Submission for OMB Review: Comment Request, 8113 [05-3075]
Download as PDF
Federal Register / Vol. 70, No. 32 / Thursday, February 17, 2005 / Notices
DEPARTMENT OF LABOR
Office of the Secretary
Submission for OMB Review:
Comment Request
February 11, 2005.
The Department of Labor (DOL) has
submitted the following public
information collection request (ICR) to
the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act of 1995 (Pub. L. 104–13,
44 U.S.C. chapter 35). A copy of this
ICR, with applicable supporting
documentation, may be obtained by
contacting Darrin King on 202–693–
4129 (this is not a toll-free number) or
e-mail: king.darrin@dol.gov.
Comments should be sent to Office of
Information and Regulatory Affairs,
Attn: OMB Desk Officer for the
Occupational Safety and Health
Administration (OSHA), Office of
Management and Budget, Room 10235,
Washington, DC 20503, 202–395–7316
(this is not a toll-free number), within
30 days from the date of this publication
in the Federal Register.
The OMB is particularly interested in
comments which:
• Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the agency, including
whether the information will have
practical utility;
• Evaluate the accuracy of the
agency’s estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used;
• Enhance the quality, utility, and
clarity of the information to be
collected; and
• Minimize the burden of the
collection of information on those who
are to respond, including through the
use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses.
Agency: Occupational Safety and
Health Administration.
Type of Review: Extension of
currently approved collection.
Title: Grain Handling Facilities (29
CFR 1910.272).
OMB Number: 1218–0206.
Frequency: On occasion and
Annually.
Type of Response: Recordkeeping and
Third party disclosure.
Affected Public: Business or other forprofit; Not-for-profit institutions;
VerDate jul<14>2003
14:41 Feb 16, 2005
Jkt 205001
Federal Government; and State, local, or
tribal government.
Number of Respondents: 19,791.
Number of Annual Responses:
1,406,486.
Estimated Time Per Response: Varies
from 2 minutes to affix a tag on
deenergized equipment to 3 hours to
develop or modify procedures for tags
and locks.
Total Burden Hours: 73,572.
Total Annualized capital/startup
costs: $0.
Total Annual Costs (operating/
maintaining systems or purchasing
services): $0.
Description: The Grain Handling
Facilities Standard (the Standard) (29
CFR 1910.272) specifies several
paperwork requirements. The following
sections describe what information is
collected under each requirement, who
uses the information, and how they use
it.
Paragraph (d) of the standard requires
the employer to develop and implement
an emergency action plan so that
employees will be aware of the
appropriate actions to take in the event
of an emergency.
Paragraph (e)(1) requires that
employers provide training to
employees at least annually and when
changes in job assignment will expose
them to new hazards.
Paragraph (f)(1) requires the employer
to issue a permit for all hot work. Under
paragraph (f)(2) the permit shall certify
that the requirements contained in
1910.272(a) have been implemented
prior to beginning the hot work
operations and shall be kept on file until
completion of the hot work operation.
Paragraph (g)(1)(i) requires the
employer to issue a permit for entering
bins, silos, or tanks unless the employer
or the employer’s representative is
present during the entire operation. The
permit shall certify that the precautions
contained in paragraph (g) have been
implemented prior to employees
entering bins, silos or tanks and shall be
kept on file until completion of the
entry operations.
Paragraph (g)(4) requires the employer
to implement procedures for the use of
tags and locks which will prevent the
inadvertent application of energy or
motion to equipment being repaired,
serviced, or adjusted.
Paragraphs (i)(1) and (i)(2) require the
employer to inform contractors
performing work at the grain handling
facility of known potential fire and
explosion hazards related to the
contractor’s work area and to explain to
the contractor the applicable provisions
of the emergency action plan.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
8113
Paragraph (j)(1) requires the employer
to develop and implement a written
housekeeping program that establishes
the frequency and method(s)
determined best to reduce
accumulations of fugitive grain dust on
ledges, floors, equipment, and other
exposed surfaces.
The purpose of the housekeeping
program is to require employers to have
a planned course of action for the
control and reduction of dust in grain
handling facilities reducing the fuel
available in a grain facility. The
housekeeping program must specify in
writing the frequency that housekeeping
will be performed and the dust control
methods that the employer believes will
best reduce dust accumulations in the
facility.
Under paragraph (m)(1), the employer
is required to implement preventive
maintenance procedures consisting of
regularly scheduled inspections of at
least the mechanical and safety control
equipment associated with dryers, grain
stream processing equipment, dust
collection equipment including filer
collectors, and bucket elevators.
Paragraph (m)(3) requires a certification
be maintained of each inspection.
Darrin A. King,
Acting Departmental Clearance Officer.
[FR Doc. 05–3075 Filed 2–16–05; 8:45 am]
BILLING CODE 4510–26–P
DEPARTMENT OF LABOR
Office of the Secretary
Submission for OMB Review:
Comment Request
February 11, 2005.
The Department of Labor (DOL) has
submitted the following public
information collection requests (ICRs) to
the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act of 1995 (Pub. L. 104–13,
44 U.S.C. chapter 35). A copy of each
ICR, with applicable supporting
documentation, may be obtained by
contacting Darrin King on 202–693–
4129 (this is not a toll-free number) or
e-mail: king.darrin@dol.gov.
