Wyoming Administrative Code
Agency 020 - Environmental Quality, Dept. of
Sub-Agency 0009 - Solid Waste Management
Chapter 18 - DISPOSAL OF COAL COMBUSTION RESIDUALS IN LANDFILLS AND SURFACE IMPOUNDMENTS
Section 18-15 - Supporting Documentation/Appendices
Current through September 21, 2024
All permit application appendices shall, at a minimum, include the information in this section:
(a) USGS topographic map: A USGS topographic map with a scale of 1:24,000 with the proposed facility location shown; an original USGS topographic map with a scale of 1:62,500 or other suitable topographic map may be submitted if a 1:24,000 map is unavailable.
(b) Map or aerial photograph of the area: A map or aerial photograph of the area shall be submitted showing land ownership, land use and zoning within one mile of the disposal facility. The map or photograph shall be of sufficient scale to show all city boundaries, each occupied dwelling house, schools, hospitals, industrial buildings, water wells, water courses, roads, and other applicable details.
(c) General facility plot plan: A general facility plot plan (map) with a scale and contour intervals approved by the Administrator shall be submitted. The general facility plot plan shall at a minimum illustrate the following features:
(d) Additional facility plot plans: Additional facility plot plans, at the same scale as the general facility plot plan, shall be submitted as necessary to show orderly development and use of the facility through the life of the facility. These plot plans shall at a minimum contain the following information:
(e) Map showing proposed final contours: A map showing proposed final contours prepared at the same scale and contour intervals as the general facility plot plan shall be submitted.
(f) Map of facility boundaries: If the CCR unit is included in a larger industrial property, a map shall be included that shows the facility boundaries in relation to the overall boundaries of the industrial property.
(g) Cross sections and drawing details: Cross sections and drawing details shall be submitted with sufficient specifications to describe: