Scott's Mill Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 75701-75702 [E8-29473]
Download as PDF
Federal Register / Vol. 73, No. 240 / Friday, December 12, 2008 / Notices
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. All filings must (1) Bear in all
capital letters the title ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or ‘‘FISHWAY
PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Commission issues
EA.
Comments on EA ......
Target date
May 2009
June 2009
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29470 Filed 12–11–08; 8:45 am]
jlentini on PROD1PC65 with NOTICES
BILLING CODE 6717–01–P
VerDate Aug<31>2005
19:56 Dec 11, 2008
Jkt 217001
assistance, call toll-free 1–866–208–
3372.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29472 Filed 12–11–08; 8:45 am]
[Project No. 13288–000]
Riverbank Ogdensburg, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
December 8, 2008.
On September 23, 2008, Riverbank
Ogdensburg, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Ogdensburg Pumped
Storage Project to be located on the St.
Lawrence River in St. Lawrence County,
New York.
The proposed project would consist
of: (1) The St. Lawrence River as an
upper reservoir; (2) an underground
lower reservoir with an elevation of
1,800 feet below MSL and a storage
capacity of 3,775 acre-feet; (3) four 13
foot diameter, 2,000 foot long, concrete
and steel penstocks; (4) an underground
powerhouse containing four pump/
turbine units with a total installed
capacity of 1,000 MW; (5) a 345 kV, 18.6
mile long transmission line; and (6)
appurtenant facilities. The annual
production would be 2,190 GWh which
would be sold to a local utility.
Applicant Contact: William S.
Helmer, Esq., 194 Washington Ave.,
Suite 315, Albany, New York 12210
(518) 689–3570.
FERC Contact: Kelly Houff (202) 502–
6393.
Deadline for filing comments, motions
to intervene: 60 days from the issuance
of this notice. Comments, motions to
intervene, notices of intent and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13288) in the docket number
field to access the document. For
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
75701
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13302–000]
Scott’s Mill Hydropower, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
December 8, 2008.
On October 14, 2008, Scott’s Mill
Hydropower, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Scott’s Mill
Hydropower Project to be located in
Amherst and Bedford Counties,
Virginia.
The proposed project consists of: (1)
An existing 15-foot-high, 925-foot-long
masonry dam, (2) an existing reservoir
having a surface area of 316 acres, a
storage capacity of 3,790 acre-feet, and
normal maximum water surface
elevation of 511 feet msl, (3) a proposed
powerhouse with 4 generating units
having a total capacity of 3.6 MW; (4) a
proposed 250-foot-long transmission
line; and (5) appurtenant facilities. The
project would have an annual
generation of 14.9 GWh, and would be
sold to a local utility.
Applicant Contact: Mr. Kevin
Edwards, P.O. Box 143, Mayodan, NC
27027, Phone: 336–589–6138. FERC
Contact: Henry Woo, 202–502–8872.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
E:\FR\FM\12DEN1.SGM
12DEN1
75702
Federal Register / Vol. 73, No. 240 / Friday, December 12, 2008 / Notices
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13302) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29473 Filed 12–11–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–27–000]
Southern Natural Gas Company;
Notice of Application
jlentini on PROD1PC65 with NOTICES
December 8, 2008.
Take notice that on November 26,
2008, Southern Natural Gas Company
(Southern), 569 Brookwood Village,
Suite 501, Birmingham, Alabama 35209,
filed in the above referenced docket an
application pursuant to section 7(b) of
the Natural Gas Act (NGA) and part 157
of the Commission’s regulations, for an
order approving the abandonment of
approximately 97 miles of pipe in
various segments and appurtenant
facilities located on Southern’s North
Main Loop Pipeline in Sharkey, Yazoo,
Winston, Noxubee, and Lowndes
Counties, Mississippi, and Pickens and
Tuscaloosa Counties, Alabama, and
abandonment of three small compressor
units at Southern’s Onward Compressor
Station in Sharkey County, Mississippi.
Southern also proposes to make certain
modifications that will allow Southern
to continue meeting its firm capacity
requirements on the North Main Line
and the North Main 2nd Loop Line, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions concerning this
application may be directed to Patrick
B. Pope, Vice President and General
Counsel, Southern Natural Gas
VerDate Aug<31>2005
17:56 Dec 11, 2008
Jkt 217001
Company, 569 Brookwood Village, Suite
501, Birmingham, Alabama 35209 at
(205) 325–7126, or Patricia S. Francis,
Senior Counsel, Southern Natural Gas
Company, 569 Brookwood Village, Suite
501, Birmingham, Alabama 35209 at
(205) 325–7696.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: December 29, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–29471 Filed 12–11–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–19–000]
Port Barre Investments, L.L.C. (d/b/a
Bobcat Gas Storage); Notice of Intent
To Prepare an Environmental
Assessment for the Proposed Bobcat
Gas Storage Project Expansion and
Request for Comments on
Environmental Issues
December 8, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the proposed Bobcat Gas Storage Project
Expansion (Bobcat Expansion) involving
construction and operation of additional
natural gas storage caverns and pipeline
facilities by Port Barre Investments,
L.L.C. (d/b/a Bobcat Gas Storage
(Bobcat)) in St. Landry Parish,
Louisiana.1 The EA will be used by the
1 The Bobcat Gas Storage Project was authorized
by the Commission on July 20, 2006 in Docket No.
CP06–66–000, and amended on April 19, 2007 and
March 4, 2008 in Docket Nos. CP06–66–001 and
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 73, Number 240 (Friday, December 12, 2008)]
[Notices]
[Pages 75701-75702]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-29473]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13302-000]
Scott's Mill Hydropower, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
December 8, 2008.
On October 14, 2008, Scott's Mill Hydropower, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Scott's Mill Hydropower
Project to be located in Amherst and Bedford Counties, Virginia.
The proposed project consists of: (1) An existing 15-foot-high,
925-foot-long masonry dam, (2) an existing reservoir having a surface
area of 316 acres, a storage capacity of 3,790 acre-feet, and normal
maximum water surface elevation of 511 feet msl, (3) a proposed
powerhouse with 4 generating units having a total capacity of 3.6 MW;
(4) a proposed 250-foot-long transmission line; and (5) appurtenant
facilities. The project would have an annual generation of 14.9 GWh,
and would be sold to a local utility.
Applicant Contact: Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC
27027, Phone: 336-589-6138. FERC Contact: Henry Woo, 202-502-8872.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``eFiling'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://
[[Page 75702]]
www.ferc.gov/filing-comments.asp. More information about this project
can be viewed or printed on the ``eLibrary'' link of the Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
docket number (P-13302) in the docket number field to access the
document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-29473 Filed 12-11-08; 8:45 am]