Mechanical Power Presses Standard; Extension of the Office of Management and Budget's (OMB) Approval of Information Collection (Paperwork) Requirements, 17194-17195 [E7-6434]
Download as PDF
17194
Federal Register / Vol. 72, No. 66 / Friday, April 6, 2007 / Notices
[FR Doc. E7–6487 Filed 4–5–07; 8:45 am]
BILLING CODE 4510–FN–P
DEPARTMENT OF LABOR
Occupational Safety and Health
Administration
[Docket No. OSHA–2007–0036]
Mechanical Power Presses Standard;
Extension of the Office of Management
and Budget’s (OMB) Approval of
Information Collection (Paperwork)
Requirements
Occupational Safety and Health
Administration (OSHA), Labor.
ACTION: Request for public comment.
pwalker on PROD1PC71 with NOTICES
AGENCY:
SUMMARY: OSHA solicits comments
concerning its proposal to extend OMB
approval of the information collection
requirements contained in the Standard
on Mechanical Power Presses (29 CFR
1910.217(e)(1)(i) and (e)(1)(ii)). The
purpose of these requirements is to
reduce employees’ risk of death or
serious injury by ensuring that
employers maintain the mechanical
power presses used by the employees in
safe operating condition.
DATES: Comments must be submitted
(postmarked, sent, or received) by June
5, 2007.
ADDRESSES:
Electronically: You may submit
comments and attachments
electronically at https://
www.regulations.gov, which is the
Federal eRulemaking Portal. Follow the
instructions online for submitting
comments.
Facsimile: If your comments,
including attachments, are not longer
than 10 pages, you may fax them to the
OSHA Docket Office at (202) 693–1648.
Mail, hand delivery, express mail,
messenger, or courier service: When
using this method, you must submit
three copies of your comments and
attachments to the OSHA Docket Office,
OSHA Docket No. OSHA–2007–0036,
U.S. Department of Labor, Occupational
Safety and Health Administration,
Room N–2625, 200 Constitution
Avenue, NW., Washington, DC 20210.
Deliveries (hand, express mail,
messenger, and courier service) are
accepted during the Department of
Labor’s and Docket Office’s normal
business hours, 8:15 a.m. to 4:45 p.m.,
e.t.
Instructions: All submissions must
include the Agency name and OSHA
docket number for the ICR (OSHA–
2007–0036). All comments, including
any personal information you provide,
are placed in the public docket without
VerDate Aug<31>2005
18:39 Apr 05, 2007
Jkt 211001
change, and may be made available
online at https://www.regulations.gov.
For further information on submitting
comments see the ‘‘Public
Participation’’ heading in the section of
this notice titled SUPPLEMENTARY
INFORMATION.
Docket: To read or download
comments or other material in the
docket, go to https://www.regulations.gov
or the OSHA Docket Office at the
address above. All documents in the
docket (including this Federal Register
notice) are listed in the https://
www.regulations.gov index; however,
some information (e.g., copyrighted
material) is not publicly available to
read or download through the Web site.
All submissions, including copyrighted
material, are available for inspection
and copying at the OSHA Docket Office.
You may also contact Theda Kenney at
the address below to obtain a copy of
the ICR.
FOR FURTHER INFORMATION CONTACT:
Theda Kenney or Todd Owen,
Directorate of Standards and Guidance,
OSHA, U.S. Department of Labor, Room
N–3609, 200 Constitution Avenue, NW.,
Washington, DC 20210; telephone (202)
693–2222.
SUPPLEMENTARY INFORMATION:
I. Background
The Department of Labor, as part of its
continuing effort to reduce paperwork
and respondent (i.e., employer) burden,
conducts a preclearance consultation
program to provide the public with an
opportunity to comment on proposed
and continuing information collection
requirements in accordance with the
Paperwork Reduction Act of 1995 (44
U.S.C. 3506(c)(2)(A)). This program
ensures that information is in the
desired format, reporting burden (time
and costs) is minimal, collection
instruments are clearly understood, and
OSHA’s estimate of the information
collection burden is accurate. The
Occupational Safety and Health Act of
1970 (the OSH Act) (29 U.S.C. 651 et
seq.) authorizes information collection
by employers as necessary or
appropriate for enforcement of the Act
or for developing information regarding
the causes and prevention of
occupational injuries, illnesses, and
accidents (29 U.S.C. 657). The OSH Act
also requires that OSHA obtain such
information with minimum burden
upon employers, especially those
operating small businesses, and to
reduce to the maximum extent feasible
unnecessary duplication of efforts in
obtaining information (29 U.S.C. 657).
