Register Volume 74, Number 168 (Tuesday, September 1, 2009)]
[Notices]
[Pages 45252-45253]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20973]
-----------------------------------------------------------------------
DEPARTMENT OF LABOR
Office of the Secretary
Job Corps: Preliminary Finding of No Significant Impact (FONSI)
for the Edison Job Corps Center Solar PV Project located at the Edison
Job Corps Center
AGENCY: Office of the Secretary, Department of Labor.
[[Page 45253]]
ACTION: Preliminary Finding of No Significant Impact (FONSI) for Solar
Panel Installation for the Edison Job Corps Center Solar PV Project to
be located at the Edison Job Corps Center, 500 Plainfield Avenue,
Township of Edison, New Jersey 08817 (Edison JCC).
-----------------------------------------------------------------------
SUMMARY: Pursuant to the Council on Environmental Quality Regulations
(40 CFR part 1500-08) implementing procedural provisions of the
National Environmental Policy Act (NEPA), the Department of Labor,
Office of the Secretary (OSEC) in accordance with 29 CFR 11.11(d),
gives notice that an Environmental Assessment (EA) has been prepared
for a proposed Edison Job Corps Center Solar PV Project to be located
at the Edison JCC, and that the proposed plan for the construction of
solar panels at the Edison JCC will have no significant environmental
impact. This Preliminary Finding of No Significant Impact (FONSI) will
be made available for public review and comment for a period of 30
days.
DATES: Comments must be submitted by October 1, 2009.
ADDRESSES: Any comment(s) are to be submitted to William A. Dakshaw,
P.E., Division of Facilities and Asset Management, Department of Labor,
200 Constitution Avenue, NW., Room N-4460, Washington, DC 20210, (202)
693-2867 (this is not a toll-free number).
FOR FURTHER INFORMATION CONTACT: Copies of the EA are available to
interested parties by contacting William A. Dakshaw, P.E., Division of
Facilities and Asset Management, Department of Labor, 200 Constitution
Avenue, NW., Room N-4460, Washington, DC 20210, (202) 693-2867 (this is
not a toll-free number).
SUPPLEMENTARY INFORMATION: This EA summary addresses the proposed
construction of solar panels located at the Edison JCC. The proposed
project includes a renewable energy project that will consist of
installing 10 rows of Ying Li 175 Photovoltaic Modules in an east/west
orientation. The 1,620 modules will be fixed at 20 degrees. The solar
panel rows and associated equipment will be surrounded by a fence. The
entire proposed installation will encompass approximately 2 acres of
the Edison JCC and will be located in an undeveloped grass lawn area
surrounded by dormitory buildings on the south, storage sheds to the
east, and the border of the facility to the west and north. The
proposed project will enable the generation of approximately 284
kilowatts during optimal performance. Solar-generated electricity
created by the solar photovoltaic system will reduce pollution and the
demand for fossil fuels. The solar panels will generate energy for the
Edison JCC, demonstrate renewable energy capabilities to Job Corps
Students, and help the program meet Federal requirements in Executive
Order 13423 for renewable energy production.
This project is not expected to have a negative impact on
population demographics, the surrounding area, environmental quality,
or natural systems and heritage. Based on the information gathered
during the preparation of the EA, the construction of the Edison Job
Corps Center Solar PV Project at the Edison JCC will not create any
significant adverse impacts on the environment.
Dated: August 25, 2009.
Lynn Intrepidi,
Interim National Director of Job Corps.
[FR Doc. E9-20973 Filed 8-31-09; 8:45 am]