Wyoming Administrative Code
Agency 020 - Environmental Quality, Dept. of
Sub-Agency 0011 - Water Quality
Chapter 27 - UNDERGROUND INJECTION CONTROL PROGRAM CLASS I AND V WELLS
Section 27-19 - Financial responsibility
Current through September 21, 2024
(a) The permittee of any Class I well shall demonstrate and maintain financial responsibility and resources to close, plug, abandon, reclaim, and maintain post-closure care for the underground injection operation in a manner prescribed by the Administrator. The permittee shall show evidence of such financial responsibility to the Administrator.
(b) All Class I hazardous waste and non-hazardous waste underground injection facilities and Class V coalbed methane produced water underground injection facilities that are permitted, are issued a permit renewal, or are issued a permit transfer after July 1, 2018, shall provide financial assurance in accordance with W.S. 35-11-302(a)(viii).
(c) At a minimum, the permittee shall prepare a written estimate, in current dollars, of the cost of plugging and abandonment of the well, surface reclamation, post-closure care, removal of infrastructure including but not limited to piping, above and below ground tanks, buildings, impoundments, access roads, fencing, electrical facilities, or any other physical materials used in the operation and maintenance of the injection well.
(d) The permittee shall keep the following at the facility during the operating life of the facility:
(e) The amount of the funds available shall be no less than the amount identified as the estimated cost.
(f) The obligation to maintain financial responsibility survives the termination of a permit or the cessation of injection. The requirements to maintain financial responsibility are enforceable regardless of whether the requirement is a condition of the permit
(g) The permittee of each facility shall establish financial assurance for each new and existing Class I hazardous waste or non-hazardous waste underground injection facility or Class V coalbed methane produced water injection facility and shall choose from the qualifying instruments below:
(h) Upon completion of any of the activities identified in the cost estimate, the amount of the financial surety required may be reduced by the Administrator.
(i) In addition to the other requirements of this section, the permittee of a Class I well injecting hazardous waste shall comply with the financial responsibility requirements of 40 CFR 144 Subpart F, which are in effect as of July 1, 2018.