The Standard specifies several
paperwork requirements. The following
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
sections describe who uses the
information collected under each
requirement, as well as how they use it.
Paragraph (e)(1)(i) of § 1910.217
requires employers to establish and
follow a program of periodic and regular
inspections of power presses to ensure
that all their parts, auxiliary equipment,
and safeguards are in safe operating
condition and adjustment. Employers
must maintain a certification record of
inspections that includes the date of
inspection, the signature of the person
who performed the inspection, and the
serial number, or other identifier, of the
power press that was inspected.
Paragraph (e)(1)(ii) of § 1910.217
requires employers to inspect and test
each press no less than weekly to
determine the condition of the clutch/
brake mechanism, antirepeat feature,
and single-stroke mechanism.
Employers must perform and complete
necessary maintenance or repair or both
before the press is operated. In addition,
employers must maintain a record of
inspections, tests, and maintenance
work. The record must include the date
of the inspection, test, or maintenance;
the signature of the person who
performed the inspection, test, or
maintenance; and the serial number, or
other identifier, of the press that was
inspected, tested, or maintained.
The certification records required in
29 CFR 1910.217(e)(1)(i) and (e)(1)(ii)
are necessary to ensure compliance with
the requirement to inspect mechanical
power presses. The inspection of
mechanical power presses is critical to
ensuring that employers maintain the
presses in safe operating condition for
employees. These records also provide
the most efficient means for the
compliance officers to determine that an
employer is complying with the
Standard.
II. Special Issues for Comment
OSHA has a particular interest in
comments on the following issues:
• Whether the proposed information
collection requirements are necessary
for the proper performance of the
Agency’s functions, including whether
the information is useful;
• The accuracy of OSHA’s estimate of
the burden (time and costs) of the
information collection requirements,
including the validity of the
methodology and assumptions used;
• The quality, utility, and clarity of
the information collected; and
• Ways to minimize the burden on
employers who must comply; for
example, by using automated or other
technological information collection
and transmission techniques.
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 72, No. 66 / Friday, April 6, 2007 / Notices
III. Proposed Actions
OSHA is requesting that OMB extend
its approval of the information
collection requirements contained in the
Standard on Mechanical Power Presses
(29 CFR 1910.217(e)(1)(i) and (e)(1)(ii)).
The Agency is requesting to retain its
existing burden hour estimate
associated with this Standard at
1,373,054. The Agency will summarize
the comments submitted in response to
this notice, and will include this
summary in the request to OMB.
Type of Review: Extension of a
currently approved collection.
Title: Standard on Mechanical Power
Presses (29 CFR 1910.217(e)(1)(i) and
(e)(1)(ii)).
OMB Number: 1218–0229.
Affected Public: Business or other forprofit.
Number of Respondents: 295,000.
Frequency: Monthly, weekly.
Average Time per Response: Varies
from 2 minutes (.03 hour) to disclose
certification records to 20 minutes (.33
hour) to inspect the parts, auxiliary
equipment, and safeguards of each
mechanical power press.
Total Annual Burden Hours:
1,373,054.
Estimated Cost (Operation and
Maintenance): $0.
pwalker on PROD1PC71 with NOTICES
IV. Public Participation—Submission of
Comments on this Notice and Internet
Access to Comments and Submissions
You may submit comments in
response to this document as follows:
(1) Electronically at https://
www.regulations.gov, which is the
Federal eRulemaking Portal; (2) by
facsimile (FAX); or (3) by hard copy. All
comments, attachments, and other
material must identify the Agency name
and the OSHA docket number for the
ICR (OSHA Docket No. OSHA–2007–
0036). You may supplement electronic
submissions by uploading document
files electronically. If you wish to mail
additional materials in reference to an
electronic or facsimile submission, you
must submit them to the OSHA Docket
Office (see the section of this notice
titled ADDRESSES). The additional
materials must clearly identify your
electronic comments by your name,
date, and the docket number so the
Agency can attach them to your
comments.
Because of security procedures, the
use of regular mail may cause a
significant delay in the receipt of
comments. For information about
security procedures concerning the
delivery of materials by hand, express
delivery, messenger, or courier service,
please contact the OSHA Docket Office
VerDate Aug<31>2005
18:39 Apr 05, 2007
Jkt 211001
at (202) 693–2350 (TTY (877) 889–
5627).
