(a) Surveyed corners: All site boundary corners shall be surveyed and marked with permanent survey caps.
(b) Posting standards: Each point of access shall be identified by a sign, that shall be easily readable, maintained in good condition and that contains at a minimum the following information:
(c) Access road standards: Facility access roads shall be constructed to enable use under inclement weather conditions.
(d) Topsoil standards: Topsoil from all disturbed areas shall be stripped and stockpiled in an area that will not be disturbed during facility operation. These stockpiles shall be identified by signs, and vegetated for stabilization. This topsoil shall be used for site reclamation. Topsoil shall not be removed from the facility without written authorization from the Department.
(e) Structural stability: Engineering measures shall be incorporated into the landfill design to ensure stability of structural components in unstable areas and seismic impact zones.
(f) Surface water structures: Surface water diversion structures shall be sized to collect and control runoff from the active portion of the landfill from at least the water volume resulting from a 24-hour, 25-year storm and prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm.
(g) Sediment control: Sediment control structures shall be designed and constructed in accordance with the Water Quality Division Rules and Regulations.
(h) Slope stability for excavations: Trench wall slopes shall not exceed a ratio of 1.5:1 (horizontal:vertical) unless a slope stability analysis demonstrates steeper slopes can be safely constructed and maintained. This analysis may be based on site specific soil stability calculations or Wyoming Occupational Safety and Health Administration regulations for excavations.
(i) Buffer zones: A buffer zone of at least 20 feet shall be maintained within the perimeter boundary.
(j) Cover material: Sufficient cover material shall be available to properly operate the facility through the closure period.
(k) Engineered containment: