August 28, 2007 – Federal Register Recent Federal Regulation Documents
Results 151 - 167 of 167
Notice of Emergency Approval of a New Information Collection; 30-Day Notice of Intent To Request an Extension for the Collection of Information; Interagency Access Pass Application Process
Under provisions of the Paperwork Reduction Act of 1995 and 5 CFR Part 1320, Reporting and Recordkeeping Requirements, the National Park Service (NPS) has requested and received emergency approval on the collection of information; Interagency Access Pass Application Process (OMB 1024-0252). The NPS invites public comments on the extension of this currently approved collection.
30-Day Notice of Submission to the Office of Management and Budget; Opportunity for Public Comment
Under provisions of the Paperwork Reduction Act of 1995 and 5 CFR Part 1320, Reporting and Recordkeeping Requirements, the National Park Service (NPS) invites public comments on a proposed new collection of information (OMB 1024-XXXX).
30-Day Notice of Submission to the Office of Management and Budget; Opportunity for Public Comment
Under provisions of the Paperwork Reduction Act of 1995 and 5 CFR Part 1320, Reporting and Recordkeeping Requirements, the National Park Service (NPS) invites public comments on a proposed new collection of information (OMB 1024-XXXX).
Surety Companies Acceptable on Federal Bonds; FCCI Insurance Company
This is Supplement No. 1 to the Treasury Department Circular 570, 2007 Revision, published July 2, 2007, at 72 FR 36192.
Notice of Proposed Information Collection for 1029-0114
In compliance with the Paperwork Reduction Act of 1995, the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to renew authority to collect information for a series of customer surveys to evaluate OSM's performance in meeting the performance goals outlined in its annual plans developed pursuant to the Government Performance and Results Act (GPRA). The Office of Management and Budget (OMB) previously approved the collection and assigned it clearance number 1029-0114.
Environmental Impact Statement, Canyon and Ada Counties, ID State Highway 44 (SH-44) Corridor Preservation Study
The FHWA hereby gives notice that it intends to prepare an EIS for the proposed preservation of right-of-way for the construction of projects that would increase surface transportation capacity (additional travel lanes, intersection improvements) and improve operating conditions and safety (access management improvements) for both near-term and long-term needs. This EIS is being prepared and considered in accordance with the National Environmental Policy Act (NEPA) of 1969, regulations of the Council on Environmental Quality (40 CFR parts 150-1508), and FHWA regulations, guidance and policy. Anticipated Federal approvals/actions needed for this project to be constructed include permits for sections 401 and 404 of the Clean Water Act (U.S. Army Corps of Engineers) and compliance with section 4(f) of the Department of Transportation Act, section 7 of the Endangered Species Act and section 106 of the national Historic Preservation Act. Cooperating Agencies: There are no cooperating agencies identified for this project.
Onions Grown in South Texas; Change in Regulatory Period
The Department of Agriculture (USDA) is adopting, as a final rule, without change, an interim final rule revising the regulatory period for minimum grade, size, quality, and maturity requirements applicable to onions grown in South Texas under Marketing Order No. 959 (order). Prior to implementation of the interim final rule, the regulatory period for South Texas onions was March 1 through June 4 of each year. Changes in available varieties, growing seasons, and marketing opportunities over the years have resulted in a prolonged onion shipping season that now extends beyond June 4 into mid-July. This rule continues in effect the action that extended the regulatory period through July 15. The South Texas Onion Committee (Committee), which locally administers the order, unanimously recommended the change.
Nectarines and Peaches Grown in California; Revision of Handling Requirements for Fresh Nectarines and Peaches
The Department of Agriculture (USDA) is adopting, as a final rule, without change, an interim final rule eliminating grade, size, maturity, pack, container and inspection requirements for all California nectarines and peaches except those packed in containers labeled ``California Well Matured'' or ``CA WELL MAT.'' This rule also continues in effect seasonal adjustments to the handling requirements applicable to well matured fruit and the removal of certain handler reporting requirements that are deemed no longer necessary. The marketing orders regulate the handling of nectarines and peaches grown in California and are administered locally by the Nectarine Administrative and Peach Commodity Committees (committees). This rule reduces handler costs while enabling handlers to continue to meet the demands of their buyers.
Proposed Advisory Circular No. 120-53A, Crew Qualification and Pilot Type Rating Requirements for Transport Category Aircraft Operated Under 14 CFR Part 121
This notice announces the availability of and requests comments on a proposed revision to Advisory Circular (AC) No. 120-53, Crew Qualification and Pilot Type Rating Requirements for Transport Category Aircraft Operated under 14 CFR part 121. That AC provides the Federal Aviation Administration (FAA) guidance for the evaluation and approval of flight crew qualification programs and the issuance of pilot type ratings for flight crews operating under 14 CFR part 121. The proposed AC streamlines the process described in AC 120-53 for determining the level of differences between aircraft and the credits the FAA assigns between those aircraft for the purposes of training, checking, and recency of experience requirements. The applicability of the proposed AC would be limited to operations conducted under 14 CFR part 121.
Endangered and Threatened Wildlife and Plants; Designation of Critical Habitat for Catesbaea melanocarpa
We, the U.S. Fish and Wildlife Service (the Service), are designating critical habitat for the endangered plant Catesbaea melanocarpa (no common name) under the Endangered Species Act of 1973, as amended (Act). Approximately 10.5 acres (ac) (4.3 hectares (ha)) fall within the boundaries of the critical habitat designation for C. melanocarpa in one unit located in Halfpenny Bay in Christiansted, St. Croix, U.S. Virgin Islands (USVI).
Licenses, Certifications, and Approvals for Nuclear Power Plants
The Nuclear Regulatory Commission (NRC) is amending its regulations by revising the provisions applicable to the licensing and approval processes for nuclear power plants (i.e., early site permit, standard design approval, standard design certification, combined license, and manufacturing license). These amendments clarify the applicability of various requirements to each of the licensing processes by making necessary conforming amendments throughout the NRC's regulations to enhance the NRC's regulatory effectiveness and efficiency in implementing its licensing and approval processes. The NRC has considered and resolved the public comments.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.