Comments and submissions are
posted without change at https://
www.regulations.gov. Therefore, OSHA
cautions commenters about submitting
personal information such as social
security numbers and date of birth.
Although all submissions are listed in
the https://www.regulations.gov index,
some information (e.g., copyrighted
material) is not publicly available to
read or download through this website.
All submissions, including copyrighted
material, are available for inspection
and copying at the OSHA Docket Office.
Information on using the https://
www.regulations.gov Web site to submit
comments and access the docket is
available at the Web site’s ‘‘User Tips’’
link. Contact the OSHA Docket Office
for information about materials not
available through the Web site, and for
assistance in using the Internet to locate
docket submissions.
Electronic copies of this Federal
Register document are available at
https://www.regulations.gov. This
document as well as news releases and
other relevant information also are
available at OSHA’s Web page at https://
www.osha.gov.
V. Authority and Signature
Edwin G. Foulke, Jr., Assistant
Secretary of Labor for Occupational
Safety and Health, directed the
preparation of this notice. The authority
for this notice is the Paperwork
Reduction Act of 1995 (44 U.S.C. 3506
et seq.) and Secretary of Labor’s Order
No. 5–2002 (67 FR 65008).
Signed at Washington, DC, on April 3,
2007.
Edwin G. Foulke, Jr.,
Assistant Secretary of Labor.
[FR Doc. E7–6434 Filed 4–5–07; 8:45 am]
BILLING CODE 4510–26–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 70–27]
Notice of Issuance of Renewed
License, BWX Technologies, Inc.,
Lynchburg, VA
Nuclear Regulatory
Commission.
ACTION: Notice of issuance of license.
AGENCY:
(NRC), Mail Stop T–8F42, Washington,
DC 20555, telephone: (301) 415–5848;
fax number (301) 415–5955; e-mail:
bcg@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
Pursuant to 10 CFR 2.106, the NRC is
providing notice of issuance of
Materials License SNM–42 to BWX
Technologies, Inc., (the licensee), to
authorize continuing operation of the
licensee’s Mt. Athos facility in
Lynchburg, Virginia. The licensee’s
request for the renewal of its license was
previously noticed in the Federal
Register on March 6, 2006 (71 FR
11231), with a notice of opportunity to
request a hearing that was open for 60
days. No requests for a hearing were
received during the 60-day period. The
associated Environmental Assessment
and Finding of No Significant Impact
was published in the Federal Register
on March 31, 2006.
This renewed license complies with
standards and requirements of the
Atomic Energy Act of 1954, as amended,
and NRC’s regulations as set forth in 10
CFR Chapter I. Accordingly, the
renewed license was issued on March
29, 2007 and was effective immediately.
II. Further Information
The NRC prepared a Safety and
Safeguards Evaluation Report that
documented the information reviewed,
including NRC’s conclusion. The Safety
and Safeguards Evaluation Report and
other related documents contain
sensitive, unclassified security
information, and is therefore deemed
Official Use Only and will not be placed
in the Public Document Room or the
Publicly Available Records component
of the NRC’s Agencywide Documents
Access and Management System
(ADAMS) document system.
Dated at Rockville, Maryland, this 29th day
of March 2007.
For the Nuclear Regulatory Commission.
Gary S. Janosko,
Deputy Director, Fuel Facility Licensing
Directorate, Division of Fuel Cycle Safety and
Safeguards, Office of Nuclear Material Safety
and Safeguards.
[FR Doc. E7–6480 Filed 4–5–07; 8:45 am]
BILLING CODE 7590–01–P
FOR FURTHER INFORMATION CONTACT:
Billy Gleaves, Project Manager, Fuel
Manufacturing Branch, Division of Fuel
Cycle Safety and Safeguards, Office of
Nuclear Material Safety and Safeguards,
U.S. Nuclear Regulatory Commission
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
17195
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 72, Number 66 (Friday, April 6, 2007)]
[Notices]
[Pages 17194-17195]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-6434]
-----------------------------------------------------------------------
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
[Docket No. OSHA-2007-0036]
Mechanical Power Presses Standard; Extension of the Office of
Management and Budget's (OMB) Approval of Information Collection
(Paperwork) Requirements
AGENCY: Occupational Safety and Health Administration (OSHA), Labor.
ACTION: Request for public comment.
