Wyoming Administrative Code
Agency 055 - Oil and Gas Conservation Commission
Sub-Agency 0001 - General Agency, Board or Commission Rules
Chapter 3 - OPERATIONAL RULES, DRILLING RULES
Section 3-35 - Production Test and Gas-Oil Ratio Report (Forms 10 through 13)
Current through September 21, 2024
(a) Gas-oil ratio reports can be required by the Supervisor on certain wells if it is deemed necessary to obtain information of this nature.
(b) An initial gas well test can be required by the Supervisor when such test is deemed necessary; the initial tests shall be multipoint back-pressure tests (stabilized multipoint or constant time multipoint or isochronal multipoint) or acceptable one-point back-pressure tests. The results shall be furnished to the Supervisor on acceptable forms. The methods prescribed in the Interstate Oil and Gas Compact Commission's "Manual of Gas Well Testing" or an alternate method approved by the Supervisor shall be used.
(c) As a guideline for multipoint tests, each flow rate duration shall be set at a minimum of thirty (30) minutes and a maximum of two (2) hours depending on stabilization. The shut-in period shall be a minimum of seventy-two (72) hours.
(d) On one-point tests, the flow rate shall be a minimum of twenty-four (24) hours, and the shut-in period shall be a minimum of seventy-two (72) hours.
(e) Gas-oil ratio reports for horizontal wells shall be filed upon initial completion and annually thereafter on Form 10.