Comments should be sent to Office of
Information and Regulatory Affairs,
Attn: OMB Desk Officer for the Mine
Safety and Health Administration
(MSHA), Office of Management and
Budget, Room 10235, Washington, DC
20503, 202–395–7316 (this is not a tollfree number), within 30 days from the
date of this publication in the Federal
Register.
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 70, Number 32 (Thursday, February 17, 2005)]
[Notices]
[Page 8113]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-3075]
[[Page 8113]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF LABOR
Office of the Secretary
Submission for OMB Review: Comment Request
February 11, 2005.
The Department of Labor (DOL) has submitted the following public
information collection request (ICR) to the Office of Management and
Budget (OMB) for review and approval in accordance with the Paperwork
Reduction Act of 1995 (Pub. L. 104-13, 44 U.S.C. chapter 35). A copy of
this ICR, with applicable supporting documentation, may be obtained by
contacting Darrin King on 202-693-4129 (this is not a toll-free number)
or e-mail: king.darrin@dol.gov.
Comments should be sent to Office of Information and Regulatory
Affairs, Attn: OMB Desk Officer for the Occupational Safety and Health
Administration (OSHA), Office of Management and Budget, Room 10235,
Washington, DC 20503, 202-395-7316 (this is not a toll-free number),
within 30 days from the date of this publication in the Federal
Register.
The OMB is particularly interested in comments which:
Evaluate whether the proposed collection of information is
necessary for the proper performance of the functions of the agency,
including whether the information will have practical utility;
Evaluate the accuracy of the agency's estimate of the
burden of the proposed collection of information, including the
validity of the methodology and assumptions used;
Enhance the quality, utility, and clarity of the
information to be collected; and
Minimize the burden of the collection of information on
those who are to respond, including through the use of appropriate
automated, electronic, mechanical, or other technological collection
techniques or other forms of information technology, e.g., permitting
electronic submission of responses.
Agency: Occupational Safety and Health Administration.
Type of Review: Extension of currently approved collection.
Title: Grain Handling Facilities (29 CFR 1910.272).
OMB Number: 1218-0206.
Frequency: On occasion and Annually.
Type of Response: Recordkeeping and Third party disclosure.
Affected Public: Business or other for-profit; Not-for-profit
institutions; Federal Government; and State, local, or tribal
government.
Number of Respondents: 19,791.
Number of Annual Responses: 1,406,486.
Estimated Time Per Response: Varies from 2 minutes to affix a tag
on deenergized equipment to 3 hours to develop or modify procedures for
tags and locks.
Total Burden Hours: 73,572.
Total Annualized capital/startup costs: $0.
Total Annual Costs (operating/maintaining systems or purchasing
services): $0.
Description: The Grain Handling Facilities Standard (the Standard)
(29 CFR 1910.272) specifies several paperwork requirements. The
following sections describe what information is collected under each
requirement, who uses the information, and how they use it.
Paragraph (d) of the standard requires the employer to develop and
implement an emergency action plan so that employees will be aware of
the appropriate actions to take in the event of an emergency.
Paragraph (e)(1) requires that employers provide training to
employees at least annually and when changes in job assignment will
expose them to new hazards.
Paragraph (f)(1) requires the employer to issue a permit for all
hot work. Under paragraph (f)(2) the permit shall certify that the
requirements contained in 1910.272(a) have been implemented prior to
beginning the hot work operations and shall be kept on file until
completion of the hot work operation.
Paragraph (g)(1)(i) requires the employer to issue a permit for
entering bins, silos, or tanks unless the employer or the employer's
representative is present during the entire operation. The permit shall
certify that the precautions contained in paragraph (g) have been
implemented prior to employees entering bins, silos or tanks and shall
be kept on file until completion of the entry operations.
Paragraph (g)(4) requires the employer to implement procedures for
the use of tags and locks which will prevent the inadvertent
application of energy or motion to equipment being repaired, serviced,
or adjusted.
Paragraphs (i)(1) and (i)(2) require the employer to inform
contractors performing work at the grain handling facility of known
potential fire and explosion hazards related to the contractor's work
area and to explain to the contractor the applicable provisions of the
emergency action plan.
Paragraph (j)(1) requires the employer to develop and implement a
written housekeeping program that establishes the frequency and
method(s) determined best to reduce accumulations of fugitive grain
dust on ledges, floors, equipment, and other exposed surfaces.
The purpose of the housekeeping program is to require employers to
have a planned course of action for the control and reduction of dust
in grain handling facilities reducing the fuel available in a grain
facility. The housekeeping program must specify in writing the
frequency that housekeeping will be performed and the dust control
methods that the employer believes will best reduce dust accumulations
in the facility.
Under paragraph (m)(1), the employer is required to implement
preventive maintenance procedures consisting of regularly scheduled
inspections of at least the mechanical and safety control equipment
associated with dryers, grain stream processing equipment, dust
collection equipment including filer collectors, and bucket elevators.
Paragraph (m)(3) requires a certification be maintained of each
inspection.
Darrin A. King,
Acting Departmental Clearance Officer.
[FR Doc. 05-3075 Filed 2-16-05; 8:45 am]
BILLING CODE 4510-26-P