-----------------------------------------------------------------------
SUMMARY: OSHA solicits comments concerning its proposal to extend OMB
approval of the information collection requirements contained in the
Standard on Mechanical Power Presses (29 CFR 1910.217(e)(1)(i) and
(e)(1)(ii)). The purpose of these requirements is to reduce employees'
risk of death or serious injury by ensuring that employers maintain the
mechanical power presses used by the employees in safe operating
condition.
DATES: Comments must be submitted (postmarked, sent, or received) by
June 5, 2007.
ADDRESSES:
Electronically: You may submit comments and attachments
electronically at https://www.regulations.gov, which is the Federal
eRulemaking Portal. Follow the instructions online for submitting
comments.
Facsimile: If your comments, including attachments, are not longer
than 10 pages, you may fax them to the OSHA Docket Office at (202) 693-
1648.
Mail, hand delivery, express mail, messenger, or courier service:
When using this method, you must submit three copies of your comments
and attachments to the OSHA Docket Office, OSHA Docket No. OSHA-2007-
0036, U.S. Department of Labor, Occupational Safety and Health
Administration, Room N-2625, 200 Constitution Avenue, NW., Washington,
DC 20210. Deliveries (hand, express mail, messenger, and courier
service) are accepted during the Department of Labor's and Docket
Office's normal business hours, 8:15 a.m. to 4:45 p.m., e.t.
Instructions: All submissions must include the Agency name and OSHA
docket number for the ICR (OSHA-2007-0036). All comments, including any
personal information you provide, are placed in the public docket
without change, and may be made available online at https://
www.regulations.gov. For further information on submitting comments see
the ``Public Participation'' heading in the section of this notice
titled SUPPLEMENTARY INFORMATION.
Docket: To read or download comments or other material in the
docket, go to https://www.regulations.gov or the OSHA Docket Office at
the address above. All documents in the docket (including this Federal
Register notice) are listed in the https://www.regulations.gov index;
however, some information (e.g., copyrighted material) is not publicly
available to read or download through the Web site. All submissions,
including copyrighted material, are available for inspection and
copying at the OSHA Docket Office. You may also contact Theda Kenney at
the address below to obtain a copy of the ICR.
FOR FURTHER INFORMATION CONTACT: Theda Kenney or Todd Owen, Directorate
of Standards and Guidance, OSHA, U.S. Department of Labor, Room N-3609,
200 Constitution Avenue, NW., Washington, DC 20210; telephone (202)
693-2222.
SUPPLEMENTARY INFORMATION:
I. Background
The Department of Labor, as part of its continuing effort to reduce
paperwork and respondent (i.e., employer) burden, conducts a
preclearance consultation program to provide the public with an
opportunity to comment on proposed and continuing information
collection requirements in accordance with the Paperwork Reduction Act
of 1995 (44 U.S.C. 3506(c)(2)(A)). This program ensures that
information is in the desired format, reporting burden (time and costs)
is minimal, collection instruments are clearly understood, and OSHA's
estimate of the information collection burden is accurate. The
Occupational Safety and Health Act of 1970 (the OSH Act) (29 U.S.C. 651
et seq.) authorizes information collection by employers as necessary or
appropriate for enforcement of the Act or for developing information
regarding the causes and prevention of occupational injuries,
illnesses, and accidents (29 U.S.C. 657). The OSH Act also requires
that OSHA obtain such information with minimum burden upon employers,
especially those operating small businesses, and to reduce to the
maximum extent feasible unnecessary duplication of efforts in obtaining
information (29 U.S.C. 657).
The Standard specifies several paperwork requirements. The
following sections describe who uses the information collected under
each requirement, as well as how they use it.
Paragraph (e)(1)(i) of Sec. 1910.217 requires employers to
establish and follow a program of periodic and regular inspections of
power presses to ensure that all their parts, auxiliary equipment, and
safeguards are in safe operating condition and adjustment. Employers
must maintain a certification record of inspections that includes the
date of inspection, the signature of the person who performed the
inspection, and the serial number, or other identifier, of the power
press that was inspected.
Paragraph (e)(1)(ii) of Sec. 1910.217 requires employers to
inspect and test each press no less than weekly to determine the
condition of the clutch/brake mechanism, antirepeat feature, and
single-stroke mechanism. Employers must perform and complete necessary
maintenance or repair or both before the press is operated. In
addition, employers must maintain a record of inspections, tests, and
maintenance work. The record must include the date of the inspection,
test, or maintenance; the signature of the person who performed the
inspection, test, or maintenance; and the serial number, or other
identifier, of the press that was inspected, tested, or maintained.
