Scott's Mill Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 75701-75702 [E8-29473]

Download as PDF Federal Register / Vol. 73, No. 240 / Friday, December 12, 2008 / Notices for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. All filings must (1) Bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Commission issues EA. Comments on EA ...... Target date May 2009 June 2009 p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. Kimberly D. Bose, Secretary. [FR Doc. E8–29470 Filed 12–11–08; 8:45 am] jlentini on PROD1PC65 with NOTICES BILLING CODE 6717–01–P VerDate Aug<31>2005 19:56 Dec 11, 2008 Jkt 217001 assistance, call toll-free 1–866–208– 3372. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–29472 Filed 12–11–08; 8:45 am] [Project No. 13288–000] Riverbank Ogdensburg, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2008. On September 23, 2008, Riverbank Ogdensburg, LLC filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Ogdensburg Pumped Storage Project to be located on the St. Lawrence River in St. Lawrence County, New York. The proposed project would consist of: (1) The St. Lawrence River as an upper reservoir; (2) an underground lower reservoir with an elevation of 1,800 feet below MSL and a storage capacity of 3,775 acre-feet; (3) four 13 foot diameter, 2,000 foot long, concrete and steel penstocks; (4) an underground powerhouse containing four pump/ turbine units with a total installed capacity of 1,000 MW; (5) a 345 kV, 18.6 mile long transmission line; and (6) appurtenant facilities. The annual production would be 2,190 GWh which would be sold to a local utility. Applicant Contact: William S. Helmer, Esq., 194 Washington Ave., Suite 315, Albany, New York 12210 (518) 689–3570. FERC Contact: Kelly Houff (202) 502– 6393. Deadline for filing comments, motions to intervene: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13288) in the docket number field to access the document. For PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 75701 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13302–000] Scott’s Mill Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2008. On October 14, 2008, Scott’s Mill Hydropower, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Scott’s Mill Hydropower Project to be located in Amherst and Bedford Counties, Virginia. The proposed project consists of: (1) An existing 15-foot-high, 925-foot-long masonry dam, (2) an existing reservoir having a surface area of 316 acres, a storage capacity of 3,790 acre-feet, and normal maximum water surface elevation of 511 feet msl, (3) a proposed powerhouse with 4 generating units having a total capacity of 3.6 MW; (4) a proposed 250-foot-long transmission line; and (5) appurtenant facilities. The project would have an annual generation of 14.9 GWh, and would be sold to a local utility. Applicant Contact: Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 27027, Phone: 336–589–6138. FERC Contact: Henry Woo, 202–502–8872. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// E:\FR\FM\12DEN1.SGM 12DEN1 75702 Federal Register / Vol. 73, No. 240 / Friday, December 12, 2008 / Notices www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13302) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–29473 Filed 12–11–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–27–000] Southern Natural Gas Company; Notice of Application jlentini on PROD1PC65 with NOTICES December 8, 2008. Take notice that on November 26, 2008, Southern Natural Gas Company (Southern), 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, filed in the above referenced docket an application pursuant to section 7(b) of the Natural Gas Act (NGA) and part 157 of the Commission’s regulations, for an order approving the abandonment of approximately 97 miles of pipe in various segments and appurtenant facilities located on Southern’s North Main Loop Pipeline in Sharkey, Yazoo, Winston, Noxubee, and Lowndes Counties, Mississippi, and Pickens and Tuscaloosa Counties, Alabama, and abandonment of three small compressor units at Southern’s Onward Compressor Station in Sharkey County, Mississippi. Southern also proposes to make certain modifications that will allow Southern to continue meeting its firm capacity requirements on the North Main Line and the North Main 2nd Loop Line, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. Any questions concerning this application may be directed to Patrick B. Pope, Vice President and General Counsel, Southern Natural Gas VerDate Aug<31>2005 17:56 Dec 11, 2008 Jkt 217001 Company, 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209 at (205) 325–7126, or Patricia S. Francis, Senior Counsel, Southern Natural Gas Company, 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209 at (205) 325–7696. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: December 29, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–29471 Filed 12–11–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–19–000] Port Barre Investments, L.L.C. (d/b/a Bobcat Gas Storage); Notice of Intent To Prepare an Environmental Assessment for the Proposed Bobcat Gas Storage Project Expansion and Request for Comments on Environmental Issues December 8, 2008. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the proposed Bobcat Gas Storage Project Expansion (Bobcat Expansion) involving construction and operation of additional natural gas storage caverns and pipeline facilities by Port Barre Investments, L.L.C. (d/b/a Bobcat Gas Storage (Bobcat)) in St. Landry Parish, Louisiana.1 The EA will be used by the 1 The Bobcat Gas Storage Project was authorized by the Commission on July 20, 2006 in Docket No. CP06–66–000, and amended on April 19, 2007 and March 4, 2008 in Docket Nos. CP06–66–001 and E:\FR\FM\12DEN1.SGM 12DEN1

Agencies

[Federal Register Volume 73, Number 240 (Friday, December 12, 2008)]
[Notices]
[Pages 75701-75702]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-29473]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13302-000]


Scott's Mill Hydropower, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

December 8, 2008.
    On October 14, 2008, Scott's Mill Hydropower, LLC filed an 
application, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Scott's Mill Hydropower 
Project to be located in Amherst and Bedford Counties, Virginia.
    The proposed project consists of: (1) An existing 15-foot-high, 
925-foot-long masonry dam, (2) an existing reservoir having a surface 
area of 316 acres, a storage capacity of 3,790 acre-feet, and normal 
maximum water surface elevation of 511 feet msl, (3) a proposed 
powerhouse with 4 generating units having a total capacity of 3.6 MW; 
(4) a proposed 250-foot-long transmission line; and (5) appurtenant 
facilities. The project would have an annual generation of 14.9 GWh, 
and would be sold to a local utility.
    Applicant Contact: Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 
27027, Phone: 336-589-6138. FERC Contact: Henry Woo, 202-502-8872.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``eFiling'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://

[[Page 75702]]

www.ferc.gov/filing-comments.asp. More information about this project 
can be viewed or printed on the ``eLibrary'' link of the Commission's 
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the 
docket number (P-13302) in the docket number field to access the 
document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-29473 Filed 12-11-08; 8:45 am]
BILLING CODE 6717-01-P