Notice of Application Accepted for Filing and Soliciting Comments, Protests, and Motions To Intervene, 2222-2223 [E6-261]
Download as PDF
2222
Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices
January 25, 2006 ..............................................
January 26, 2006 ..............................................
January 27, 2006 ..............................................
The public scoping meetings are
designed to provide State and local
agencies, interested groups, affected
landowners, and the general public with
another opportunity to offer your
comments on the Project. Interested
groups and individuals are encouraged
to attend the meetings and to present
comments on the environmental issues
they believe should be addressed in the
EIS. A transcript of each meeting will be
made so that your comments will be
accurately recorded.
All public meetings will be posted on
the Commission’s calendar located at
https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
hsrobinson on PROD1PC70 with NOTICES
Environmental Mailing List
If you received this notice, you are on
the environmental mailing list for this
Project and will continue to receive
Project updates including the draft and
final EISs. If you want your contact
information corrected or you do not
want to remain on our mailing list,
please return the Correct or Remove
From Mailing List Form included as
Appendix 2.
To reduce printing and mailing costs,
the draft and final EISs will be issued
in both CD–ROM and hard copy
formats. The FERC strongly encourages
the use of the CD–ROM format in its
publication of large documents. If you
wish to receive a paper copy of the draft
EIS instead of a CD–ROM, you must
indicate that choice on the return
postcard (Appendix 2).
Additional Information
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
VerDate Aug<31>2005
15:41 Jan 12, 2006
Jkt 208001
North Platte, Nebraska, Quality Inn
Sandhills Convention Center, 2102 South
Jeffers, North Platte, Nebraska, 308–532–
9090.
Kearney, Nebraska, Holiday Inn Kearney,
110 Second Avenue, Kearney, Nebraska,
308–234–2212.
Hastings, Nebraska, Hastings Convention
Center, Holiday Inn Garden Center, 2201
Osborne Drive, Hastings, Nebraska, 402–
463–4661.
Beatrice, Nebraska, Holiday Inn Express,
4005 N. 6th Street, Beatrice, Nebraska,
402–228–7000.
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
g. Applicant contact: Mr. Brent Smith,
Northwest Power Services, Inc., 975
South State Highway, Logan, UT 84321,
(208) 745–0834.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12617–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Existing Facilities
and Proposed Project: The proposed
project, utilizing the existing U.S. Army
Corps of Engineers’ Fall Creek Dam and
reservoir would consist of: (1) A
proposed intake structure, (2) a
proposed 650-foot-long, 144-inchdiameter steel penstock, (3) a proposed
powerhouse containing a generator unit
with an installed capacity of 4.7
megawatts, (4) a 1.0-mile-long, 15 kV
transmission line, and (5) appurtenant
facilities. The project would have an
annual generation of 17.9 GWh.
k. Location of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
Magalie R. Salas,
Secretary.
[FR Doc. E6–287 Filed 1–12–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions To Intervene
January 5, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12617–000.
c. Date filed: October 3, 2005.
d. Applicant: Fall Creek Hydro, LLC.
e. Name and Location of Project: The
proposed Fall Creek Hydroelectric
Project would be located on Fall Creek
in Lane County, Oregon. The existing
Fall Creek Dam is administered by the
U.S. Army Corps of Engineers.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Moberly, Missouri, Best Western Inn, 1200
Hwy 24 East, Moberly, Missouri, 660–
263–6540.
Chillicothe, Missouri, Grand River Inn, 606
W. Bus. Hwy 36, Chillicothe, Missouri,
888–317–8290.
E:\FR\FM\13JAN1.SGM
13JAN1
hsrobinson on PROD1PC70 with NOTICES
Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
n. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
o. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
VerDate Aug<31>2005
15:41 Jan 12, 2006
Jkt 208001
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001 (a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
r. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘NOTICE OF INTENT TO FILE
COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
2223
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–261 Filed 1–12–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
January 5, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
license to revise to install minimum
flow turbine.
b. Project No: 2513–066.
c. Date Filed: December 19, 2005.
d. Applicant: Green Mountain Power
Corporation.
e. Name of Project: Essex 19 Project.
f. Location: The Project is located on
the Winooski River in the townships of
Essex Junction and Williston,
Chittenden County, Vermont.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Green Mountain
Power Corporation, 163 Acorn Lane,
Colchester, VT 05446–1949. Tel: (802)
655–8777.
i. FERC Contact: Any questions on
this notice should be addressed to
Vedula Sarma at (202) 502–6190 or
vedula.sarma@ferc.gov.
j. Deadline for filing comments and/
or motions: February 3, 2006.
k. Description of Filing: Green
Mountain Power Corporation proposes
to install a 850 kilowatt minimum flow
generating unit to provide greater
hydraulic control in maintaining the
project’s required minimum flow while
allowing for more efficient operation
and generation during both high and
low flow conditions.
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street NE.,
Room 2A, Washington DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
E:\FR\FM\13JAN1.SGM
13JAN1
Agencies
[Federal Register Volume 71, Number 9 (Friday, January 13, 2006)]
[Notices]
[Pages 2222-2223]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-261]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting
Comments, Protests, and Motions To Intervene
January 5, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12617-000.
c. Date filed: October 3, 2005.
d. Applicant: Fall Creek Hydro, LLC.
e. Name and Location of Project: The proposed Fall Creek
Hydroelectric Project would be located on Fall Creek in Lane County,
Oregon. The existing Fall Creek Dam is administered by the U.S. Army
Corps of Engineers.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
g. Applicant contact: Mr. Brent Smith, Northwest Power Services,
Inc., 975 South State Highway, Logan, UT 84321, (208) 745-0834.
h. FERC Contact: Tom Papsidero, (202) 502-6002.
i. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-12617-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
j. Description of Existing Facilities and Proposed Project: The
proposed project, utilizing the existing U.S. Army Corps of Engineers'
Fall Creek Dam and reservoir would consist of: (1) A proposed intake
structure, (2) a proposed 650-foot-long, 144-inch-diameter steel
penstock, (3) a proposed powerhouse containing a generator unit with an
installed capacity of 4.7 megawatts, (4) a 1.0-mile-long, 15 kV
transmission line, and (5) appurtenant facilities. The project would
have an annual generation of 17.9 GWh.
k. Location of Applications: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site at https://
[[Page 2223]]
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item g
above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
n. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
o. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
p. Proposed Scope of Studies Under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
q. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and
the instructions on the Commission's Web site under ``e-filing'' link.
The Commission strongly encourages electronic filing.
r. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Hydropower Administration and Compliance, Federal Energy
Regulatory Commission, at the above-mentioned address. A copy of any
notice of intent, competing application or motion to intervene must
also be served upon each representative of the Applicant specified in
the particular application.
s. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-261 Filed 1-12-06; 8:45 am]
BILLING CODE 6717-01-P