The certification records required in 29 CFR 1910.217(e)(1)(i) and
(e)(1)(ii) are necessary to ensure compliance with the requirement to
inspect mechanical power presses. The inspection of mechanical power
presses is critical to ensuring that employers maintain the presses in
safe operating condition for employees. These records also provide the
most efficient means for the compliance officers to determine that an
employer is complying with the Standard.
II. Special Issues for Comment
OSHA has a particular interest in comments on the following issues:
Whether the proposed information collection requirements
are necessary for the proper performance of the Agency's functions,
including whether the information is useful;
The accuracy of OSHA's estimate of the burden (time and
costs) of the information collection requirements, including the
validity of the methodology and assumptions used;
The quality, utility, and clarity of the information
collected; and
Ways to minimize the burden on employers who must comply;
for example, by using automated or other technological information
collection and transmission techniques.
[[Page 17195]]
III. Proposed Actions
OSHA is requesting that OMB extend its approval of the information
collection requirements contained in the Standard on Mechanical Power
Presses (29 CFR 1910.217(e)(1)(i) and (e)(1)(ii)). The Agency is
requesting to retain its existing burden hour estimate associated with
this Standard at 1,373,054. The Agency will summarize the comments
submitted in response to this notice, and will include this summary in
the request to OMB.
Type of Review: Extension of a currently approved collection.
Title: Standard on Mechanical Power Presses (29 CFR
1910.217(e)(1)(i) and (e)(1)(ii)).
OMB Number: 1218-0229.
Affected Public: Business or other for-profit.
Number of Respondents: 295,000.
Frequency: Monthly, weekly.
Average Time per Response: Varies from 2 minutes (.03 hour) to
disclose certification records to 20 minutes (.33 hour) to inspect the
parts, auxiliary equipment, and safeguards of each mechanical power
press.
Total Annual Burden Hours: 1,373,054.
Estimated Cost (Operation and Maintenance): $0.
IV. Public Participation--Submission of Comments on this Notice and
Internet Access to Comments and Submissions
You may submit comments in response to this document as follows:
(1) Electronically at https://www.regulations.gov, which is the Federal
eRulemaking Portal; (2) by facsimile (FAX); or (3) by hard copy. All
comments, attachments, and other material must identify the Agency name
and the OSHA docket number for the ICR (OSHA Docket No. OSHA-2007-
0036). You may supplement electronic submissions by uploading document
files electronically. If you wish to mail additional materials in
reference to an electronic or facsimile submission, you must submit
them to the OSHA Docket Office (see the section of this notice titled
ADDRESSES). The additional materials must clearly identify your
electronic comments by your name, date, and the docket number so the
Agency can attach them to your comments.
Because of security procedures, the use of regular mail may cause a
significant delay in the receipt of comments. For information about
security procedures concerning the delivery of materials by hand,
express delivery, messenger, or courier service, please contact the
OSHA Docket Office at (202) 693-2350 (TTY (877) 889-5627).
Comments and submissions are posted without change at https://
www.regulations.gov. Therefore, OSHA cautions commenters about
submitting personal information such as social security numbers and
date of birth. Although all submissions are listed in the https://
www.regulations.gov index, some information (e.g., copyrighted
material) is not publicly available to read or download through this
website. All submissions, including copyrighted material, are available
for inspection and copying at the OSHA Docket Office. Information on
using the https://www.regulations.gov Web site to submit comments and
access the docket is available at the Web site's ``User Tips'' link.
Contact the OSHA Docket Office for information about materials not
available through the Web site, and for assistance in using the
Internet to locate docket submissions.
Electronic copies of this Federal Register document are available
at https://www.regulations.gov. This document as well as news releases
and other relevant information also are available at OSHA's Web page at
https://www.osha.gov.
V. Authority and Signature
Edwin G. Foulke, Jr., Assistant Secretary of Labor for Occupational
Safety and Health, directed the preparation of this notice. The
authority for this notice is the Paperwork Reduction Act of 1995 (44
U.S.C. 3506 et seq.) and Secretary of Labor's Order No. 5-2002 (67 FR
65008).
Signed at Washington, DC, on April 3, 2007.
Edwin G. Foulke, Jr.,
Assistant Secretary of Labor.
[FR Doc. E7-6434 Filed 4-5-07; 8:45 am]
BILLING CODE 4510-26-P